Loading...
HomeMy WebLinkAbout4116_WI_HighPointCDLF_comment_Phase3A_PTC_FID1319798_201904221 Chao, Ming-tai To:Mike Brinchek Cc:Stacey Smith; David Pepper; Bryan Wuester; Seth Heath; Homewood, Sue; Stanley, Sherri; Drummond, Jaclynne; Kirchner, Chuck Subject:WI High Point C&D Landfill, Phase 3A construction, Permit # 41-16 Attachments: WI High Point C&DLF, Permit #4116-CDLF-2012 Hi Mike: FID Thanks to inform the Solid Waste Section (SWS) the progress of approval of wetlands impacts and mitigation measures due to the construction of Phase 3A at WI Hight Point C&DLF, Permit No. 4116-CDLF-2012. After reviewing the forwarded document (401 certification) and a set of construction drawings, the SWS would like to make the following comments/requests for additional documents for the Phase 3A project. 1. Please provide a copy of the Section 404/US Army Corps of Engineers Permit to Discharge Fill, Permit No. SAW-2014-01568 dated November 10, 2016 (Reference No. 5 on Drawing No. S1/Sheet No. 2). 2. On Drawing No. S1/Sheet No. 2, an unknown length of underdrain, connecting Wetlands No. 2 inside Phase 3A to the drainage features inside the future Phase 3B is proposed. This section of underdrain is new addition to the approved Permit To Construct Application, WI High Point C&D Landfill – Phase 3 dated May 2016 and approved on January 9, 2017 (DIN 27230). Therefore, please provide the following information, construction specification, and associated drawings, as needed: a. The detailed hydraulic design of this proposed underdrain should be provided to the revised Engineering Plan. b. A set of drawing (a plan view with stations covering the entire planned underdrain and the profile/cross-section at each station) should show the flow gradient, dimensions of each component of the underdrain, long-term seasonal groundwater elevation/ base rock stratum, and other pertinent information concluded from the requested hydraulic design. c. The Technical Specifications should be revised accordingly (Referring Drawing Nos. 3 & 5/Sheet Nos. S2 & EC1). i. The soil testing of the NCDOT # 57 stone – gradation and hydraulic conductivity which must be consistent with those used in underdrain hydraulic design. Testing method and frequency for each test parameter should be described in the specification. ii. Please specify the fill material that is placed above and below GCL. iii. Please specify the geotextile (Type GT-S). iv. The as-built survey and submittal requirement of the underdrain. 3. The surface water monitoring plan must be revised by adding at least a monitoring point, immediately adjacent to the daylight (the exit end) of the underdrain to detect if any contaminant is releasing to the water features downstream of the landfill Phase 3A due to the waste operations. Jackie might have additional request on this surface water monitoring requirement. Above-mentioned requests/comments are additional request to those in 04/11/2019 email (see attachment) to the modification to the PTC-Phase 3 Application which is scheduled for submittal on April 24, 2019 according to the Phase 3 Pre-construction meeting minutes. Please contact me if you have any question of the requested documents. Thanks. 2 From: Mike Brinchek <mike@smithgardnerinc.com> Sent: Monday, April 22, 2019 11:10 AM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: phil.may@carolinaeco.com; Stacey Smith <stacey@smithgardnerinc.com>; Chao, Ming-tai <ming.chao@ncdenr.gov>; David Pepper <david.pepper@gflenv.com>; Bryan Wuester <bryan.wuester@wasteindustries.com>; Seth Heath <seth.heath@wasteindustries.com> Subject: [External] WI High Point C&D Landfill CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Sue, As you discussed with Phil May earlier, attached are the Construction Drawings for Phase 3A of the WI High Point C&D Landfill. S+G is submitting the attached drawings to satisfy Condition 5 of the August 5, 2016 Approval of Individual 401 Water Quality Certification with Additional Conditions (also attached). We request that you review the attached construction drawings and provide a response to us noting that the conditions of the August 5, 2016 correspondence have been met and that no further action is required, prior to us beginning construction, which is scheduled for May 6, 2019. Should you have any questions or need any additional information, please contact me at your earliest convenience. Regards, Mike W. Michael Brinchek, PE Senior Project Manager SMITH + GARDNER 14 N. Boylan Avenue Raleigh, NC 27603 P (919) 828.0577, Ext. 128 F (919) 828.3899 C (919) 815-0813 Ming-Tai, Chao Environmental Engineer, Solid Waste Section Division of Waste Management North Carolina Department of Environmental Quality 919.707-8251 (Office) Ming.Chao@ncdenr.gov From:Chao, Ming-tai To:mike@smithgardnerinc.com Cc:Kirchner, Chuck; Drummond, Jaclynne; Stanley, Sherri; stacey@smithgardnerinc.com; David Pepper Subject:WI High Point C&DLF, Permit #4116-CDLF-2012 Date:Thursday, April 11, 2019 10:29:06 AM Hi Mike: The Permit to Construct (PTC) for Waste Industrious High Point C&DLF – Phase 3 (DIN26907) expired per Permit Condition No. 7, Part I Attachment 2 of the PTC, which was issued on January 09, 2017. The Solid Waste Section (SWS) have previously contacted you severaltimes about permit status and understood the beginning of Phase 3 construction will be in May 2019. The Smith Gardner, Inc., on behalf of the landfill permit holder, should submit anofficial request for an approval of the PTC - Phase 3 extension by this Friday, April 12, 2019. So the SWS may approve the extension of PTC - Phase 3 prior to the scheduled pre-construction meeting on April 17, 2019. Additionally, according to the phone conversations this Monday, Waste Industrious High Point Landfill, LLC (the landfill permit holder) plans to change the construction sequence ofPhase 3. Instead of construction the whole phase at one time, the Phase 3 will be constructed by two sub-phases –North Portion and South Portion at two different time. Construction of theNorth Portion will start in May 2019, and there is no definite time for constructing Southern Portion at this moment. To assist Smith Gardner, Inc., on behalf of the permit holder, tosubmit the SWS the proper documents for construction and operation of the planned Phase 3 of the C&DLF, the SWS suggests Smith Gardner, Inc. to revise/update the PTC Application –Phase 3 (DIN 27230 & 27231) to reflect the latest planning/decision made by the permit holder. Below are the plans in the application, but no limited to, that may be subject tomodify/update/revise: 1. Facility Plan – Phase 3 will be divided into two sub-phases; therefore, the gross capacity and waste footprint of each sub-phase should be described / tabulated. The Facility Plan Drawing (s) should be revised accordingly. This revision should change the approved total gross capacity of the C&DLF. 2. Engineering Plan - the temporary BMPs associated with the landfill construction and operation may be subjected to modification. Smith Gardner, Inc. should contact Land Quality Section for the any permit modification requirements. 3. Operations Plan/Manual – The waste filling sequences for phase 3 may need to be modified due to the phasing changes and the schedule for construction of South Portion of Phase 3. Operation Plan Drawing (s) should be modified accordingly. 4. Closure & Post-Closure Plan – the final/interim cover system and grades for the Northern Portion of Phase 3 should be added to the Closure Plan drawing(s). The cost estimates for the closure and post-closure should be modified to reflect the phasing change so the annual financial assurance (FA) can be calculated and adjusted by inflation factors. The FA should be revised according to the facility current status including the partial closure areas. 5. Water Quality Monitoring Plans. The revision of the monitoring plan is contingent on how soon the Southern Portion of the C&DLF will be constructed and operated. The SWS intends to demand the monitoring network be established in the areas that can provide detection of imminent groundwater contamination resulting from waste operations, even if the areas will be a future landfill cell/phase. Please submit the revised schedule of Phase 3 construction so that the SWS can decide if the modification of the existing monitoring network is necessary. The SWS recommends that Smith Gardner, Inc. submits the above-mentioned permit modification documents in a timely manner, so that the issuance of PTO for Phase 3 northernportion will not be delayed. Please contact myself if you have any questions of the requested permit modification. Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address)Green Square, 217 West Jones Street Raleigh, NC 27603Tel. 919-707-8251 ming.chao@ncdenr.govhttp://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute orother regulations. From: Chao, Ming-tai Sent: Wednesday, April 10, 2019 11:28 AM To: mike@smithgardnerinc.com Cc: Kirchner, Chuck; Drummond, Jaclynne; Stanley, Sherri Subject: RE: [External] WI High Point Hi Mike: Please also send the invitation to the following persons in the SWS: Kirchner, Chuck chuck.kirchner@ncdenr.gov Drummond, Jaclynne jaclynne.drummond@ncdenr.gov Stanley, Sherri Sherri.Stanley@ncdenr.gov Thanks. Ming -----Original Appointment----- From: mike@smithgardnerinc.com <mike@smithgardnerinc.com> Sent: Wednesday, April 10, 2019 11:22 AM To: 'Bryan Wuester'; 'Seth Heath'; 'David Pepper'; John Fearrington; Stacey Smith; 'Brady Johnson'; 'Brad Murray'; Chao, Ming-tai Cc: 'SCOTT FORD'; 'samantha.j.dailey@usace.army.mil' Subject: [External] WI High Point When: Wednesday, April 17, 2019 10:00 AM-12:00 PM (UTC-05:00) Eastern Time (US & Canada). Where: High Point C&D Landifll - Phase 3 Pre-Construction Meeting All, We will be having a pre-construction meeting for Phase 3 of the WI High Point C&D landfill Wednesday, April 17, 2019 at 10:00 am at the WI High Point C&D Landfill Office. If you have any questions or need any additional information please contact me at (919-815- 0813). Regards. Mike