HomeMy WebLinkAboutSDTF3107_PERMIT_RENEWAL_20181130 Facility Permit No.: SDTF-31-07 Register's Septic Tank Pumping Permit to Operate November 30, 2018 Page 2 of 3
CONDITIONS OF OPERATING PERMIT
1. This facility shall be maintained and operated in a manner that will protect the
assigned water quality standards of both surface and ground waters.
2. Leaks and spills are the responsibility of the Permittee and shall be immediately
contained, cleaned up, and treated to prevent any contamination of the surrounding
area. Any solids from leaks or spills shall be disposed of in a manner consistent with
the NC Solid Waste Management Rules.
3. The method for controlling odors described in the approved application for this
permit must effectively control all odors created by the operation of this facility as
required by 15A NCAC 13B .0841(g).
4. Erosion and runoff control measures shall be implemented to prevent migration of
soil or wastes off this facility. The installation of groundwater monitoring wells or a
leak detection system may be required at the discretion of the Division of Waste
Management.
5. This permit shall not affect the applicability of any statutes, rules, regulations, or
ordinances that may be imposed by other local, state, or federal government
agencies that may have jurisdiction over this facility.
6. This permit may be modified or reissued at any time to incorporate any conditions,
limitations, and/or monitoring requirements the Division deems necessary to
adequately protect the environment and public health.
7. This facility consists of one (1) above ground 5,000-gallon steel tank for the storage
of domestic septage, grease trap pumpings, and portable toilet waste. Storage or
treatment of any liquid or solid wastes other than those specified in the approved
application for this permit is prohibited.
8. No one other than the Permittee or an employee of the firm named in this permit
may discharge septage at this detention facility unless the Division is notified and
approval is granted by the Division. Only Septage Management Firms permitted to
operate in North Carolina may receive authorizations to discharge at this facility.
Facility Permit No.: SDTF-31-07 Register's Septic Tank Pumping Permit to Operate November 30, 2018 Page 3 of 3
9. This permit shall expire on November 30, 2023. Renewal or modification of this
permit shall be in accordance with 15A NCAC 13B .0836 (j), (n), or (r). An application
for permit renewal shall be submitted at least ninety (90) days prior to the permit
renewal date.
10. Records shall be maintained in accordance with the Septage Management Rules.
These records shall be made available to a representative of the Division upon
request.
11. Any duly authorized officer, employee, or representative of the Division may, upon
presentation of credentials, enter and inspect any property, premises, or place on or
related to the facility, at any reasonable time for the purpose of determining
compliance with this permit; may inspect or copy any records that must be kept
under the conditions of this permit; or may obtain samples of groundwater, surface
water, or leachate.
12. The setbacks prescribed by 15A NCAC 13B .0841(m) shall be maintained at all times.
k
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GISUser Community
Aerial Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and theGIS User Community. Map created by NC DEQ, Division of Waste Management, for permitting purposes only.
crc, 20181126
SDTF-31-07
-
1 in = 200 ft