May 28, 2004
Mr. Henry B. Long
Drawer A
Garysburg, NC 27831�
Subject: Arthur's Creek Coal Combustion BYer duct Reuse Plan
Northampton County, NC
Dear Mr. Long,
NCDENR
I have reviewed the information contained within the rthur's Creek Development Northampton
County, NC Coal Combustion Byproduct Reuse flan pared by: Plumbline Corporation P.A.
dated April 23, 2004. I also received from Plumbline Corp. an addendum consisting of the plan
sheets, including cross sections, dated April 27, 2004. After review of these documents I have
the following comments and requests:
1) The notification should include the following ver loge according to the North Carolina Solid
Waste Rule 15A NCAC 13B [Rule] .1703 (a) (6) "Changes that occur will require
subsequent notification of the Division of Solid ante Management".
2) Coal coutbustion by-products utilized on an exter or slope of a structural fill shall not be
placed with a slope greater than 3.0 horizontal to .tl vertical (3:I) according to Rule
.1705(l). The slopes as presented on the construe 'on plains are as steep as 1.2:1. Please
submit new drawings with the slopes in accordance with the rule. If Coal Combustion
adjusted an site in order to concur with the Rule.
The slopes which are shown on the cross sections are not shown to be representative of what
is on the plan view. Along cross section A A the slope on the east side of the project is
actually 2.8-1. Along cross section B-B, the slop on the north side is 2.9:1 and on the south
side is 2.6:1. These cross sections will need to be resubmitted after the new design plans are
complete with no greater than 3:1 side slopes.
If reduction of the fill area is necessary to achic
of steep slopes found close to ACOE flag 1 and
volumes and project end date. .
appropriate slopes, especially in the areas
COE flag 8, please submit changes in
1646 Mail Service Center, Raleigh, orth Carolina 27699-1646
3)
4}
PI Field Sketch,'�e�d
Submit copies of the Survey � the US A R1Z
correspondence O BE � IITH4RrZAT'
D,EPAR�'3�T
ON
in this notification-
and
of the nature, Purpose use of the pri
The description of the prole'
on Page 1 of the Notification "The purpose
products as structural fill to constructVe Opel MCI
Paragraph 3 goes an to state slid two propose
with a foot print for an office buildb -- a not o Pro ose
and an access road. The access road i construction
of CCB. if CCB is to be used in the road
submitted to show this.
date of lviay 26, 2004 having
5} The anticipated start fill ro ect has
construction of thus CCB of the strur
project, -which is z
construction or opera
tion
to be performed accordingly.
Please feel free to contact me with any questions or c
919 733-0692 ext. 345, or by email at elen lorscheid
Sincerely,
Ellen Lorscheider
Permitting Hydrogeologist
Cc: Henry g H. Grant, Plumbline Corp. P.A.
Jim Barber, S�1S
Ben Barnes, SWS
lineation Form and other
OFENGLNEERS—NO
7k_VD f.= which was presented
xt according to Rule .1703 stated
is to utilize coal combustion by_
tercial site for a private developer.
re a prime building site comp
lete
auxiliary buildings, a Parking lot,
c construction plans to be to be
out
iditional plans will need
ly passed it is possible that
mod, Any changes to the
i per above or per the Rules will need
I can be -reached at by phone at