Loading...
HomeMy WebLinkAbout87A_INSP_20190404NORTH CAROLINAD_E Q�� OepeNnenf of Envlronmmbl 0uel� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID X YW Transfer Compost SLAS COUNTY: SWAIN MSWLF PERMIT NO.: 87A-LCID- Closed HHW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF Tire T&P/ Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: 04/04/2019 FACILITY NAME AND ADDRESS: Swain County LCID Landfill 1484 Buckner Branch Rd Bryson City, NC 28713 Date of Last Inspection: 04/10/2018 GPS COORDINATES: N: 35.42618 ° W: 83.47759' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Scott Turpin, Solid Waste Director Telephone: 828-488-9719 Email address: sturpin@swaincountync.gov FACILITY CONTACT ADDRESS: Swain County Solid Waste Department PO Box 2321 Bryson City, NC 28713 PARTICIPANTS: Scott Turpin, Swain County Lee Hill, NCDEQ — Solid Waste Section STATUS OF PERMIT: Permit to Construct/Operate issued April 24, 2006 Permit Modification July 14, 2014 Permit Amendment September 6, 2016 Permit Expires December 2, 2021 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. Page 1 of 3 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management NORTH CAROLINA Solid Waste Section ADDITIONAL COMMENTS 1. All photos were taken by Lee Hill on April 5, 2019. 2. The facility is permitted to taken land clearing waste, yard trash, untreated and unpainted wood. 3. The permit and operations plan were available for review upon request. 4. The facility is secured by a metal gate and was locked upon arrival. 5. Signage is posted at the entrance to the facility showing the name, permit number, emergency contact information and the types of material that are accepted. 6. The access road is constructed of gravel and was in good condition. 7. No unapproved material was observed on the working face at the time of inspection. 8. The landfill appeared to be well compacted with adequate soil cover. Mr. Turpin stated that soil cover is applied monthly. 9. The kudzu treatment plan approved by the section on July 7, 2017 has worked to stop kudzu encroachment on the landfill. 10. The facility was well managed at the time of inspection. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Lee Hill ON: cn=Lee Hill, o=Solid Waste Section, ou=Field Operations O�C•��/ Branch, email=lee.hill@ncdenr.gov, c=US Date: 2019.04.08 09:52:27-04'00' Lee Hill Environmental Senior Specialist Regional Representative Phone: 828-296-4700 Sent on: April 8, 2019 to Scott X Email Hand delivery US Mail Certified No. 11 Turpin by: Copies: Deb Aja, Western District Supervisor - Solid Waste Section Kevin King, Swain County Manager Page 2 of 3 NORTH CAROLINAD_E Q�� OepeNnenf of Envlronmmbl 0w1� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Working Face Page 3 of 3