Loading...
HomeMy WebLinkAbout5103_JohnstonCoLF_capacity_20200108Johnston County Landfill - Comparing changes in capacity and acreages from the last approved application and permit (2017) to the current application for Phase 6 PTC and vertical expansion of Phase 4A (2019) Calculation by D. Wilson, January 2020 MSW Phases only Capacity from 2017 permit Applic for vertical expansion of 4A and reconfig of Phases 6- 10 2,396,265 Phase acre size from 2017 permit Phase acre size from 2019 applic Phase 6 1,402,016 21.1 19.7 Phase 7 1,758,991 2,841,196 19.8 23.4 Phase 8 1,844,867 3,122,359 25.2 19.8 Phase 9 6,684,914 1,558,088 22.5 23.1 Phase 10 3,137,920 4,360,867 17.5 18 Capacity of Phases 6-10 14,828,708 14,278,775 Acre size Phases 6-10 106.1 104 4A cells 1 and 2 (2017) 1,111,382 4A cell 3 (2017) 2,205,678 4A used (2019) 2,771,236 4A remaining (2019) 545,824 4A expansion (2019) 126,693 Notes on changes Capacity of 6-10 has decreased by 549,933 cy Acreage of Phases 6-10 has decreased by 2.1 acres. Capacity of Phase 4A 3,317,060 3,443,753 Capacity of 4A has increased by 126,693 cy (the expansion) Acre size Phase 4A 29.4 29.4 Phase 5 1,087,199 1,087,199 19.2 19.2 Overall change in capacity is a net decrease of 423,240 cy. Total Phases 6-10, 4A, and 5 19,232,967 18,809,727 154.7 152.6 Final height of Phase 4A is changing from 332 to 345 msl, an increase of 13 feet. IThe official approved capacity of the lined landfill units, including both MSW and C&D units, is 19,900,000 cubic yards. This consists of MSW Phases 4A and 5 through 10, and C&D Areas 1 and 2. An increase of 10% or more of this volume would be a substantial amendment.