Loading...
HomeMy WebLinkAbout0403AnsonLF_drawing_20001003Permit: Name: Anson County SW Management Fac., Const.PlanApp. County: Anson Shipped Date: Box: SW-11-029 Document Type: Other (0) Document Date: 10/3/2000 Division: Waste Management (WM) Sub -.Division: Solid Waste (SW) Document Category: Facility/ (F) Document Group: Authorization or Permit (P) Description: Map: . Maps in Roll: s- m1 p ♦ O TRANSMISSION PIPING 6" 0 BUTTERFLY VALVE LIQUID LEVEL INDICATOR (BY TANK SUPPLIER) 10" 0 FLANGED/BLIND SS OFFSET MIXER MOUNTING NOZZLE (BY TANK SUPPLIER) 4" 0 DOUBLE NOZZLE WITH INTERNAL AND EXTERNAL 90` ELBOW FOR AERATION LINE fy r r �r y r r r SUMP 7 FOR AERATION SYSTEM PRIMARY STEEL STORAGE TANK 200,000 GALLON CAPACITY MIN. (BY TANK SUPPLIER) ACCESS LADDER (BY TANK SUPPLIER) 4"0 GATE VALVE " PIPE TAB WITH HOSE BIB— JOINT SEALANT 4 1 EXP, JT. FILTER BOND BREAKER 6" WATER STOP GREASE ROD REINFORCEMENT INSIDE PIPE NOT SHOWN ,�-- 1 " MIN. VOID "O GALVANIZED SMOOTH ROD x 3'-0" LONG AT 2'-0" " I.D. STEEL PIPE x 1'-7" Q.C. STAGGERED EACH SIDE LONG CLOSE END TO PREVENT CONCRETE INTRUSION THICKNESS AS SHOWN ON DWGS, JOINT2 EXPANSION N.T.S. • 0' ANGLES OVER SECONDARY CONTAINMENT WALL ♦ P'• 6" 0 TRANSMISSION % PIPING 45® ANGLE AT TANK TOP 6" 0 BUTTERFLY VALVE 6" 0 OVERFLOW PIPING (10' MAXIMUM DISTANCE) BY CONTRACTOR SUPPLEMENTARY STEEL STORAGE TANK 200,000 GAL. CAPACITY MIN. (BY TANK SUPPLIER) 2" 0 INLET CONNECTION <-®- 2" 0 PIPE X4"O LEXIBLE HOSE WITH 4"0 OPW END CONNECTIONS CONNECTEO TRANSFER PUMP 6" 0 OVERFLOW OUTLET - (PIPE WITH FLAP TO FLOOR BY CONTRACTOR) SUMP ACCESS LADDER 24" 0 ACCESS MANWAY (BY TANK SUPPLIER) TOP OF TANK FOUNDATION SHOULD BE MINIMUM 6" 4" 0 GATE ABOVE FLOOR OF SECONDARY VALVE CONTAINMENT AREA 4" 0 PIPE N " PIPE TAB WITH HOSE BIB 4" A CHECK VALVE NO 4"0 BUTTERFLY VALVE 4" 0 OPW CONNECTION 4" 0 BUTTERFLY 4" 0 FLOW METER (IN -LINE) SEE NOTE 4 CONTROL VALVE CENTER 4" 0 PIPE (MIN • . MIN. 4" 0 OPW CONNECTION ) f ) 7>_Q99 ` 1 Q9_Qf8 a 4" 0 PIPE TO SEWER ° (BY EARTHWORK CONTRACTOR) s , a ° 5,_0» 4 a PROVIDE SUBMERSIBLE SUMP PUMP EQUIPPED a GWITH AUTOMATIC FLOAT a SWITCH AND CHECK VALVE (25 GPM) a 4 a a 3a_Q$l a a a, a a 3'-0„ d 4 a Q 4 a. ° q 4 4 4 n 4 a CONTAINMENT TANK PLAN N.T.S. mlva r w #r THICKNESS AS SHOWN ON DWGS. EXP. JT. FILTER e S[ At AAI"r MINICELL BACKER " FOR T< 1 " FOR T>1" WORK THIS DETAIL y ` WATER r O'" INSTALLED BY OTHERS AT FOUNDATION.TANK EXPANSION JT. FILLER—` WHERE REQUIRED T �JOINT SEALANT N.T.S. ♦ �,r,--- DETAIL/CROSS—SECTION -'` DESIGNATION 4 1 SHEET WHERE DETAIL/ CROSS—SECTION IS LOCATED p NOTES:, 1,.. WORK THIS SET WITH THE STRUCTURAL TANK DRAWINGS AND CALCULATIONS PROVIDED BY THE TANK MANUFACTURER. 2. ALL PROCESS PIPING NECESSARY FOR TANK OPERATIONS SHALL BE PLACED UP AND OVER THE CONTAINMENT WALL, NOT THROUGH. 3. REFERENCED ELEVATION AT THE TOP OF TANK FOUNDATION IS 1 QQ,QQ (ASSUMED). 4. FLOW METER SHALL BE SITUATED SUCH THAT ALL FITTINGS, VALVES, TURNS, OR OTHER APPURTENANCES ARE A MINIMUM OF TEN (10) PIPE DIAMETERS (NOMINAL) FROM BOTH THE INLET AND OUTLET OF THE METER. 5. TANK FOUNDATION DIMENSION AS ILLUSTRATED IS 36'0. ACTUAL TANK FOUNDATION DIMENSION SHALL BE AS REQUIRED BY THE TANK MANUFACTURER. 6 THE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS ILLUSTRATED ON THIS DRAWING UNLESS OTHERWISE NOTED. THIS INCLUDES ALL PIPING AND FITTINGS TO BE CONNECTED TO `THE TANK PENETRATIONS. 7. ALL TANK PENETRATION TO BE PERFORMED BY THE TANK MANUFACTURER. 8. ALL SITE SAFETY IS THE RESPONSIBILITY OF THE CON• THE CONTRACTOR SHALL COMPLY WITH ALL TERMS AND CONDMONS OF THE CONSTRUCTION DOCUMENTS INCWDING LIMITED TO ALL OCCUPA11ONAL SAFETY AND HEALTH R 0 V E D ADMINISTRATIONNOT AND ALL OTHER RULES, STATE, A P P AND FEDERAL RULES AND REGULATIONS REGARDSAFETY AS 'NG !VISION OF SOLID ASTE MANAGEMENT THEY RELATE TO ALL CONSTRUCTION ACTMTIES ON SITE AS T ` BY - • NOTES: REINFORCEMENT 1. PROVIDE Q ELEVATED SLABS NOT SHOWN & STRUCTURAL SLABS ON GRADE. 4 JOINT SEALANT 2. SEALANT NOT REQUIRED ON 1 UNDERSIDE OF SLABS ON GRADE. N.T.S. Gl e AAj S. s lleefeteets��'4 ALINES do ASSOCIATES, INC. CONSULTING ENGINEERS 111 COMMONWEALTH COURT SUITE 104 CARY, NC 27511 (919) 319-1 187 r �►' DESCRIPTION 'PROJECT NO:R97-875H:6::8�?-.�'CAD: WRB 08/08/00 i`• DRAWINGS COUNTYANSON • r WASTE MANAGEMENT FACILITY SHEET TITLE - CONTAINMENT TANK PLAN AND DETAILS (SHEET 1 OF 2) ]FDRAWING NO. r. DEVELO�� r MENTi; r CHAMBERS OF NORTH CAROLINA, -INC, ADDITIONAL #5 @ 8 ALTERNATE WITH MAIN 4"0 GATE VALVE WITH LOCK HORIZONTAL REINFORCEMENT J AND EXTENSION, EXTEND PIPE (TYPE. 4 CORNERS) DAYLIGHT TO RIP RAP OUTLET STRUCTURE ON SLOPE. i CONTAINMENT C—Ot$ rl 3" CLEARANCE 3" (N0M.) #4 @ 18" O.C. CONT. BOT. (TYP) KEY #4 Q 48" O.C. #4 @ 12" E.W. 2" CLEARANCE 6" 12" rr����`\00000 r 4" COMPACTED GRAVEL ON 3" PREPARED SUBGRADE i . � BY CONTRACTOR 4" COMPACTED PaD GRAVEL PREPARED r . CONTRACTOR ,y i , .i I* ! • y • it is lt. ... TOP OF r T ♦• ALUMINUM GRATING FRAMEWITH • .50 • AT WALL) / - � - ALL AROUND • i ALL AROUND TENSION LAP SPLICE LENGTHS FOR GRADE 60 REINFORCING BAR ,000 psi CONCRETE BAR 4,000 psi CONCRETE SIZE TOP BARS** OTHER BARS SIZE TOP BARS** OTHER BARS A B A B A B A B 3 22 28 17 22 #3 19 24 15 1 #4 29 37 22 29 #4 25 32 19 25 #5 36 47 28 36 #5 31 40 24 31 #6 43 56 33 43 #6 37 48 29 37 #7 63 81 48 63 #7 54 70 42 54 #8 72 93 55 72 #8 62 80 48 62 #9 81 105 62 81 #9 70 91 54 70 #10 91 118 70 91 #10 79 102 61 79 #11 101 131 78 101 #11 87 113 67 87 *REF. ACI 318-95 FOR NORMAL WEIGHT CONC. AND CASE 1 COVER AND SPAC. REQ.S. **TOP BARS ARE HORIZONTAL BARS W/MORE THAN 12 INCHES OF CONCRETE CAST BELOW THE BARS. SLOPE SLAB TO PROMOTE POSITIVE DRAINAGE SUMP. TOP OF SUMP TO BE 12" LOWER THAN TOP OF TANK FOUNDATION. 3'x3'x3' SUMP 1 2 TOP OF SUMP EL. 99.0 2 TYPICAL WALL CORNER 3 REINFORCING 2 i 111 -i y , •• ■► i 001011 aqi I Zia M e ■ , lillfftll*-Ilf--3t�l-til-VA-,W�tmtkK--hlr-&i�- r)ATF.c 112rS. teee4`�` go. give* ALMES a. ASSOCIATES, CONSULTING• 111 COMMONWEALTH COURT SUITE #1 '' r r .-- DETAIL/CROSS—SECTION DESIGNATION 3 1 SHEET WHERE DETAIL/ CROSS—SECTION IS LOCATED 2. ALL PROCESS PIPING NECESSARY FOR TANK OPERATIONS SHALL BE PLACED UP AND OVER THE CONTAINMENT WALL, # THROUGH. ENTRAINMENT3. REFERENCED ELEVATION AT THE TOP OF TANK FOUNDATION IS 100.00 (ASSUMED). PROVIDE CONCRETE WITH 5% AIR AND i RATIO/MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS AS FOLLOWS: PIPE ENCASEMENT, CONCRETEa ## PSI UNREINFORCED FOUNDATIONS, SIDEWALKS ON GRADE PSI OTHER STRUCTURAL CONCRETE 0.50�4"Ooo PSI 4. PROVIDE REINFORCING - . D 60, PROVIDE WELDED WIRE FABRIC CONFORMING TO ASTV Al 85. DRAWINGS, i. FOR ALL REINFORCING SPLICES NOT OTHERWISE NOTED ON PROVIDE CLASS w TENSIONr SPLICES FOR TOP BARS OR OTHER BARS AS APPLICABLE. TOP BARS ARA ANY HORIZONTAL BAR PLACED 1. Y. MORE y FRESHOF CONCRETE aST IN THE MEMBER BELOW ter•. HORIZONTAL BARS IN WALLSD NOT BE CONSIDERED TOP BARS. i yr DETERMINE LAP LENGTHS BY LARGER SIZE OF B.* TO BE - • a r - a s —A 0AR-14rdwILMNIMpi DESCRIPTION jPROJECT: PERMIT RAWINGS II ANSON COUNTY SOLID WASTE � MANAGEMENT FACILITY Alm SHEET TITLE: CONTAINMENT TANK PLAN AND DETAILS (SHEET 2 OF 2) AWIN NO. CHAMBERS r