Loading...
HomeMy WebLinkAboutCCB0070_Duke_Belews_INSP_20190319FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Stokes Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: CCB0070 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 3/19/2019 Date of Last Inspection: 2/22/2018 FACILITY NAME AND ADDRESS: Structural Fill (Equipment/material staging area and overflow parking lot) Duke Energy Corporation Belews Creek Steam Station Pine Hall Road Belews Creek, NC 27009 GPS COORDINATES: N: 36.28569 W: -80.06540 FACILITY CONTACT NAME AND PHONE NUMBER: Melonie Martin, Environmental Coordinator Office: 336-445-0610, Cell: 336-669-2994 E-mail: melonie.martin@duke-energy.com FACILITY CONTACT ADDRESS: Duke Energy Carolinas, LLC Belews Creek Steam Station 3195 Pine Hall Road Belews Creek, North Carolina 27009 PARTICIPANTS: Shawn McKee, NCDEQ Elizabeth Werner, NCDEQ David Giachini, NCDEQ Melanie Martin, Duke Energy Evan Andrews, Duke Energy Jeff Gateley, Duke Energy Michael Cowart, Duke Energy Henry Taylor, Duke Energy STATUS OF PERMIT: Not required - Coal Combustion By-products Structural Fill constructed per 15A NCAC 13B .1700 Solid Waste Rules PURPOSE OF SITE VISIT: Comprehensive inspection to ensure that the Structural Fill Facility is in compliance with 15A North Carolina Administration Code (NCAC) 13B. 1700, “Requirements For Beneficial Use Of Coal Combustion By-Products.” STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS None. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. The Duke Energy Corporation - Belews Creek Steam Station completed construction of a structural fill project in September 2009 located off of Pine Hall Road diagonally across from the Pine Hall Road Ash Landfill (85-03). 2. The structural fill is used for the intended purpose of a parking lot and equipment laydown yard in the event of large scale mobilizations per the expected beneficial end stated in the notification submitted to NCDENR. 3. Coal combustion by-products utilized on exterior slopes of the structural fill facility shall not have a slope greater than a 3:1 ratio as per 15A NCAC 13B .1705(l). 4. The facility shall be covered with a minimum of 12-inches compacted earth and an additional 6-inches of surface soil capable of supporting native vegetation as per 15A NCAC 13B .1705(j). 5. Final cover is being well maintained. Native vegetation is covering the side slopes of structural fill. The top of the fill is covered in compacted stone. No erosion or ponded water was observed during the inspection. Side slopes on the southeastern corner. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 7. Approximately 918,274 cubic yards of coal combustion by-products were utilized in the construction of the structural fill. 8. Per the requirements of 15A NCAC 13B .1707, the structural fill has been recorded on the property deed. 9. All of the cap system drains have been marked with signs to aid with locating them for cleaning and maintenance activities. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 919-707-8284 Environmental Senior Specialist Sent on: March 21, 2019 Email: X Hand delivery US Mail Certified No. [ _] Copies: Ed Mussler, Section Chief, Solid Waste Section Jason Watkins, Field Operations Branch Head, Solid Waste Section Larry Frost, Engineering Project Manager, Solid Waste Section Elizabeth Werner, Solid Waste Section Ben Jackson, Solid Waste Section David Giachini, Solid Waste Section