Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
6304_Harris Trucking LCID Plans 8-14-19
RUBICON RD BEULAH HILL CHURCH RD L VICINITY MAP f f ! NC 73 kWY r N 3 SITE /41# _ US 18.6tl1 HWY ' MURDOCKSVILLE RD Not to Scale I 10[-:- 011[jK oil PI CARTHAGE, NC LCID Landfill Construction Plans 15A NCAC 13B .0560 OPERATIONAL REG. FOR LAND CLEARING/INERT DEBRIS (LCID) LANDFILLS LAND CLEARING AND INERT DEBRISJLCID) LANDFILLS SHALL MEET THE FOLLOWING OPERATIONAL. REQUIREMENTS: (1) OPERATIONAL PLANS SHALL BE APPROVED AND FOLLOWED AS SPECIFIED FOR THE FACILITY. (2) THE FACILITY SHALL ONLY ACCEPT THOSE SOLID WASTES WHICH IT IS PERMITTED TO RECEIVE. (3) SOLID WASTE SHALL BE RESTRICTED TO THE SMALLEST AREA FEASIBLE AND COMPACTED AS DENSELY AS PRACTICAL INTO CELLS. (4) ADEQUATE SOIL COVER SHALL BE APPLIED MONTHLY, OR WHEN THE ACTIVE AREA REACHES ONE ACRE IN SIZE, WHICHEVER OCCURS FIRST. (5) 120 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF DISPOSAL OPERATIONS, OR UPON REVOCATION OF A PERMIT, THE DISPOSAL AREA SHALL BE COVERED WITH A MINIMUM OF ONE FOOT OF SUITABLE SOIL COVER SLOPED TO ALLOW SURFACE WATER RUNOFF IN A CONTROLLED MANNER. THE DIVISION MAY REQUIRE FURTHER ACTION IN ORDER TO CORRECT ANY CONDITION WHICH IS OR MAY BECOME INJURIOUS TO THE PUBLIC HEALTH, OR A NUISANCE TO THE COMMUNITY. (6) ADEQUATE EROSION CONTROL MEASURES, STRUCTURES, OR DEVICES SHALL BE UTILIZED TO PREVENT SILT FROM LEAVING THE SITE AND TO PREVENT EXCESSIVE ON SITE EROSION. (7) PROVISIONS FOR A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED WITHIN 30 WORKING DAYS OR 120 CALENDAR DAYS UPON COMPLETION OF ANY PHASE OF LANDFILL DEVELOPMENT. (8) THE FACILITY SHALL BE ADEQUATELY SECURED BY MEANS OF GATES, CHAINS, BERMS, FENCES, ETC. TO PREVENT UNAUTHORIZED ACCESS EXCEPT WHEN AN OPERATOR IS ON DUTY. AN ATTENDANT SHALL BE ON DUTY AT ALL TIMES WHILE THE LANDFILL IS OPEN FOR PUBLIC USE TO ASSURE COMPLIANCE WITH OPERATIONAL REQUIREMENTS AND TO PREVENT ACCEPTANCE OF UNAUTHORIZED WASTES. (9) ACCESS ROADS SHALL BE OF ALL-WEATHER CONSTRUCTION AND PROPERLY MAINTAINED. (10) SURFACE WATER SHALL BE DIVERTED FROM THE WORKING FACE AND SHALL NOT BE IMPOUNDED OVER WASTE. (11) SOLID WASTE SHALL NOT BE DISPOSED OF IN WATER. (12) OPEN BURNING OF SOLID WASTE IS PROHIBITED. (13) THE CONCENTRATION OF EXPLOSIVE GASES GENERATED BY THE FACILITY SHALL NOT EXCEED: (A) TWENTY-FIVE PERCENT OF THE LOWER EXPLOSIVE LIMIT FOR THE GASES IN FACILITY STRUCTURES. (B) THE LOWER EXPLOSIVE LIMIT FOR THE GASES AT THE PROPERTY BOUNDARY. (14) LEACHATE SHALL BE PROPERLY MANAGED ON SITE THROUGH THE USE OF CURRENT BEST MANAGEMENT PRACTICES. (15) SHOULD THE DIVISION DEEM IT NECESSARY, GROUND WATER OR SURFACE WATER MONITORING, OR BOTH, MAY BE REQUIRED AS PROVIDED FOR UNDER RULES .0601 AND .0602 OF THIS SUBCHAPTER. (16) A SIGN SHALL BE POSTED AT THE FACILITY ENTRANCE SHOWING THE CONTACT NAME AND NUMBER IN CASE OF AN EMERGENCY AND THE PERMIT NUMBER. THE PERMIT NUMBER REQUIREMENT IS NOT APPLICABLE FOR FACILITIES NOT REQUIRING AN INDIVIDUAL PERMIT. SHEET INDEX SHEET TITLE C00 COVER C01 EXISTING CONDITIONS CO2 PHASE 1 GRADING PLAN CO3 FINAL GRADING PLAN C04 EROSION CONTROL PLAN C05 CROSS SECTION Al C06 CROSS SECTION A2 C07 CROSS SECTION B1 C08 CROSS SECTION B2 C09 DETAIL SHEET Know whore below. Call 811 I'iAm you dig. PLAN & PROFILE PLAN & PROFILE PLAN & PROFILE PLAN & PROFILE IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO SITE EXCAVATION, GRADING, OR DIGGING TO HAVE THE EXISTING UTILITIES LOCATED. .JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 1`4 Engineering-Surveyi ng-Planning 180 Parry Drive 3outharn Fines, NC 28367 Phone. (910) 240.0036 NC License # C-3701 ,Nvsfw.snsen ineers c o m r• r 36249 RELEASED for CONSTRUCTION , 18115 1AWN BY MS ;AI I : Nay 8-14-19 Hk;i=T PdUMl= COO Legend: @o = Iron Pipe Found O = Iron Rod Found 0 = Concrete Monument Found © = PK Nail Found A = PK Nail Set = Existing Right of Way — - - -- - — = Proposed Right of Way = Boundary Line — --- — s Adjacent Property Lines not Surveyed Existing Setback Lines Proposed Setback Lines = Existing Contour roo = Proposed Contour __- w - = = Approximate Location of Existing Waterline OWL = Proposed 6" Waterline = Approximate Location of Existing Gas line -- S5= = Existing Sanitary Sewer Line M = Proposed 8" Sanitary Sewer Line - — — — — -- — - = Existing Easement - — — — — — — -- = Proposed Easement -- 00i = Existing Overhead Utility - Existing Underground Utility = Existing Wetland Limits A •- x x - Existing Fence X—X—X— = Proposed Fence 4sg - Proposed 4" Sewer Service Proposed 2" Water Service .........2WL ..,..... - Limits of Disturbance --- - Proposed Silt Fence 7D>— - Proposed Temporary Diversion • • • • • • • = Existing Stream Centerline - _ _ - - - = Existing Soil Road - - - - - _ - - Existing Gravel Road r; - Existing Light Pole = Existing Utility Pole = Proposed Light Pole Nk - Proposed Utility Pale X = Existing Water Meter 9--- = Proposed Water Meter M - Existing Water Valve N - Proposed Water valve N - Fxisting Fire Hydrant jb. = Proposed Fire Hydrant OD - Existing Sanitary Sewer Manhole = Proposed Sanitary Sewer Manhole - Existing Sewer Clean out - Proposed Sewer Clean out - Curb Inlet - Existing Storm Drain Manhole HDPE' - High Density Polyethylene Pipe MCP - Reinforced Concrete Pipe - Flared End Section = 10" Pine (typ.) X - Existing Tree to be Removed I ' "JOHNNY HARRIS TRUCKING, INC." ' 4 1 "JOHNNY HARRIS TRUCKING, INC." 1 I .-----_..----..a--------- --— ----._._- ----- -------�—���� _----�—�T _—� �--_...-------_--.�..----_--_---.._..---T-� _-�_ —__ - —_,--- - f,�,f, —N45'39'20"E -Jigl - :,:W A, N40'J10-z0-L „ 468.03' 849.34 Progress Energy Transmission Line (155' R/W) i, _ VqU-- -— r iau --= -- iJilu - - r I! - U' -_ ---- _ - - t7rYt/ -- _=— — -- [rh'L! - - ---- Allu t b,� i k \ 104 'N fe BORE HOLE_ 42 I f j 6s� 4 r r i s i Progress Energy Transmission Line J $ (155- R/W) i M- 55, rri1- r 1 __711V - _ 1 II z,� I � I I I BORE HOLE 41 ti l Fxi®ling Bore B6RE HOLE 43 Hole Location 1 \ NO - ---- 4 y- - t `15.17 ACRES "JOHNNY HARRIS TRUCKING INC." TRUCKING., Existing ;oil Acur5n Rood * 1 I ` ',,, 4 ` 10000 .0000 � '48 4. 1 � g2T 15 a f References: Plat Cabinet 17, Slide 723 Deed Book 3117, Page 413 Deed Book 3117, Page 416 Deed Book 3117, Page 419 Moore County Registry Owner/Developer: Johnny Harris Trucking, Inc Chad Harris 4291 Dowd Road Carthage, NC 28327 (910) 947-5011 0 60' 120' Scale: 1 "=60' "ALBERT DAVID WOODS II" DB 2005E PG 164 DB 1327 PG 355 Kmw whare below. Call 811 before you dig. GENERAL NOTES: 1. This map Is not In accordance with GS 47-30. 2. Area by coordinate method. 3. Dashed lines not surveyed, drawn from Informatlon as Indicated. 4, Contour Interval 1' based on NAVD 'BB Vertical Datum. 5, All distances are horizontal ground distance, 6. Thls property Is in a WS-Ilt water supply watershed. 7. There are no visible encroachments other than those shown hereon, 8. Property does not Ile In a designated FEMA Special Flood Hazard Area, 9i Property Is currently zoned: RA -CUD per Moore County. 10, Total area of tract; 15,71 Acres (8.03 Acres LCID Waste Footprint) 11, Topographical survey prepared by SNS Engineering, Inc, 12, Location of underground utllltles, if shown, are based on vislblo evidence or drawings provided to the surveyor. Locatlon of underground utllltles and structures may vary from shown locations. Additional utilities may exist, Local utility companies should be consulted for further Information on utilities affecting the property. 13. This survey was done without the benefit of an attorney's title search which could dlsclose zoning, restrictive covenants, easements not visible to the surveyor, building setbacks, or other Information which could affect the surveyed property, CLIENT: JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 Z 0 Q Z p U Z e� X UJ 0011 in W Ew S N S Engineering -Surveying. -Planning 1do Perry Orivo Southern Pines, NC 26367 Phone: (910)246.0030 NC Licanse # C•3791 CA,gO�/,�'r, '4 r: 36249 S,ygNE i 5IP��,,,� RELEASED for CONSTRUCTION ROJECI NOMBEW 18115 fat$. INN BY.. — eta 0AM 8-14-19 SHEET PYUEv OER C01 Legend: = Iron Pipe Found O = Iron Rod Found - Concrete Monument Found = PK Nail Found d = PK Nail Set = Existing Right of Way _ Proposed Right of Way = Boundary Line --- — -- — = Adjacent Property Lines not Surveyed - - - - = Existing Setback Lines - - - - - -- - = Proposed Setback Lines Existing Contour 100 = Proposed Contour w - = Approximate Location of Existing Waterline Owl. Proposed 6" Waterline = Approximate Location of Existing Gas line - - = Existing Sanitary Sewer Line ess Proposed 8" Sanitary Sewer Line - - --- - --- - -- = Existing Easement -• - -- •- -- - - - = Proposed Easement = Existing Overhead Utility = Existing Underground Utility Existing Wetland Limits \ Existing Fence ---X X X Proposed Fence 1 4ss----- = Proposed 4" Sewer Service 2wL Proposed 2" Water Service Limits of Disturbance sr = Proposed Silt Fence "JOHNNY HARRIS TRUCKING, INC." M> = Proposed Temporary Diversion • • 9 • • • • • • • Existing Stream Centerline 1 - - - - - - - = Existing Soil Road Existing Gravel Road "JOHNNY HARRIS TRUCKING, INC." = Existing Light Pale _ s Existing Utility Pole = Proposed Light Pole = Proposed Utility Pole ® = Existing Water Meter j Proposed Water Meter 1XI - N Existing Water Valve __�-------------�---�---�..-----.--_.---------- Proposed Water Valve --------- ®----.-_ _ �..__,._.--..._..- -..� -_- -- --------.m �.��..-�.._. --._-- o.,---------..,..--.-r..----,-..._--Y..-..._._.m.,___.--..-..._.. Existing Fire Hydrant _ Proposed Fire Hydrant ® = = Existing Sanitary Sewer Manhole Proposed Sanitary Sewer Manhole N45.39'20"E N45`39'20"E = Existing Sewer Clean out = Proposed Sewer Clean out 4813.03' CI = Curb Inlet =Existing Storm Drain Manhole Progress Energy Transmission Line HDPE = High Density Polyethylene Pipe (155' R/W) RCP = Reinforced Concrete Pipe FES - Flared End Section 1 "-• ' = 10�� Pine YPt•) � X = Existing Tree to be Removed r !` i+ yyI - 1 SECTION (Al) ) m849.34' .__--fir•—�__--��-------•fir•- IN All Existing Bore Hole Location (TYP•) 10 ,S r y �p0 ZL "JOHNNY HARRIS TRUCKING-, INC." — _ - y �� 2+;� ExistingF moil Acccns Road f SECTION 3 I_----.- Sir- .�._-.C', (A2) — f 1- t 1 ft1 �� - •'``5Y 1 1 � Progress Energy Transmission Line 0 (155' R/W) - - _ -- '¢4�y __ ;I:.. .--._ .. ;isfrl _ _.: }III '- tIR• _ . =- -- _ONO I— — — — — — —._. — 1 I } Td 4 I_ 1 0 3a,' 5 cf ' Z 0 r � 15.17 ACR!S 2i � y 53 _ � 1 ------ y � � 4 � l y � i 5 l 14 0 so' 120' Scale: 1 "-80' 4.tyu 1 4•�5 "ALBERT DAVID WOODS II" DB 2005E PG 164 DB 1327 PG 355 go V h_t } 1 l; 5� aye NARRATIVE: Al� / 41 Know what's WOW. CON 811 beftm you dig. Project Description: This proposed LCID landfill site is a smaller portion of an overall larger mine site that has been used for the excavation and mining of sand for years. This area Is now at a point where no further mining is proposed. The current use is comprised of (2) separate LCID sites located on adjacent properties. The (2) existing LCID sites total less than 2 acres each. The two individual properties will be recombined into one tract with a total acreage of 15.17 Acres and this permit application Is for one larger combined LCID site which will encompass both original smaller LCID sites while providing additional area and volume for LCID Landfill operations. This project will be constructed in Three Phases. PHASE 1 will consist of final excavation/grading and fill of the site to maintain 4 feet of seperation from the seasonal high water table. PHASE 2 will consist of LCID landfill operations from the Phase 1 elevation datum and to an elevation of 465.50' which will be a gross capacity of 100,000 Cubic Yards (CY) for all of Phase 2. This capacity is the projected 5 year capacity, and was based on the current LCID operations producing roughly 20,000 CY per year. PHASE 3 will be the final Phase and Is projected to have a capacity of 83,000 CY at an elevation of 475.50'. Existing Site Conditions: The existing site Is currently (1) active LCID landfill and (1) closed LCID landfill on adjacent properties with existing erosion control plans approved. Adjacent Areas: The property adjoins residential zoned property to the East and South; and residential conditional use to the North and West. Erosion and Sediment Control Pleasures: Erosion and sediment are to be controlled by using the designed measures as shown on the plans and details. CLIENT: JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 ,il E fl i i f, i 1 E i I I i E E i i" =� ,. ,J I i E Engineering -Surveying -Planning ! eo Perry [!rive Southern Pines, NC 26387 Phone: (910) 246.0038 NC Licons # C•3791 r r -•.,NG[I'INE�;N��?,' 'fill it RELEASED for CONSTRUCTION 1.;. , ; "A,.,I klk, k; 18115 NA*0+1N Ry MSS scA'.i-: .i„ - 6011 OA 'ILE. 8-14-19 k?;FtrEEY NUMBER. cot Legend: CLIENT: Do = Iron Pipe Found O = Iron Rod Found 11 - Concrete Monument Found A = PK Nail Found A = PK Nail Set = Existing Right of Way -- -- - - — = Proposed Right of Way = Boundary Line -- --- -- Adjacent Property Lines not Surveyed Existing Setback Lines - - - - -- -• = Proposed Setback Lines Existing Contour IGIQ— = Proposed Contour -- - w = Approximate Location of Existing Waterline -- OWL = Proposed 6" Waterline = Approximate Location of Existing Gas line = Existing Sanitary Sewer Line �s = Proposed S" Sanitary Sewer Line - - - - -- - - - = Existing Easement - - - - - -• - - = Proposed Easement - 6)u = Existing Overhead Utility _-_=--=141)------- = Existing Underground utility - --_== —WV-- = Existing Wetland Limits - - x — x — x — = Existing Fence —X—X----x = Proposed Fence 4Ss y--r-• = Proposed 4" Sewer Service 2WL — = Proposed 2" Water Service e.•.•.... •.•..•..••e = Limits of Disturbance SF - Proposed Silt Fence TD > = Proposed Temporary Diversion . • .. ... = Existing Stream Centerline - - _ - - - = Existing Soil Road = Existing Gravel Road = Existing Light Pole = Existing Utility Pole = Proposed Light Pole lk = Proposed Utility Pole 0 = Existing Water Meter 8-- = Proposed Water Meter Dd = Existing Water Valve "JOHNNY HARRIS TRUCKING, INC." ►+ = Proposed Water Valve = Existing Fire Hydrant 06 = Proposed Fire Hydrant C1 = Existing Sanitary Sewer Manhole = Proposed Sanitary Sewer Manhole = Existing Sewer Clean out Qe = Proposed Sewer Clean out t„ C/ = Curb Inlet "b" = Existing Storm Drain Manhole HDAF = High Density Polyethylene Pipe 1 RCP = Reinforced Concrete Pipe = Flared End Section = 10" Pine (typ.) X = Existing Tree to be Removed "JOHNNY HARRIS T-RUCKIN( - EX '"JOHNNY HARRIS TRUCKING, INC." -------------------------------- --------- ------- a 60' 1 ;0- Scale: 1 "-6a' AVID WOODS II" 05E PG 164 S27 PG 355 "o Know whatt below. Ca11811 balm you dig. JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 l lIII LLWI Engineering -Surveying -Planning 180 Perry Drive Southern Pinse; NC 20387 Phone; (910) 246.0038 NC License 0 C-3791 ``,„Illlllfflll! W CAAo°', r ;36'249 IfI•rt'j - 1177 i,llll,lll,,! RELEASED for CONSTRUCTION rare dr.ti-; N00AMk.. 1 311 t: PRAWN SY' SS 0A � 8-14-19 �HFEI UMBFIR. CO3 Legend: ® = Iron Pipe Found Q = Iron Rod Found 0 = Concrete Monument Found = PK Nail Found = PK Nall Set - Existing Right of Way -- - - - - --- - Proposed Right of Way = Boundary Line — --- — --- = Adjacent Property Lines not Surveyed Existing Setback Lines proposed Setback Lines Existing Contour f01d = Proposed Contour w- _ . Approximate Location of Existing Waterline 6WL = Proposed 6" Waterline = = Approximate Location of Existing Gas line ss--------- = Existing Sanitary Sewer Line a n = Proposed 8" Sanitary Sewer Line a — — — — _ ® = Existing Easement - — — — — — — - = Proposed Easement = Existing Overhead Utility u10 — = Existing Underground Utility Existing Wetland Limits \ ' Existing Fence x----%--- X— = Proposed Fence 1 4Ss .�._._w,__ _. = Proposed 4" Sewer Service 2WL — - = Proposed 2" Water Service 4 • Limits of Disturbance I ' SF = Proposed Silt Fence l "JOHNNY HARRIS TRUCKING, INC." " .. no > . r Proposed Temporary Diversion = Existing Stream Centerline = Existing Soil Road — - - = Existing Gravel road "JOHNNY HARRIS TRUCKING, INC." = Existing Light Pole ' = Existing Utility Pale = Proposed Light Pole = Proposed Utility Pole = Existing Water Meter Proposed Water Meter �a = Existing Water Valve D'w 60'L TEMPORARY SKIMMER BASIN #2 N = Proposed Water Valve ,��..en..��.--}--�— ��_-----��—_---_-------= _--------W—m®��-��_ �� � � � �� __ � — —� �—� _—�------------- - ------ 3 x6 x p. elr Drainage Area: 1,91 Acres = Existing Fire Hydrant Disturbed Area: 1.45 Acres ' 0. -Proposed Fire Hydrant 1 Surface Area Required: 1,712 SF = Existing Sanitary Sewer Manhole Surface Area Provided: 1,800 SF • - p Sanitary Existing Sewer Glean out vtiv - N45'39'20"E N45'39' Proposed 5anita Sewer Manhole 20 E ,, . - - �- = Proposed Sewer Clean out ci = Curb Inlet = Existing Storm Drain Manhole HDFE = High Density Polyethylene Pipe RCP = Reinforced Concrete Pipe ire$ = Flared End Section = 10" Pine (typ.) x = Existing Tree to be Removed 468.03' I ao Progress Energy Transmission Line (155' R/W) TEMPORARY SKIMMER BASIN ##7 24'Wx48'Lx2'Dp, 6' Wolr Drainage Area: 1.15 Acres Disturbed Area: 1,06 Acres Surface Area Required: 1,031 SF Surface Area Provided: 1,152 SF �40� "JOHNNY HARRIS TRUCKING, INC." _ Existing Soil Accrr» Rood TEMPORARY SKIMMER BASIN #1 26'Wx52'Lx2'Dp. 6' Weir Drainage Area: 1.37 Acres Disturbed Area: 1.20 Acres Surface Area Requlred: 1,228 SF Surface Area Provided: 1,352 SF DISSIPATOR PAD See Detail (Typ.) 849'� OL �-TD>_TD>� yD> L. Slope Drain #1 DA:0.73 Acre 77TI—MTD >9, Slope Drair #7 - a See Detail (Typ.) DA:0.87 Acre ntOA,.,rc, - 0,13 Awe ® V i 1 ii 0 KI A00,, Slope Drain #5 DA:0.63 Acre Slope Drain #6 DA:0.62 Acre TEMPORARY SKIMMER BASIN #6 26'Wx52'Lx2'Dp, 6' Weir Drainage Area: 1.29 Acres Disturbed Area: 0.63 Acres Surface Area Required: 1,156 SF Surface Area Provided: 1,352 SF Ld' ". r (15.17 ACRES n r r Ac ri, C OL �Slope Drain #4 ( Z-0 DA:0.77 Acre'/ L _c� �y C7� c M m> TD> 1. Slope Drain #2 DA:0.70 Acre 40 TEMPORARY SKIMMER BASIN #5 20'Wx40'Lx2'Dp, 6"Weir Drainage Area, 0.88 Acres Disturbed Area: 0.71 Acres Surface Area Required: 789 SF Surface Area Provided: 800 SF TEMPORARY SKIMMER BASIN #4 30'Wx60'Lx2'Dp. 6' Welr Drainage Area: 2.00 Acres Disturbed Area: 1.32 Acres Surface Area Required: 1,793 SF Surface Area Provided: 1.800 SF Progress Energy Transmission Line (155' R/W) iTD> TD> V+ ,),m Arid Slope Drain #3_/ DA:0.36 Acre .01 F • cJ�G` VG 659 �� pC v- a "ALBERT DAVID WOODS II" DB 2005E PG 164 DB 1327 PG 355 TEMPORARY SKIMMER BASIN #3 30'Wx60'Lx2'Dp. 6' Welr Drainage Area: 1.89 Acres Disturbed Area: 0.89 Acres Surface Area Required: 1,694 SF Surface Area Provided: 1,800 SF 0 80' 120' Scale: 1 "-60' M III wmh below. Call M1 bMore you dip. SLOPE DRAIN NOTES: 1. Slope drains to be installed at close out of LCID landfill. 2. Slope drains can be removed once LCID landfill Is stabilized. CLIENT. JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 z WAft d J J o o z a_ z V♦ p _ W rn i !III II I'I� L 0 iI I i I I I G ' R Engineering -Surveying -Planning 100 perry unv* Southern fliille6, NO 28387 Pho"e. (910) 246-0038 NC LIten%e # D-3701 w w w, s n s e n g i ri e e ram. Gco m M CA R0 r �36'249 Sy�N� SPc'',< ''++111111$1t!1�� RELEASED for CONSTRUCTION PR0,1x,C'T NUMElt-R.. 181 1i 5 E3RdaWN BY mss SCALE' r 4$ r ATF 8.14-19 15HEET NUNISER C04 W39'20" E 840.34' d :: GENERAL NOTES: Seasonal High Water Information provided by: Mitchell Environmental, PA 1501 Lakestone Village Lane Suite 205 Fuquay-Varina, NC 27526 PROFILE VIEW 480'1 0 40' 80, HOR: 1 "=4Q' VER: 1 "=4' 1 FOOT ------- FINAL C(}VE— -- - ----- --------------....__....r._...._..._..r.......-..-------------------..._.---------------- I --- -- —--------------.....—..._—....-------------1 PHASE 3 - 183,000 CuYd Eiev = 475.50' 1.11� r� 475 Elev: 475,50' � 1 // Il / 1 / 1 470' / FINAL GRADE FINAL GRADE 11 470' 1 1 / 1 465' "AREA TO BE FILLED" 1 y�\ I�.A.II wnwrl ww ,�. � �. .� � � �.�. � � �.. 1....■ L.. � ...�. r� �.. .r�r 1�. .-.... .._.. �. r. .� �— � �.�. �.. .� � � �. r. ...�.. ...� �. .� .� � � ...� .� �. � � Irr ...... ...... � � ....... .� .� ...... PHASE 2 - 100,00 CuYd 460' �,�,` 1 Elev:465.0' 460' PHASE 1 (FINISH GRADE) 11 EIev = 457,90' 1 455' RA ~ `ram _ ,,•�'~� �� ��, — — — ►ram". � 1 i ..,�� PHASE 1 — EARTH FILL r-rr ` `• 1 / BASED ON SHWT ELEVATION SEASONAL HIGH WATER � _~ �� _�+ PHASE 1 TABLE _.�� CUT VOLUME AREA (TYF•) EXISTING GROUND 1 445 " [€+ ui c, Sri " rri 47 efd I rri F,r�j! ua jji ui I k it` n4 I ) r -r, till txt I� il) t{7. �' , . tfJ ti Lo 1+ I ti LF'i I� t1`7 W) 1i"} �r I •t a 'rf tl # I C7 C� u- U' # C� i7 C'? F• C� ' I LI `tr lures (; i �} i� � � ur c� ; � � � is � I} is fir , � c a} � •urn i �} c� � � i ur � :n c� ►� � • I �,. � I} � . � I} c i r [!} IaJ: In Ls l , f/1 La J ` Ln r f!) V} r r/1 i f. &x 4 u_ � 4 r � r LL i LL � � I ... to l j r � ' r �1 r U. � (� r LL 7 t..! r �— LL r LL i _., r LL U. 7 r LL LL(. �. LL_ ti LL ]� r t,3 LL 1 I LI. �.: r I C 1 r 7 ! 'a r r U. f LL LL ',i LL 2 _ E _ = W Z i 2 i U0; (n = (n I, V) ,,� :! vi r✓5 Uj = (n r.� ta. ; i � [fi UJ rn 2 t;.}1 a ia. 1a 0. a iiL Ea. ?a ;a 0+00 0+50 1 +00 1 +50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 CLIENT: JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 2837 7 r a W Z J o- LL -o V W . W a COX." cin ad Z �a of a x 0 P U O Uj IU W III III' I�IiI I. it I FI j Lj ' = I N N G, Engineering-Surveying-Plann i ng 100 Perry Drive Southern Dines'`, NC 20387 Phonei (010) 246-0038 NC Liconse # C-3791 www,snsengineers.com 1111„1111111,111, /11 ;•••p��H�R0(i'' 6'249 ":�s • �. NGINE "�`'�Sy�NE SPNC�c• tt,111114 {111141 RELEASED for CONSTRUCTION IPROJCT INWA! rtW 18115 BRAWN BY, HISS ISCALE V= 40' A�IL8-14-19 SHEET NUMBER C05 GENERAL NOTES: Seasonal High Water Information provided by; Mitchell Environmental, PA 1501 Lakestone Village Lane Suite 205 Fuquay-Varina, NC 27526 480' 475' 4709 465' 4609 4559 450' 445' 4409 CtL��y N PLAN VIEW PROFILE VIEW 0 40' BO' HOR: 1 "-40' 480 P VER: 1 "-4' 1 FOOT ......_. —_.--FINAL COVE— — ._._.---------------—.^--."------------------ ,_.._ Elev = 475.50' .,�„ ,,,.,. — „_ ,� ,�, .� ,� — — — — — — PHASE 3-183,000 CuYd Elev: 475.50' i FINAL GRADE \ \ \ "AREA TO BE FILLED" PHASE 2 - 100,00 CuYd Elev: 465.50' 460' _ i PHASE 1 (FINISH GRADE)) /,�/—..��--- 1 Elev = 452.38' 1 1 � -~� `• ell Elev = 451.43' EXISTING GROUND SEASONAL HIGH WATER ~~` �� mft---M� TABLE REQUIRED EARTH FILL. BASED ON SHWT ELEVATION (TYP.) 440 4Yi s}5 I G i ill i i!a ( S N tl ' �} i ry5 L4 i rn s•- b() �-' C G� Ci a f_3 If? 07 ` ' t'.i t.� IL7 S�`j Fb- Pw. h� g� l..SJ 4Cd t''"� !f1 + !!? hd fV �p Lq r' P] 4 r --• I � � I � � d' I � � � lL'7 u- f75 � � � 47 6 r- � � � w� � r i75 P I � f � r i h � Q7 �` id', i � � � _ Ig ��� �. 'w$ qYr uj fiT ICl +34 11'7 �7; rlS cif 1Cf �] {til 4�, 1t! ap Cy >n +fl i u} C", u'? r- 4Ci 6�i 4Cl (0 h frl h u5 h lC7 h r, h u;� h e',� h ,�} � u,� lh� 3l (a 31} {►� LL ( v v d v j iu-L�L. `t w C7 C7 ? (9 t t7 t CJ LL C"S LL �jeir wllrLL ALL.t.LL ?�ri�Lt�.�L�L�lr.l�l. T(� rI�L IC r• 1=- CJ�I�i rLL �G .: U. t''rLL G7rLL ALL 1`C�rLL r c�� f�,j Ui V) Uj (A [;'i ko �iI ill la.; Vf1 � V7 i� W � � ,.,Ii � lx ;ice l/5 l�.l`� rJ5 U.l Vj le-i i 0+50 1 +00 1 +50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 CLIENT: JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 W Room Z J aU Imm -o V� C W �a o� �a x E c) O U LU LU LU 'III i i �I i i I% N' G I N E E R I N Engineering -Surveying -Planning 100 Perry Drive Southern Pines; NC 26387 Phone; (910) 2464038 NC License # C•3791 rrr,l„r V l l l l r r 1, 111 j8249L " ": ' %,fir•" c�NGINE� • NE SP k%%%0`, r��,rrnul,rrN RELEASED for CONSTRUCTION � �; i�-! i'r• s ;� : 8-14-19 C06 CLIENT: JOHNNY HARRIS TRUCKING, INC. GENERAL NOTES: Seasonal High Water information provided by, Mitchell Environmental, PA 1501 Lakeston® Village Lane Suite 205 Fuquay-Varins, NC 27526 1i� 475'1 hiev y 470' 465' 1 i J 1 PLAN VIEW 1 y + 1 1 + ,,}0 1 1 1 � I 2 r N y i I y i ; I t + 2 bD y y ! r 1 y 1 t + fjj I 1+% 1 PROFILE VIEW 1 FOOT FINAL COVER-----------r.--.r—.�_.-------.--._..--._—�.._------------- — 1 PHASE 3 - 183,000 CuYd Elev: 475.50' 1 FINAL GRADE 1 11 AREA TO BE FILLED" 470 •—__----•-- I 460' i / EXISTING GROUND 455' T1iTii,�T�j��r Elev = 455,04' _ �CUTOLUME AREA (Typ.) 450~' � ----- REQUIRED EARTH FILL ~~` BASED ON SHWT ELEVATION (TYP.) SEASONAL HIGH WATER TABLE 445' PHASE 2 - 100,00 CuYd Elev: 465.50' 1 1460p - c-1 i+"± N t" 1 31 r �7- !(� ,- 'd' ,�.. 7 r C7 M'Si CJ w, r 4Y Jr. I rTi }i j i lfa7 j Ch i l!j r; rrjE Sri + to '�,p� ,' ui e3 Sri Sri oei Sri �=I�� ►ri I,tid Sri �Ci ui s r '. u� (+� lf7i IIj �` ��~> ti ►• ti € ti r�1 f�I ti C'] w �LL � � ,0 �r�v r �v �t( �r � � � o V ALL I ►� C7 4 0 � 0 ui U C'� ! LV U � LJ lL 0 cn u 6:. T_ 'r• LL_ l �1. r;, U. bill LL. r U_ c _ LL r LLB !:� r LL. r LL_ i 4h r LL_ r a(n OF �P ! U) LJI :a. !1 V7 !�J� d. Ili Lj Vr !-''I d it Gi d L ! I i 0+00 0+50 1 +00 1 +50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 450' 0 40' 80' HOR; 1 "-40' VER; 1 "=4' 4291 Dowd Road Carthage, NC 28327 W Z J 0 LL �0 U) e�m Z �a >" J �a 0 n e� Uj 0y... t� it III II III, ill � i ill �i 11 II � " s N 1 N E E R I N G Engineering -Surveying -Planning 180 ferry Drive ,�outharn PUea+ N0 28381 Phone: (910)246.0038 NC Licarm # 0.3791 ,,1h�„ll11111,1 j1 / 46249 ,,`INE ! P 0'�,, 1J 1711111111141�� RELEASED for CONSTRUCTION SCA(F: 140— 400 DAI 8-14-19 SHEET NUMBER col CLIENT: JOHNNY HARRIS TRUCKING, INC. CtT��I�T�%1�►C•S�� Seasonal High Water Information provided by; Mitchell Environmental, PA 1501 Lakestone Village Lane Suite 205 Fuquay-Varine, NC 27526 475' 1 470'1 465'1 In e� 455'1 450'1 445'1 PLAN VIEW PROFILE VIEW 1 FOOT FINAL COVER Elev = 475.50' _ PHASE 3 - 183,000 CuYd / 1 Elev: 475.50' 1 1 1 1 / 11 r 11 / FINAL GRADE 1 / 1 / FINAL GRADE1 / AREA TO BE FILLED" 1 / 1 1 � � 1 / 1 / 00, �� PHASE 2-100,00 CUYd Elev: 465.50' EXISTING GROUND / PHASE 1 (FINISH GRADE) 1 ---_--1. Elev = 4.50.59' 2 UT VOLUME AREA (Typ•) IMMOOMMEM REQUIRED EARTH FILL BASED ON SHWT ELEVATION SiASONAL HIGH WATER TABLE b. ` fi NOvs sFa ' vi tri (o: aLAI r G Z1. ) VT u- r E a. a 10. � a 0+00 0+50 1 +00 1 +50 2+00 2+50 3+00 3+50 4+00 470' 460' 450' Q 2' so, 4291 Dowd Rued Carthage, NC 28327 a CV M W W Z J V o� s 0 •r W CL 06 z p 0 0 � Sd! Idi C� rtn lii � ilia i l III; i II i it �I�II i II z L 5 N 5 Engineering -Surveying -Planning 100 Ferry Dtlxo 5authern Pines, NC 20R7 Phone: (910) 246.003E NO License # C-3791 www.snse n gineers.coro r� rrr 7 ,•� '4/0 IN �^ �•,• re, �I{lI1 I11111,j1 RELEASED for CONSTRUCTION WROIJE T NUMBM, 18115 SCALE: 0AI'll: 11-14.19 ShiIE12T NUM13FR C08 sagdouhng spec'U'UnUMS Permanent 5-eeding-_ 80 lb/acre common hulled bermuda (mar 1-- Nov. 1) 80 lb/acre common unhulled bermuda (Nov. 1 — mar 1) 4000 lb/acre limestone 1000 Nacre 10-10-10 fertilizer 500 lb acre 0-20-0 super phosphate 4000 lb/acre straw mulch Anchor straw by tacking with asphalt Temporary Seeding 40 lb/acre german millet (may 1—Aug. 15) 120 lb/acre rye (grain) (Aug. 15—Dec, 30) 50 lb/acre kobe lespedeza (Jan. 1—may 1) 2000 lb/acre limestone 1000 lb/acre 10-10-10 fertilizer Seeding Preparation Rip the area to be seeded 4-6 inches minimum. Remove oil loose roots, rocks, etc. Leaving surface smooth and uniform. Work lime and fertilizer Into the soil. Water A minimum of 1 inch of rainfall a week (if not supplied naturally, contractor shall supply the remaining amount until ground has been established). Maintenance In well maintained areas, refertilize In the second year unless growth is fully adequate. mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Wound SM on b7,-4Sg0(an a) Soil stabilization shall be achieved on any area of a site where land —disturbing activities have temporarily or permanently ceased according to the following schedule: i) Ail perimeter dikes, swales, ditches, perimeter slopes and all slopes steeper than 3 horizontal to 1 vertical (3: 1) shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 7 calendar days from the last land —disturbing activity. il) All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 14 calendar days from the last land —disturbing activity. b) Conditions — In meeting the stabilization requirements above, the following conditions or exemptions shall apply, 1) Extensions of time may be approved by the permitting authority based on weather or other site —specific conditions that make compliance impracticable. il) All slopes 50' in length or greater shall apply the ground cover within 7 days except when the slope Is Hatter than 4: 1. Slopes less than 50' shall apply ground cover within 14 days except when slopes are steeper than 3:1, the 7 day —requirement applies. ill) Any sloped area flatter than 4: 1 shall be exempt from the 7—day ground cover requirement. Iv) Slopes 10' or less In length shall be exempt from the 7—day ground cover requirement except when the slope is steeper than 2: I. iv) Slopes 10' or less In length shall be excempt from the 7—day ground cover requirements except when the slope is steeper than 2:1. v) Although stabilization is usually specified as ground cover, other methods, such as chemical stabilization, may be allowed on a case —by —case basis. vi) For portions of projects within the Sediment Control Commission —defined "High Quality Water Zone" (15A NCAC 04A. 0105) , stabilization with ground cover shall be achieved as soon as practicable but in any event on all areas of the site within 7 calendar days from the last landdisturbing act. vii) Portions of a site that are lower in elevation than adjacent discharge locations and are not expected to discharge during construction may be exempt from the temporary ground cover requirements if identified on the approved E&SC Plan or added by the permitting authority. Ground Stabilization Chart Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions Perimeter dikes, owales, ditches, 7 days None and slopes High Quality Water (HOW) 7 days None Zones If slopes are 10' of lee Slopes steeper than 3:1 7 da s y in length and are not steeper than 2:1, 14 days are allowed 7—days for slopes 510 Slopes 3:1 or p 14 days greater than 50 feet flatter in length All other areas None (except for with slopes flatter than 4:1 14 days perlmeters and HQW Zones) *Extensions of time may be approved by the permitting authority based on weather or other elte—specific conditions that make compliance impracticable. (Section II3(2)(b)) 61 x 7'W x 18" Dip. Class "B" Riprop omd CONSTRUCTION SEQUENCE: Site preparation — Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam Is comalete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facil'tats vegetative establishment. Place temporary sediment control measures below the basin as needed. Cut—cff trench — Excavate a cut—off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but in no case make It less than 2Ft, deep. The cut—off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 Ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the same as those for the embankment. Keep the trench dry during backfilling and compaction operations. Embankment — Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks and other objectional material. Scarify areas on which fill Is to to placed before placing fill, the fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the boll, It is too wet for proper compaction. Place fill material in 6 to 8—Inch continuous layers over the entire length of the fill area and then machine compact It so that the entire surface of each layer is compacted. Construct the embankment 6 inches above design elevation to allow for settlement. Seed embankment as soon as grading is complete. Conduit spillways — Securely attach the riser to the barrel or barrel stub to make a water tight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and deer on a firm, smooth foundation of impervious Boll. Do not use pervious mater ial such as sand, gravel, or crushed stone as backfill around the pipe or anti —seep collars. Place the fill material around the pipe spillway in 4--inch layers and compact It under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2Ft of hand —compacted backfill over the spillway before crossing it with construction equipment. Anchor the riser In place by concrete or other satisfactory means to prevent floatation, In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. Emergency spillway — Install the emergency spillway in undisturbed soil. The achievement of plannned elevatlons, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway, Seed spillway as soon as Installation is complete. Temporary Skimmer — Assemble the skimmer following the manufacturers instructions, or as designed, Loy the assembled skimmer on the bottom of the basin with the flexible joint at the base of the riser. Pra%ent the skimming device from settling Into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. Attach the flexible joint to the riser by a water tight connection and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin, This will be used to pull the skimmer to the side for maintenance. PoraLe Baffles — Install porous baffles as specified In Porous Baffle Detall. Inlets — Discharge water into the basin In a manner to prevent erosion. Use diversions with outlet protection to divert sediment —laden water to the upper and of the pool area to improve basin trap offlclency. Erosion control — Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. Safety — Sediment basins may attract children and con be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing Is likely. Follow all state and local requirements. Diversion Dike 4' Min. Hold —Down Stakes!'; ' .. i 10' SPACING l 12" Plastic I -�-- Corrugated ? I I w-- Pipe W-a Top of LJ i I I Diversion �I 41 t;J ,� }TI E - - if Natural Ground Diversion Channel t. 4'Min. ' Leval _ Section Island Over Inlet Baffle Construction Specifications: 1. Grade the basin so that the bottom Is level front to back and side to side. 2. Install post or saw horse across the width. 3, Steel posts should be driven to a depth of 24 Inches, spaced a maximum of 4 feet appart, and Installed up the sides of the basin as well. The top of the fabric should be 6 Inches higher than the Invert of the spillway. Tops of baffles should be 2 Inches lower than the top of the berms. 4. Install at least three rows of baffles between the Inlet and outlet discharge point. Basins less than 20 feet In length may use 2 baffles. 5. When using posts, add a support wire or rope across the top of the measure to prevent sagging. 8. Wrap porous material, like jute backed by coir material, over a sawhorse or the top wire. Hammer rebor Into the sawhorse logs for anchoring. The fabric should have five to ten percent openings In the weave. Attach fabric to a rope and a support structure with zip ties, wire, or staples. 7. The bottom and sides of the fabric should be anchored in a trench or pinned with 8—inch erosion control matting staples. S. Do not splice the fabric, but us a a continuous piece acr oss the basin. E}affle__Maintenance Inspect baffles at least once a week and after each rainfall. Make any required repairs immediately, Be sure to maintain access to the baffles. Should the fabric of a baffle collapse, tear, decompose, or become ineffective, replace it immediately. when It reaches hail full to Remove sediment depositsprovide adequate storage volume for the next rain and to reduce pressure on the baffles. Take care to ovoid damaging the baffles during cleanout. Sediment depth should never exceed half the designed storage depth. After the contributing drainage area has been properly stabilized, remove all baffle materials and unstable sediment deposits, bring the area to grade, and stabilize it. INLET FLOW Baffles(typ.) _..". inlet Zone 35% of surface area OUTLET FLOW PLAN VIEW Support Post Support rope to wire 24" Into bottom to prevent sagging or side Coir mesh or similar, stapled or trenched into bottom or side BAFEL I-�coWN11 Saffl(@ OVER Construction Specifications: A common failure of slope drains is caused by water saturating the soil and seeping along the pipe. This creates voids from consolidation and piping and causes washouts. Proper backfilling around and under pipe "haunches" with stable soil material and hand compacting in 6" lifts to achieve firm contact between the pipe and the soli at all points will eliminate this type of failure. 1. Place slope drains on undisturbed soil or well compacted fill at locations and elevations shown on the plans. 2. Slightly slope the section of pipe under the dike toward it's outlet. 3. Hand tamp the soil under and around the entrance section in lifts not exceeding 6". 4. Ensure that fill over the drain at the top of the slope has minimum dimensions of 1.5 ft, depth, 4 ft. top width, and 3:1 side slopes. 5. Ensure that all slope drain connections are watertight, 6. Ensure that all fill material is well —compacted. Securely fasten the exposed section of the drain with grommets or stakes spaced no more than 10 ft. apart. 7. Extend the drain beyond the toe of the slope and adequately protect the outlet from erosion. B. Make the settled, compacted dike ridge no less than 1 ft. above the top of the pipe at every point. 9. Immediately stabilize all disturbed areas following construction. Maintenance: Inspect the slope drain and supporting diversion after every rainfall and promptly make necessary repairs. When the protected area has been permanently stabilized, temporary measures may be removed, materials disposed of properly, and all disturbed areas stabilized appropriately. Temporary Mope Dra' n DMSfl Scale: None Top of Hand —Compacted Fill (Island) 4' min 0.5' min IN MIN 6 3:1 d � A ..3e...r� First Chamber 25% of surface area Second Chamber 25% of surface area Outlet Zone 15% of surface area Stake to support wire Maintenance: Inspect skimmer sediment basins at least weekly and after each slgnificant (one—half Inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to Its original dimensions when sediment accumulates to one—half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath It can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing In the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re —anchor the baffles If water Is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. if this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see If It Is clogged; if so remove the debris. If the skimmer arm or barrel pipe Is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the spillway for damage and make any required repairs with that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and Inspect the embankment for piping and settlement. Make all necessary repairs Immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather con result In Ice forming in the basin. Some special precautions should be taken In the winter to prevent the skimmer from plugging with Ice. SELF INSPECTION REQUIREMENTS� The landowner, the financially responsible party, or the landowner'@ or the financlally responsible party's agent shall perform an inspection of the area covered by the pion after each phase of the pion has been completed and after establishment of temporary ground cover 1n accordance with G.S. 113A-57(2). The person who perform@ the Inspection shall maintain and moke available a record of the inspection at the site of the fond —disturbing activity. The record shall set out any significant deviation from the approved erosion control plan, Identify any measures that may be required to correct the deviation, and document the completion of those measures. The record shall be maintained until permanent ground cover has been established as re uired by the approved erosion and sedimentation control plan. The Inspections required by this subsection shall be In addition to Inspections required by G.S. 113A-61,1. SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA (ACRES < 10 AC. MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6;1 WIDTH RATIO VOLUME MOA�, REQUIRED DISTURBED) 325 SURFACE E� FC REQUIRED 010) AVERAGF. AREA* WIDTH LENGTH ' AREA OF BASIN WATER SURFACE AT TOP OF 'RIMARY SPILLWAY LENGTH EMBANKMENT 1 Q' RETRIEVAL ROPE SKIMMER DEWATERING`` DEVICE EMERGENCY L SPILLWAY BAFFLES (typ.) CROSS—SECTION VIEW 1' FREEBOARD - Ww5' MIN. c"— EMBANKMENT INFLOW B�MAX". DEPTH OF FLOW OVER i - __. _....._ ._.. EMERGENCY SPILLWAY STRUCTURE -i BAFFLES Z�5' MAX. T-1.5' MIN. '� DEWATERNG ; ZONE EMERGENCY SPILLWAY F FILTER FABRIC SEDIMENT ANTI —SEEP STORAGE ZONE COLLAR BASIN€ BASIN DEPTH (FT) CLEANOUT DEPTH (Fr) H/2 LENGTH (FEET) WIDTH (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER SKIMMER ORIFICE #HOLES 1 2 1 SEE PLANS 4 1/2 4 2 1 2 1 SEE PLANS 4 1 2 4 3 2 1 SEE PLANS 4 1 2 4 4 2 1 SEE PLANS 4 1 2 4 5 2 1 SEE PLANS 4 1 2 4 6 2 1 SEE PLANS 4 1 2 4 7 1 2 11 SEE PLANS 1 4 1 1 2 4 PVC END CAP PVC TEE ARM ASSEMBL PERSPECTIVE VIEW PVC ELBOW PVC END CAP PVC PIPE 1 /2" HOLES IN UNDERSIDE FLEXIBLE HOSE WATER SURFACE SCHEDULE 40 PVC PIPE ENCLOSURE - WATER ENTRY UNIT PVC VENT SCHEDULE 40 PIPE PVC PIPE 41 CLIENT: JOHNNY HARRIS TRUCKING, INC. 4291 Dowd Road Carthage, NC 28327 J W 7 W LL W mom Q M O Cr Cr 1 � i I E N G I N Eng1neer(ng-Sul veyIng-Planning 160 Porry Orlve Southern Pines, NC 28367 Phone: (010) 246.0038 NC uicanse a C-3191 Www s n s e17eers. jA CA `A? PVC TEE ORIFICE PLATE 2 ' e yy,9cL _ ell S'y'�NE , sPN FRONT VIEW r, „ ,i' RELEASED for CONSTRUCTION "pr;;rT��pra� f:;1 IMISS AS NOTED B-14-19 C09