HomeMy WebLinkAboutCCB0053_ABC_Response to DENR_200170601ASH BASICS COMPANY
P. O. BOX 3573
MOORESVILLE, N.C. 28117
(0. 704-799-2 44) ( . 704-9 6- 73 )
6-1-2001
WILLIAM R. HOCUTT
ENVIRONMENTAL CHEMIST
NCDEHNR SOLID WASTE SECTION
401OBERLIN ROAD, SUITE 150
RALEIGH , N. C. 27605
Dear Mr. Hocutt,
Subject: Follow up of notification submitted on 1-23-2001 and response from you on 2-13-2001,
concerning the proposed use of Coal Combustion By -Products for Structural Fill.
Per the requirements of Solid Waste Management, Section .1700, Requirements For Beneficial
Use Of Coal Combustion By -Products find the enclosed submittal for notification.
I am enclosing a new drawing for your review for the use of fly ash produced at the Duke
Energy's Plant Marshall in Terrell N.C. and development of RACE PARK USA.
The following changes and /or clarifications are as follows:
1) Revised Drawing of proposed site and erosion control plan
2) GTSI Groundwater Assessment / Previously submitted
3) Owners Acknowledge and Consent / Previously submitted
4) TCLP Analysis / Previously submitted
5) 8.5 X 11 copy of USGS location map, 7.5 Minute Series, Mooresville NC / Previously
submitted
A) Proposed Start / Finish date: Due to delays from some of your request and others of the
owners, the Start date has been moved to effectively begin when this notification is
acknowledged as acceptable by NCDENR. Site preparations have progressed in accordance
to the approved erosion control plan and at the guidance of your local office in Mooresville,
NC. (7-2-2001) ?
Finish Date: To be approximately 90 days from start date. ( 10-2-2001 ) ?
B) Find enclosed a copy of the U. S. ARMY CORPS OF ENGINEERS, General permit dated
May 29,2001, pertaining to this project as per the revised and submitted drawing.
CONT. CLARIFICATIONS / SUBMITTAL
6-01-01
PG. 2
C) As per your request, I am satisfied the CCBs will be placed a minimum of 2' above the
seasonal high groundwater table after additional assessments were made by GTSI and myself.
D) The well for the adjoining property owner has been plotted on the drawing and the area within
120' of the well has been maintained as natural earth.
E) The repetition of language in the notes has been corrected on the enclosed drawing.
F) The slope on the drawing has been changed to 3:1 as per the requirements
G) The purpose of the ASH FILL PLAN setbacks was for the purpose of showing no CCBs
would be placed within the setbacks requirements ( 25' of property line ). The drawing has
been modified to reflect the only areas affected.
Some of the changes requested had already been in the process and concerns relating to the
potential jurisdictional wetlands was raised after the submittal. We work closely with the local
state and county offices to insure the success of these projects.
I would appreciate a response to this matter as soon as possible due to time restraints. I will
gladly meet with you at your convenience for the review.
Please feel free to contact me any time at ( 704 ) 799-2944 O. or ( 704 ) 906-3735 M.
I look forward to hearing from you. Thanks! ( 704 ) 363-1314 M.
PLEASE NOTE A CHANGE OF ADDRESS FOR ASH BASICS COMPANY, INC. FOR
YOUR RESPONSES AND / OR FUTURE CORRESPONDENCE.
ASH BASICS COMPANY, INC. P. O. BOX 3573 MOORESVILLE, NC 28117-3573
Sincere ,
Dean Johnston - President
Ash Basics Company, inc.