HomeMy WebLinkAbout2803_INSP_20190325FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Dare
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 2803-CDLF-1995
CDLF X Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: March 25, 2019 Date of Last Inspection: January 11, 2019
FACILITY NAME AND ADDRESS:
Dare County C&D Landfill 1603 Cub Road
Manns Harbor, 27953 GPS COORDINATES: N:35 °83498 E: - 75 °82002
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Shanna Fullmer, Dare County Public Works Director Telephone: 252-475-5844 (o) 252-423-0136 (c)
Email address: shanna@darenc.com FACILITY CONTACT ADDRESS:
Director Dare County Department of Public Works PO Box 1000
Manteo, NC 27954
PARTICIPANTS: Doug Huff – Dare County Solid Waste Superintendent Glen Bailey – Landfill Supervisor John College – NCDEQ-DWM-SWS-FOB
STATUS OF PERMIT:
Active, Life of Site Permit, Issued February 20, 2017. Combined with 2805T-Transfer-1996
PURPOSE OF SITE VISIT: Comprehensive Facility Compliance Inspection STATUS OF PAST NOTED VIOLATIONS: None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS: 01 - Facility has adequate signage at entrance. 02 - Locking gates and fencing is also present for security.
03 - Interior roads are made of all-weather materials and maintained well.
04 - The working face is being kept small for easier and faster cover. 05 - Facility has a large amount of cover material stockpiled on-site. Also at the working face also. 06 - Wind-blown trash issue is getting better. Continue efforts to keep wind-blown trash picked up daily. 07 - Groundwater wells are locked and tagged with correct information on tags. 08 - Cover records were available and reviewed. 09 - Incoming load tickets available and reviewed. Has required information. 10 - Inert Debris area looks good. 11 - Ground water sampling records for 2018 were available and reviewed. 12 - Screening records were available and reviewed.
13 - This facility has 4 Certified Landfill Operations Specialist: Glen C. Bailey, expires 10/19/2019, Deborah A. Equils, expires 6/21/2019, Thomas R. Tillett, expires 11/4/2019 and Ashley Walston, expires 5/24/2019. 14 - Update Contingency Plan to include Fire Occurrence. Send to DWM Engineer as amendment.
15 - Some Exposed C&D waste at several areas on the entrance of the cells. Cover with material to keep erosion from exposing any waste. 16 - Landfill Gas Monitoring wells locked and tagged. Records available.
17 - Several loads of incoming C&D waste were screened by John College after they were dumped and had been pushed across the working face. No non-conforming waste was detected. 18 - CFC is being removed by Dare County staff and records were available and reviewed. 19 - Concrete barriers have been placed and are being used for corner markers. All cells have them on both ends and are labeled with the cell number. 20 - Overall management of this facility is good and getting better all the time. 21 – Digital pictures were taken during this inspection with some attached to this report. Please contact me if you have any questions or concerns regarding this inspection report.
________________________________________ Phone: 919-268-1524 _ Email: john.college@ncdenr.gov Environmental Senior Specialist Regional Representative
Sent on: March 28, 2019 X Email Hand delivery US Mail Certified No. [ _]
Copies: * Andrew Hammonds, Eastern District Supervisor - Solid Waste Section
FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management
Solid Waste Section
Page 3 of 3
• Entrance Signage on Cub Road. Groundwater Well – Locked and Tagged.