HomeMy WebLinkAbout58001YWN_INSP_20191205NORTH CAROLI D_EQ��
OepnMiml of Enrlrommenlal Ounl�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
X
Transfer
Compost
SLAS
COUNTY: MADISON
MSWLF
PERMIT NO.: YWN-58-001
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: 12/5/2019
FACILITY NAME AND ADDRESS:
Riverside Stump Dump, Inc. #VII
US Highway 19, Middle Fork Straight
Mars Hill, NC 28754
Date of Last Inspection: 10/18/2016
GPS COORDINATES: Lat: 35.856622' Long:-82.487054'
FACILITY CONTACT NAME, PHONE NUMBER, & EMAIL:
Name: Clara Ray, President — Riverside Stump Dump, Inc.
Telephone: 828-25 8-7339
Email address: stumpdumpl23kyahoo.com
FACILITY CONTACT ADDRESS:
2851 US 19 Highway
Mars Hill, NC 28754
PARTICIPANTS:
Kris Riddle, Environmental Senior Specialist, Solid Waste Section (Section)
STATUS OF PERMIT:
Active. The Small Type I Facility currently operates under active Yard Waste Notification (YWN) #58-001.
PURPOSE OF SITE VISIT:
Comprehensive Site Inspection.
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. Per the YWN-58-001 Facility Renewal form submitted on 5/29/19, the facility notified the Section it would accept
land clearing debris, yard trash, and other: including stumps, whole trees, tree limbs, branches, untreated wood, leaves,
brush/shrubs, and stone and asphalt millings.
Page 1 of 3
FACILITY COMPLIANCE INSPECTION REPORT
�INAI� Division of Waste Management
��1� � a
0 partmen IEnnronmenW10pality
Solid Waste Section
2. Site access is located off US 19 Highway. The site entrance is opposite of Fox Grape Hollow Road in Madison
County, NC.
3. Site access roads were maintained during this inspection.
4. The facility operational area appeared to occupy less than 2-acres during this inspection (photo #1). Since the
previous inspection, it appeared beneficial fill material (crushed asphalt) had been placed on -site to increase the pad
depth of the operational area.
5. Post -inspection, on December 12, 2019, the Section contacted Mrs. Clara Ray, site owner/manager, to discuss facility
operations. As discussed with Mrs. Ray post -inspection, since the site has not been utilized for some time, please ensure
minimum buffer requirements are maintained for the facility. As discussed, a 50-foot buffer must be maintained
between all property lines and compost areas, and a 50-foot buffer must be maintained between perennial streams and
rivers and compost areas. To ensure maintenance of minimum buffer requirements at the site, the Section recommends
the facility install and maintain buffer stakes/markers at the site.
6. During this inspection, processed materials were observed along the northern area of the site (photo #2). The
processed materials were segregated by gabions/concrete barriers. As noted above in Additional Comment #5, please
ensure a 50-foot buffer is maintained between the site and the Ballard property (parcel north of the site).
7. As discussed post -inspection, facility personnel stated the site is currently only used for the storage of processed
materials and equipment and grinding of materials is not occurring at this time. During this inspection, some equipment
was observed at the site.
8. During this inspection, no unpermitted waste was observed on -site. Continue to maintain waste screening efforts at
the facility.
9. Continue to maintain all erosion control measures at the site as necessary. As discussed post -inspection, the Section
recommends silt fence be installed at the toe (bottom) of the fill material along the western side of the site, adjacent to
US 19 Highway.
10. All photographs taken by Kris Riddle on December 5, 2019.
1. Southwestern view of operational area and
equipment observed at the facility.
2. Northern view of processed materials observed on
the northern side of the facility.
Page 2 of 3
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
NORTH CAROLINA
Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Kris Riddle
Kris Riddle Date: 2019.12.31 10:38:40-05'00' Phone: 828-296-4705
Kris Riddle, Environmental Senior Specialist
Division of Waste Management, NC DEQ
Regional Representative
Sent to Clara Ray, on
X
Email
Hand delivery
US Mail
Certified No. fI
December 31, 2019, via:
E-Copies: Deb Aja, Western District Supervisor - Solid Waste Section
Page 3 of 3