Loading...
HomeMy WebLinkAbout5105-FlowersTP_Site_Restoration_ Plan_Request_FID1387131_20191206DocuSign Envelope ID: 763B5A6A-EE4E-4CD5-92C2-5EF30852B013 SMITH-i GARDNER ENGINEERS December 6, 2019 Ms. Sherri Stanley Permitting Branch Head Division of Waste Management NC Department of Environmental Quality 217 West Jones Street Raleigh, NC 27603 ABBRESS TEL WEB 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 www.smithgardnerinc.com RE: Site Restoration Action Plan Flowers LCIB Recycling Center (Solid Waste Permit No. 51-05) Johnston County, North Carolina Dear Sherri: On behalf of 42 East, LLC, Smith Gardner, Inc. (S+G) has prepared this request to fully restore the Flowers LCID landfill to open space within the developing community of San Marino (see Master Plan attached). In consideration of the development of the subdivision, impacts to the existing landfill will occur along the northeast and southwest sides of the site depicted in Figure 1 (attached). Based on historical operations and current investigations, it is feasible that the existing debris areas can be excavated and sorted in such a manner that only topsoil and/or concrete may remain. This plan is proposed to outline the methods and measures to be taken to assure a stable and inert open space may remain. Background As the Division may be aware, the site was originally owned by the late Mr. Billy Flowers'. At the time of purchase by Mr. Lynch, the site was under a Notice of Violation'. In order to recapture the property for future development, Mr. Lynch agreed to remediate through excavation and processing of the existing landfill under 15A NCAC 13B 0.300. Following the recession in 2008-2009, Mr. Lynch sought temporary closure of the facility3 in a manner that could be resumed in the future. Throughout the prior remedial efforts prior to 2009, no materials other than those classified as LCID were encountered. Existing Conditions In 2009, the site was confirmed with interim closure of 12" of soil and vegetated. As shown in Figure 1, the site is surrounded by a berm that centralized processing operations on the site. The berm remains around the western and southern portion of the site and is generally Correspondence dated February 10, 2004 from Mr. Ben Barnes, NCDENR to Mr. Billy R. Flowers, Flowers LCID regarding Notice of Violation issued July 18, 2003. Notice of Violation dated July 18, 2003 from Mr. Ben Barnes, NCDENR to Mr. Billy R. Flowers, Flowers LCID. Correspondence dated May 5, 2009 from Mr. Stacey Smith, P.E., S+G to Ms. Donna Wilson, NCDENR regarding Site Inspection and Interim Closure Report. DocuSign Envelope ID: 763B5A6A-EE4E-4CD5-92C2-5EF30852B013 Ms. Sherri Stanley December 6, 2019 Page 2 of 3 constructed of sorted debris materials. Within the limits of this berm, unprocessed debris remains. One (1) additional area on the eastern portion of the site also includes unprocessed debris. The eastern portion of the site was demonstrated to be clean based as previously documented in 2009 and includes a processed topsoil stockpile and a small pile of two (2) inch coarse inert and woody debris materials considered as "overs" from the prior screening process. A test pit investigation was also conducted in November within the unprocessed LCID areas and is shown on Figure 1. The test pits revealed greatest debris thickness at 12' as each investigation was terminated into natural ground. Proposed Sorting Operation The site will include complete removal (excavation) of materials that are proposed within the sub -divided home parcels. The excavation of these areas will occur into natural ground and will include the identification of woody debris such as stumps, logs, and large limbs. Once identified, these materials will be separated or loaded out and hauled to other areas of the overall subdivision development (attached) for burning, grinding, or other processing within ongoing clearing and grubbing operations. The excavated areas within the subject property, specifically shown as unprocessed LCID, will include both horizontal (by dozer) and vertical separation (by excavator). The horizontal separation will include stripping of interim closure layers followed by pushing of unprocessed landfill materials with a typical dozer mounted "root rake" allowing separation of woody debris from soil for sorting, loading, and hauling to other areas of the development. The sorting will generally include pushing debris/soil from the northwest side of the site to the southeast side of the site over top of the previous clean areas to disburse the layers for woody waste identification. Final Development Final development of the site will include a gently graded field (open area) consisting of topsoil, excess fill soils, and concrete debris that could be classified as "beneficial fill" that will be stabilized and vegetated. Documentation The site operations will include daily logs and weekly photo logs as well as rough (load counts) estimates of woody debris removed. Furthermore, any materials that are not classified as LCID will be identified, removed, and disposed at an appropriately permitted landfill facility. In the event, materials are encountered that are of potential environmental concern, sampling and analysis may be warranted and will be communicated on a case by case basis with the department for appropriate action. Once the site is restored, this documentation will be submitted to NC DEQ for review and request to remove further deed restrictions and no further action to render the site clean for unrestricted use. DocuSign Envelope ID: 763B5A6A-EE4E-4CD5-92C2-5EF30852B013 Ms. Sherri Stanley December 6, 2019 Page 3 of 3 If you have any questions or require additional information, please contact us at 919-828- 0577 or by email below. Sincerely, SMITH GARDNER, INC. t•°"�'s'eARc-,f{� +[ i 'Z/ A � ■y-, � rye M '7 :fl SCII� '%12/S/201� = s 023DU _ � r DocuSigned by: r Stacey3X'"SfiffK, P.E�®'LOI soft 15�.�•' Senior Engineer, ext. 127 staceyfdsmithgardnerinc.com sas/jas Att. CARO Q» E N SFO a° 7 SEAL 2, 1369 DocuSigned ,< LOLO Joan . g tt�;,6. A�: Senior Hydrogeologist ext. 221 0oanfdsmithgardnerinc.com CC: Mr. Gary Lynch, 42 East, LLC Ms. Donna Wilson, NCDEQ Mr. Jason Watkins, NCDEQ Ms. Terry Stephens, P.E., 42 East, LLC File \\ralnas\Archive\Projects\Clients (Inactive)\Flowers LCID Landfill\Restoration Plan\Letter 11-15-19 (Restoration ).docx DocuSign Envelope ID: 763B5A6A-EE4E-4CD5-92C2-5EF30852B013 ;. -.;.. Ix 1 y \ \ N j FO I I Sx l l / a N 127 lie '\:, \�\\ ° STb-1`V1 1 �BII9�'[� Ir1 A THE GARDENS AT Aux 29 81 PC 45174.54 FLOWERS PLANTATION 2, Sa \ %ir PRELIMINARY .z.. NOT APPROWU FOR CONSTRUCTION scue r =,w j OWNER/DEVELOPER \ \ ,x SPACE OPE,I 19P 136 !+ y5 42 East LLC PH 3 8310 Bandford Way Raleigh, INC 27615im Sip ,es MAGNOLIA SUBDIVISION p4( i 6 � RC PHASE 2 e 2)9 x71 x9x 27, x]<rlC� /A� PB 64 PG 420 ,[. ],< a17 I66 / \ ``-�Ro 61 •.es P 167 x,9 / x9s -,rp lae J OPEN 61 \ xx, 99 xs3 �g�p�y�P SPACE / \ 909 � =ee Opp 1M .s. _., s n. ,aq'I,n. ea eve u�a 5�'PL'-t •V /1 SPACE' 2x2 SPACE , 301 1 I` 27� a3x x69 x� 291 1. 95t JJ 4 \ 1 ,ea xx3 290 91 MAGNOLIA SUBDIVISION } '° 179 e� PB 67 PC 314-31 y ° „] x39 lee _ ` zas zxc x9e zas ,e9 x93 2<7 \ 9 49 x36 R96 1 299 SCM 193 a93 a3e >,6 J:' 5e7: SCM 4 SPPACAC y9 f% jI �• -. 36 .� E \ Ss xw OPEN c; 3x es t5 199 f ea / NP9.9R r 2B 50 96 / Wjtl ,E 1901 93 e9 CM 2 x< / j/ S fR� ''1 LI w "COMMUNITY 3 RECREATION • rC 2. ( ( F3 .. / �d \1\` CENTER » 6 �aw OR varaueaLv `y *� N e 4 , C I • . `_ �`4y\r\\ WY 42 EAST OPEN / SCM 3 P I _ `� - . Fxisting) 5ace . (100 Publrc R/4V - ACE (160' R/W Ultimate) Na Re+isiae Date By 1>dse 9ak ' r� San Marino D. [7wcS.ea 17 166 N° d„ xuaa>oo JOHNSTON COUNTY NORTH CAROUNA Master Site Plan ■� WithersRavenel "�` .. EnkmmIPknmm ISunreym A 115 kUd( mQM Cmy.N rMl It YIAM0,U01 kw9q #:cm991re999.wtmwilww m DocuSign Envelope ID: 763B5A6A-EE4E-4CD5-92C2-5EF30852B013 2 o_ LO N N Cn O N O N �'RAygN (r•1 11' 01111Ih 260.00 U- Z 0 W 250.00 k,HQ, 01111If, 0,011Ih r%r%^r%r'r1T\/ 1 1\Ir' � '69 r/ / I I--F I -- EMAINIMG 'WASTE AR�A`�6.� AC) ; II I II I I I I� I I II I I II I � I I I I I I I I I� II 1. OVERALL SITE BASE TOPOGRAPHY REFERENCES NCDOT GIS DEPARTMENT, BASED ON LIDAR DATA DAED MARCH 2O05. TOPOGRAPHY INSIDE OF ACTIVE AREAS FROM A FIELD SURVEY DATED APRIL 2, 2009 BY CAROLINA CRAFTSMEN. 2. PROPERTY LINE LOCATION REFERENCES FIELD SURVEY DATED MAY 8, 2006 BY BRENNAN LAND SURVEYING, P.A. 3. COORDINATE GRID SYSTEM IS STATE PLANE NAD 83. 4. STREAM AND WETLAND DATA PREPARED BY RALPH WHITEHEAD & ASSOCIATES AND RECIEVED ON SEPTEMBER 13, 2006. 5. SAN MARINO SUBDIVISION LAYOUT AND GRADING PROVIDED BY WITHERS RAVENEL. DATED MARCH 21, 2019 LEGEND 150 EXIS77NG 10' CONTOUR (SEE REFERENCE 1) — — — — — — EX/STING 2' CONTOUR 150 PROPOSED 10' CONTOUR PROPOSED 2' CONTOUR APPROXIMATE PROPERTY BOUNDARY (SEE REFERENCE 2) — — PROPOSED LOT LINE BUFFER X PIT 1 TEST PIT LOCA77ON AND NUMBER TEST PIT DATA TEST PIT NUMBER 1 2 3 4 TOTAL DEPTH 19, 14' 19, 19' TO 23' (AT THE EDGE OF A BERM) COVER 1.5' TO 4' 4' 3 5' DEBRIS THICKNESS 7' 3' 12' 11' BOTTOM DEBRIS TO BOTTOM OF PIT 10.5 7' 3' 3' SOIL TYPE CLAY WITH BLACK SOIL CLAY WITH BLACK SOIL CLAY WITH BLACK SOIL CLAY WITH BLACK SOIL SOIL CONDITION WET DRY DRY TO MOIST DRY WAS VIRGIN SOIL REACHED YES YES YES YES O I� w Z C✓ w o EXISTING DEBRIS J EXISTING GR UND SURFA E N (SEE REFERENCE 1) z J 0 �m C � o_ � � �� 1 - - - - �Q � aZ � N PROPOSED SAN MARINO GRADING PROPOSED LOT F- F- Q� 5 J GRADING ALONG RAVNAO t _APPROXIMATE GROUNDWAIER SURFACE 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 (r•1 11 (r.l 11 011111111 Q119111I11 4011111111 �Z' 11111I11 411111I11 220.00 10+50 30' 20' 10' N In 0 1 0 1 0 1 0 1 0 E !�l PREPARED BY: PREPARED BY: NC LIC. NO. F-13701ENGINEERINGI SC COA NO. CO1488 S M ITH+ GARDNER ENGINEERS 14 N. Boylan Avenue, Raleigh NC 27603 1919.828.0577 1526 Richland St., Columbia SC 29201 SEAL ,,,�puuwq�♦♦♦ C'AR ESS/Q�C�7i�,'♦�� • QQ- 9� SEAL 12/622019 023002 Docu' ned y: A. Es3369FBA008�B4EAII •%,•„91960 SEAL REV. I DATE I DESCRIPTION Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE: FLOWERS LCIO RECYCLING CENTER SITE PLAN DRAWING TITLE: DESIGNED: PROJECT NO: S.A.S. FLOWERS 19-1 DRAWN: SCALE: AS SHOWN APPROVED: DATE: OCT. 2019 FILENAME: FLOWERS-D0004 SHEET NUMBER: DRAWING NUMBER: FIG.1 © 2019 Smith Gardner, Inc.