Loading...
HomeMy WebLinkAbout3802_INSP_20190305NORTH CAROLINAD_E Q�� OepeNnenf of Envlronmmbl 0uel� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer Compost SLAS COUNTY: GRAHAM MSWLF PERMIT NO.: 3802-MSWLF-1972 Closed X xxw White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF Tire T&P/ Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: 03/05/2019 FACILITY NAME AND ADDRESS: Fontana Village Resort Landfill Gold Branch Court Fontana Dam, NC 28733 Date of Last Inspection: 02/18/2016 GPS COORDINATES: N: 35.43866° W:-83.82049° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Meredith Jenkins Telephone: 828-498-2108 Email address: meredith.jerkins@fontanavillage.com FACILITY CONTACT ADDRESS: P.O. Box 68 Fontana Dam, NC 28733 PARTICIPANTS: Jeff Williams, Fontana Village Resort Lee Hill, NCDEQ — Solid Waste Section STATUS OF PERMIT: Closure Letter issued on March 31, 1993 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. Page 1 of 3 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management NORTH CAROLINA Solid Waste Section ADDITIONAL COMMENTS 1. All photos were taken by Lee Hill on March 5, 2019. 2. The entrance to the facility is secured by a locking cable; however, the post was recently damage by contract workers. Please repair the post so that the facility can be properly secured. 3. The cap of the landfill is being maintained and was last mowed in October 2018. A small amount of woody vegetation was observed on the cap. Please remove woody vegetation from the landfill cap. 4. Cessation of groundwater monitoring was approved by the Groundwater Compliance Unit on June 18, 2002. 5. All groundwater monitoring wells were observed to be locked and clear of vegetation. 6. The edge of waste markers delineating the perimeter of the landfill have been knocked down by the contract mowers. Reinstall the edge of waste markers around the perimeter of the landfill. 7. Repairs to the cap had been made to address ponding water issues that were observed during the February 18, 2016 inspection. The landfill cap now appears to have positive drainage. No additional areas of settlement were observed. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Lee Hill DN: cn=Lee Hill, o=Solid Waste / /f/f Section, ou=Field Operations /��/ Branch,email=lee.hill@ncdenr.gov, c=US Date: 2019.03.07 09:31:57-05'00' Lee Hill Environmental Senior Specialist Regional Representative Phone: 828-296-4700 Sent on: March 7, 2019 to X Email Hand delivery US Mail Certified No. fj Meredith Jenkins by: Copies: Deb Aja, Western District Supervisor - Solid Waste Section Page 2 of 3