Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5103_JohnstonLF_leachatecleanouts_20200131
3 M C) a z 0 L V C t O 'C 0 0 s Q 0 'k TOPOGRAPHY PROVIDED BY GEODATA CORPORATION, BASED2, 2005 AERIAL PHOTOGRAPHY. TOPOGRAPHY IN LANDFILL ANDORROW AREAS PROVIDED BY GEODATA CORPORATION BASED ONHOTOGRAPHY DATED MAY 27, 2016 AND JUNE 18, 2018 FSITE COLLEC110N PIPING FROM AS -BUILT SURVEY DATED 2/26/97, — ��/ // / ��i 1 \\� � l\\ ASSOCIATES. IN PHASE 5 AREA REPRESENT TOP OF PROTECTIVE COVER %/ / // / H5 1 w Ike --250' 500, PREPARED FOR: DRAWN: APPROVED: SCALE: DATE: PREPARED BY: NC LIC. NO. F-13701ENGINEERINGI SC COA NO, C01488 LEACHATE COLLECTION PIPE CLEANOUT LOCATIONS C.T.J. P.K.S. AS SHOWN Mar 2019 SMITH+GARONER MSW PHASES 5 8 6 PROJECT NO.: FIGURE NO.: FILENAME: J O H N 16-4 3 B J O H N -AO773 14 N. Boylan Avenue, Raleigh NC 27603 1919.828.0577 1526 Richland St., Columbia SC 29201 © 2019 Smith Gardner, Inc. From Response to Comments letter, dated 1-22-2020 2. In Phases Sand 6, please provide a description of which leachate lime clean -out points will be covered ever and not accessible in the future, and whether those leachate lines will be accessible for cleaning from the sump end. Will the leachate lines in either Phases 5 or 6 be extended to the adjacent future phases? Phase 5 Cleanouts: development of Phase 6 will cause three cleanouts along the west side of Phase 5 to be covered over. Upon future development of Phase 10, two cleanouts on the south end of Phase 5 wall be covered over. Three cleanouts along the east side of phase 5 will remain long-term and these cleanouts will aLlow the flushing of the majority of the leachate collection system piping within Phase 5. The northernmost cleanout along the east side of Phase 5 leads directly to the gravity sump near the northwest corner of Phase 5. Phase 6 Cleanouts: Future development of Phase 7 will cause the westernmost cleanout at the south end of Phase 6 to he covered over. The central cleanout on the south end of Phase 6 can be extended during construction of Phase 7. This extended cleanout and the easternmost cleanout at the south end of Phase 6 will remain accessible until future development of Phase 10. All Lear -hate collection pipes in Phase 6 will remain accessible long-term from the north end of Phase 6.