Loading...
HomeMy WebLinkAboutCCB0057_SwiftCreek_InspectionReport_20190710STRUCTUAL FILL COAL ASH INSPECTION Notification Number/Site Name: CCB0057/Swift Creek CCB Fill Site County: Nash Date of Inspection / Site Visit: July 10, 2019 Inspection Performed by (Inspector / Division): Elizabeth Werner, Davy Conners and Benjamin Jackson (DWM) Physical Address / Crossroads of Location / GPS Location: 8097 North US 301 Battleboro, North Carolina; N: 36.08194 W: 77.74629 Size of Structural Fill: <10,000 cubic yards (CY) Between 10,000 and 100,000 CY X >100,000 CY Landowner verified: Full Circle Solutions Inc (Deed 2026 / 708) Robert Waldrop, 706-253-1051, BWaldrop@fcsi.biz President, Full Circle Solutions P.O. 1924 Jasper, GA 30143 David Francina on behalf of ReUse Technology Inc. and Goldman Sachs; K&L Gates Hearst Tower, 47th Floor 214 North Tryon Street Charlotte, North Carolina 704-331-7543, dove.fronchino@klgotes.com Current use of site? Has use changed from last inspection? Are there any areas of exposed ash? Design concerns (if applicable) Synthetic cap, vegetation over top in good condition. No exposed ash or signs of erosion observed. What is the proximity of the structural fill to receptors? Private Dwellings — no, see Figure 1, Proximity Map. Community Centers — no. Surface Water Features 50' (Lakes, Ponds, Wetlands, Streams) — yes, see Figure 2, Wetlands Map. Water Supply Wells 100'/500' (Public and Private) - unknown Page 1 of 11 Revised 2019 supplemental SF site inspection STRUCTUAL FILL COAL ASH INSPECTION Desktop Receptor Check Seasonal high groundwater table — unknown 100 year / 500 year floodplain — yes, see Figure 3, Flood Risk Map. Are there any known utilities in close proximity to, within and/or beneath the fill area? — unknown Past Noted Violations: (What were they and were the violations resolved?) Resolved — See the March 2018 Corrective Action Plan Additional Comments: Parcel ID-021984, PIN 387500004570. On November 11, 1991, ReUse Technology, Inc. submitted a letter to the Solid Waste Management Section seeking approval to use CCBs as structural fill material in the development of 25 acres of commercial property along Highway 301 at Swift Creek. On December 3, 1991, the Solid Waste Section issued a letter to ReUse that stated "Based upon the information received, the project appears to meet the guidelines previously agreed to for such reuse." In September 1992, ReUse began placement of CCBs at the site. In January 2003, the last shipment of CCBs was accepted at the site. On December 2, 2003, Full Circle Solutions, Inc., incorporated in Georgia, purchased the business assets of ReUse Technology, Inc. including the Swift Creek Project. According to records of Full Circle Solutions, Inc., a total of approximately 134,000 tons of CCBs were placed at the project. On March 23, 2003, the site had been graded, compacted, covered with an 18 inch soil cap and planted with grass seed. On November 4, 2004, the Closure Notice was forwarded to the Solid Waste Section. For a complete history, see the March 2018 Corrective Action Plan Davy Conners, DWM/Solid Waste Section Inspector Name and Division/Section _(919) 707-8290 Phone Number Page 2 of 11 Revised 2019 supplemental SF site inspection .;,� . �` ` � ` '4 � �y,,��;"z�,x,�•.;fir..., • - , a - Y ire. ^y� _ _ _, , : � . +���8radfeyrE chin Ln f , • i r E 4 Creek . � r STRUCTUAL FILL COAL ASH INSPECTION Figure 2: Wetlands Map Page 4 of 11 Revised 2019 supplemental SF site inspection STRUCTUAL FILL COAL ASH INSPECTION Figure 3: Flood Risk Map Page 5 of 11 Revised 2019 supplemental SF site inspection STRUCTUAL FILL COAL ASH INSPECTION Page 6 of 11 Revised 2019 supplemental SF site inspection TV lift } �r; �........... STRUCTUAL FILL COAL ASH INSPECTION Page 9 of 11 Revised 2019 supplemental SF site inspection STRUCTUAL FILL COAL ASH INSPECTION Page 10 of 11 Revised 2019 supplemental SF site inspection STRUCTUAL FILL COAL ASH INSPECTION Q Page 11 of 11 Revised 2019 supplemental SF site inspection