Sarah:
Removal of the ASTs at the Cenco site were completed on Tuesday. The
containment structures and ASTs were in good condition with no
indication of spills or releases or holes, cracks, pits or any other
structural issues. A few surficial cracks were observed in the waste
water containment structure but were not deep or extensive.
The PD has requested the use of the former fuel oil AST containment
structure in order to place their existing portable dyed fuel AST into
it for storage. Rather than having the tank outside of the structure,
where vehicular traffic could be problematic. The tank would be much
more secure in the containment. Attached are several photos of the
former fuel oil AST containment structure.
Please advise and thank you.
John D. Reuscher, PG, RSM, Project Manager
Hart & Hickman, PC | 2923 South Tryon Street Suite 100 | Charlotte, NC
28203
Direct 704-887-4634 | Mobile 704-575-8415 | Main 704-586-0007
jreuscher@harthickman.com | www.harthickman.com
<http://www.harthickman.com/>