FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
SLAS
COUNTY: HAYWOOD
MSWLF
PERMIT NO.: 4406-INDUS-1984
Closed
HHW
White
Incin
T&F
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&F/
Tire
Industrial
X
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: 06/19/2019
FACILITY NAME AND ADDRESS:
Landfill No. 6
1155 Incinerator Rd
Canton, NC 28716
Date of Last Inspection: 01/09/2019
GPS COORDINATES: N: 35.548508' W: 82.876149'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: John Frazier
Telephone: 828-646-2028
Email address: john.frazier@everpack.com
FACILITY CONTACT ADDRESS:
John Frazier
Evergreen Packaging
PO Box 4000
Canton, NC 28716
PARTICIPANTS:
John Frazier, Evergreen Packaging
Lee Hill, NCDEQ — Solid Waste Section
STATUS OF PERMIT:
Life of Site permit issued October 26, 2018
Closed Phases: Landfill No. 6 Areas A, B, C, F, G & H
Open Phases: Landfill No. 6 Area D
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
N/A
OBSERVED VIOLATIONS:
None
Page 1 of 5
NORTH CAR()LINAD_E Q��
OepaNnent W Envimnmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. All photos were taken by Lee Hill on June 19, 2019.
2. The facility is permitted to receive solid waste generated by Blue Ridge Paper Products, Inc.
3. The facility accepts fly ash from multi -boilers, lime waste, wastewater treatment plant sludge, wood waste debris,
cinders, biosolids and asbestos containing material (ACM). Asbestos containing material is landfilled in a
separate area from all other materials.
4. The facility is approved for an average annual disposal rate of approximately 450,000 yds3.
Record Review
5. Facility records are kept at the Canton Mill Office and were brought to the landfill for review.
6. The permit and operations plan were available for review upon request.
7. The landfill received 425,362 yds3 of material from January 2018 to December 2018 and received 188,914 yds3
from January 2019 to May 2019.
8. Leachate pumping records were available for review. The facility pumped 41,084,525 gallons of leachate during
the 2018 calendar year and pumped 25,023,750 gallons from January 2019 to May 2019. The facility received
54.49 inches of rain during calendar year 2018 and has received 25.01 inches of rain from January 1 through May
31, 2019.
9. Quarterly landfill gas monitoring was conducted on August 31, 2018, November 29, 2019, March 19, 2019 and
May 31, 2019. No exceedances were noted during the monitoring events.
10. Annual landfill training was conducted on March 20 and 21, 2018 by Sevee & Maher Engineers. The following
individuals completed the annual training:
• Chris Chambers
• Randy Fie
• James Inman
• Wes Whitted
• Shane Willis
• Eddie Worley
• Jeff Mills
• Kim Johnson
• Charlie Moore
• Dan Myer
• John Frazier
• Eric Werner
• John Pryately
• Jacob Trantham
• Tracy Willis
• James Bright
• Walt Gibson
• Kyle Krege
• Sean Simpkins
11. Asbestos cell inspections and disposal records were available for review. The facility received 41,440 pounds
of asbestos containing material (ACM) during calendar year 2018 and has received 1,380 pounds of material
thus far during 2019.
Page 2 of 5
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
o"' t0E!�'m"""°"""' Solid Waste Section
Operations Inspection of the Landfill Unit (4406-INDUS-1984)
12. The landfill access roads are constructed of concrete, asphalt and gravel and were in good condition at the time
of inspection.
13. The Asbestos Containing Material (ACM) Disposal Area is located on the east side of the facility. The facility
received asbestos in January and April 2019. The ACM area was observed to have good soil and groundcover
and was well managed at the time of inspection.
14. Edge of Waste Markers (EOW) were installed on all fill areas of the landfill.
15. Closed areas F, G, & H were observed to have good vegetative cover and are cut for hay by local farmers. The
areas had not been cut at the time of inspection due to wet weather.
16. The facility has three interconnected leachate ponds located to the south of Area B — Lower and no visual
deficiencies were observed. The facility was pumping leachate and there was approximately six feet of
freeboard at the time of inspection. Roughly one third of the leachate in the pond closest to the pump house had
a pink tint. Facility staff stated that the color was due to iron content.
17. The facility is currently filling fly ash from multi -boilers, lime waste, wastewater treatment plant sludge, wood
waste debris and cinders in Area D. Multiple working faces were being utilized at the time of inspection
depending on the consistency of material.
18. The facility has installed an emergency pump which is connected directly to the pump station at the southern end
of Area D — South. The pump is used to move surface water from the cell to the leachate ponds during rainfall
events.
19. Some woody vegetation was growing on the slopes of Area C — Lower. Facility staff stated that the landscape
contractor was in the process of removing the material. Please continue to remove woody vegetation from all
closed landfill caps and slopes.
20. A slope failure on closed Area C — Lower that occurred earlier in the year has been repaired, seeded and good
vegetative cover was noted.
21. No issues were observed in Area B — Lower where the Solar array is located.
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Lee Hill
DN: cn=Lee Hill, o=Solid Waste
Section, ou=Field Operations
Branch,
email=lee.hill@ncdenr.gov, c=US
Date: 2019.06.24 13:27:17-04'00'
Lee Hill
Environmental Senior Specialist
Regional Representative
Phone: 828-296-4700
Sent on: June 24, 2019 to
X
Email
Hand delivery
US Mail
Certified No.12
John Frazier by:
Copies: Deb Aja, Western District Supervisor - Solid Waste Section
Page 3 of 5
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Leachate Pond
Emergency Pump
Page 4 of 5
FACILITY COMPLIANCE INSPECTION REPORT
��n1��;poii�
D_E Q�� Division of Waste Management
OepaNmen iEnvironmental0ualiry
Solid Waste Section
Area D
ACM Disposal Area
Page 5 of 5