Loading...
HomeMy WebLinkAboutSDTF2605_INSP_20190801FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Cumberland Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: SDTF 26-05 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF X FILE TYPE: COMPLIANCE Date of Site Inspection: 8/01/2019 Date of Last Inspection: 6/28/2019 FACILITY NAME AND ADDRESS: Liquid Environmental Solutions of Georgia LLC 2990 Ervin Alston Road Fayetteville, NC 28306 GPS COORDINATES: N: 34.95960 E: -78.83924 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Joe Mayberry Telephone: (910) 323-4672 Email address: manuel. perez@liquidenviro.com Fax: (910) 323-0714 FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Connie Wylie Joe Mayberry & Dean Springstube STATUS OF PERMIT: Active – permit expired December 31, 2018/submittal under review PURPOSE OF SITE VISIT: Pre-operational STATUS OF PAST NOTED VIOLATIONS: Cleanup efforts have been taken in the previous spill areas around tanks #2 & #3. Continue efforts to prevent spills while these tanks are still in use. Any spills shall immediately be cleaned up. OBSERVED VIOLATIONS: N/A SEE BACK OF PAGE The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. Inspected the construction progress for the permit modification. All tanks/units have been installed inside the concrete containment area. The tanks appear structurally sound. The connecting line from the containment area to the sewer line has not yet been installed. The old horizontal tanks are still in place & in use (for storage/processing) but will be removed soon. 2. Reviewed the modification submittal with Joe & Dean. Discussed the waste process - drawings/flow chart were reviewed. 3. The required signs are posted. The approved setbacks are being met. No significant odor or vectors noted at this time. The access road is adequate. The required 5 foot cleared radius around the facility is present. Please contact me if you have any questions or concerns regarding this inspection report. _ Phone: (910) 433-3352 Connie S. Wylie Regional Representative Sent on: Email Hand delivery X US Mail Certified No. [ _]