Loading...
HomeMy WebLinkAbout19041_Davidson Depot St_SITE_PHOTOS301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 1: Eastern wall or eastern warehouse, facing south along access road for Eden Street Photograph 2: Vent pipe along eastern wall of eastern warehouse 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 3: Location of UST - beneath access road for Eden Street near the southeastern corner of the site Photograph 4: Southern portion of site 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 5: Rear of eastern warehouse. Note water supply well pump house in foreground Photograph 6: Dumpster near southwestern corner of eastern warehouse 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 7: Western warehouse and gravel-lined parking area. Note grassed area in background is location of buried asbestos containing materials Photograph 8: Location of buried asbestos containing materials 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 9: Vacant space in western warehouse Photograph 10: Floor drain in western warehouse 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 11: Typical storage space in eastern warehouse Photograph 12: Three 55-gallon oil drums located in paint recycling business’ area 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 13: Numerous containers in paint recycling business’ area Photograph 14: Spray paint storage in Peak Fitness’ area 301 Depot Street - Report of Phase I ESA December 20, 2007 MACTEC Project: 6228-07-4436 Photograph 15: Typical storage space in eastern warehouse Photograph 16: Typical storage space in eastern warehouse