Loading...
HomeMy WebLinkAboutSDTF7823_INSP_20190712FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Robeson Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: SDTF 78-23 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF X FILE TYPE: COMPLIANCE Date of Site Inspection: 7/12/2019 Date of Last Inspection: 2/27/2019 FACILITY NAME AND ADDRESS: Belton’s Septic Tank Service P.O. Box 64067 Fayetteville, NC 28306 GPS COORDINATES: N: 34.93032 E: -79.05429 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Maxine & Frankie Jones Telephone: (910) 425-8876 Email address: N/A Fax: (910) 425-1497 FACILITY CONTACT ADDRESS: 898 Camden Road Raeford, NC 28376 PARTICIPANTS: Connie Wylie STATUS OF PERMIT: Active – permit expires November 19, 2019 PURPOSE OF SITE VISIT: Routine STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: N/A SEE BACK OF PAGE The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. Noted an area of septage debris in front of the tanks which has been cut when the surrounding vegetation was cut. This may be the remnants of a septage debris pile that was noted on the last visit of 2/27/2019. Clean up all septage debris from the ground surface. No septage debris (waste, paper or plastic trash) from hoses, the storage tank or truck tank may be placed on the ground surface. Discussed the situation with Frankie Jones by phone and he indicated that he would address the situation. 2. The two tanks appear structurally sound. 3. The required signs are posted and the access road is adequate. 4. No recent spills or leaks were noted. It appears that septage is being transferred to/from the facility in a safe and sanitary manner – other than the cut septage debris on the ground. No vectors or odors were noted. 5. The required 5 foot cleared radius (free of excess vegetation or debris) is present around the tanks at this time. 6. The approved setbacks are being met. 7. This Septage Detention or Treatment Facility Permit expires on November 19, 2019. The renewal application shall be submitted by August 19th as per Rule .0837(m) as stated in the notification letter that was sent on July 1, 2019. Please contact me if you have any questions or concerns regarding this inspection report. _ Phone: (910) 433-3352 Connie S. Wylie Regional Representative Sent on: Email Hand delivery X US Mail Certified No. [ _]