Loading...
HomeMy WebLinkAbout4101_Guilford_CityHighPoint_Riverdale_MSWLF_CA_FID1285123_20190225SEABOARD GROUP II AND THE CITY OF HIGH POINT February 25, 2019 Mr. Joe Ghiold, Project Manager North Carolina Department of Environmental Quality Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Re: Quarterly Remedial Action Progress Report, 4th Quarter 2018 Former Seaboard Chemical and Riverdale Drive Landfill Site Jamestown, Guilford County, North Carolina Dear Mr. Ghiold: The Seaboard Group II and the City of High Point (Parties) are providing this 4th Quarter 2018 Remedial Action Progress Report for the former Seaboard Chemical Corporation facility and closed Riverdale Drive Landfill located in Jamestown, NC (Site). During the fourth quarter of 2018, the mechanical and phytoremediation treatment systems processed 2,250,383 gallons of extracted groundwater and leachate. Also during the fourth quarter of 2018, the following shutdowns exceeding one day in duration occurred: Date Duration Reason for Shutdown October 12, 2018 2.5 days Power loss due to Hurricane Michael October 18, 2018 3.5 days Communication issue at LS-1 October 26, 2018 2.5 days Communication issue at LS-1 November 4, 2018 1.0 days Power loss November 10, 2018 2.0 days Unknown — likely communication issue December 4, 2018 8.0 days Fiber optic cable replacement from LS-1 December 14, 2018 2.5 days MV-420-A control valve fault December 21, 2018 6.0 days Unknown — likely communication issue December 28, 2018 3.0 days Unknown — likely communication issue When Hurricane Michael moved through the area in mid -October, the storm resulted in damage to communication components which are still impacting system operations. The fiber optics cable which provides communications from LS-1 to the primary treatment building was replaced during the shutdown in early December 2018. Further modifications to upgrade and streamline the control systems are currently under evaluation. The attached tables provide the results of the full scale operation of the treatment system during the fourth quarter of 2018, including: Operating Data, Process Flow Data, Static Water Level Data, System Chemistry, Utility Data Use, and Contaminant Removal Efficiency. Summary The effects of Hurricane Michael resulted in damage to several communication system components. The fiber optic cable from LS-1 to the treatment building has been replaced. In addition, hardware and software modifications are being evaluated to further reduce or eliminate future communication issues. Please contact Mr. Gary D. Babb, P.G. (919/605-4719) or Craig Coslett (610/435-1151) if there are any questions or comments. Please direct correspondence related to this matter to: Mr. Craig Coslett de maximis, inc. 1550 Pond Road, Suite 120 Allentown, PA 18104 Communications via electronic mail should be directed to gdbabb@gmail.com and ccoslett@demaximis.com. Respectfully, Seaboard Group II and City of High Point Gary D. Babb, P.G. President Cc: Dave Nutt, Esq. - Seaboard Trustee Steve Anastos - Seaboard Trustee Ed Gunderson - Seaboard Group Technical Committee Craig Coslett — Project Oversight Coordinator Terry Houk - City of High Point Trustee Amos Dawson, Seaboard Group II Counsel Jackie Drummond - NCDEQ Division of Solid Waste SEABOARD GROUP II & THE CITY OF HIGH POINT QUARTERLY LOG -Q42018 Quarterly Units of INITIAL WEEK WEEK WEEK WEEK WEEKS WEEK WEEK WEEKS WEEK WEEK 10 WEEK 11 WEEK 12 WEEK 13 Totals Measure METER READING LEACHATE (GALLONS) 5,387,950 5,517,241 5,597,960 5,651,869 5,741,438 5,868,337 5,981,636 6,111,751 6,222,812 6,366,139 6,366,139 6,408,414 6,428,910 6,432,923 1,044,973 GALLONS LSl-RWs (GALLONS) 1,343,837 1,383,154 1,406,190 1,423,891 1,452,514 1,482,607 1,510,090 1,514,294 1,543,309 1,556,670 1,556,670 1,566,566 1,568,477 1,568,851 225,014 GALLONS PWDR) (GALLONS) 7,724,977 7,825,435 7,882,912 7,939,181 7,999,585 8,092,581 8,165,750 8,264,184 8,378,468 8,496,736 8,496,736 8,520,178 8,537,090 8,540,402 815,425 GALLONS SIS-RWs (GALLONS) 762,277 778,216 786,445 790,127 793,908 813,266 827,993 843,969 868,694 892,658 892,658 898,294 901,721 902,392 140,115 GALLONS PHYTO DISCH. (GALLONS) 5,799,891 6,087,773 6,256,190 6,391,693 6,573,691 6,846,560 7,075,460 7,323,831 7,612,489 7,915,410 7,915,410 7,998,475 8,041,793 8,050,274 2,250,383 GALLONS AIR STRIP. RUNTIME (HRS) 9,490 9,621 9,700 9,771 9,863 9,981 397 523 675 837 837 869 892 915 1,122 51.4% LSl COMP RUN (HOURS) 10,470 10,600 10,690 10,760 10,860 10,980 11,080 11,210 11,360 11,530 11,530 11,530 11,530 11,530 1,060 HOURS LSl COMP LOAD (HOURS) 1,020 1,051 1,069 1,079 1,095 1,120 1,137 1,151 1,169 1,198 1,198 1,198 1,198 1,198 178 HOURS LS2 COMP RUN (HOURS) 10,500 10,620 10,690 10,740 10,830 10,930 11,010 11,080 11,220 11,370 11,370 11,400 11,421 11,426 926 HOURS LS2 COMP LOAD (HOURS) 1,136 1,144 1,148 1,151 1,153 1,163 1,171 1,178 1,191 1,205 1,205 1,208 1,210 1,210 74 HOURS ELECT. UPPER (kW-Hr) 9,797 9,829 9,860 9,898 9,956 10,020 10,086 10,171 10,261 10,349 10,428 10,506 10,519 10,521 724 KW-HR WATER METER (CF) 410,121 410,475 410,715 410,753 410,796 411,004 411,082 411,278 411,393 411,644 411,862 412,080 412,116 412,123 7,786 GALLONS BACKWASH PUMP (GAL.) 203,858 205,687 206,599 206,599 206,599 207,516 207,516 208,426 208,426 209,338 209,338 210,246 210,376 210,402 1,976 GALLONS IRRIGATION ZONES (GALLONS): ZONE 1 547,641 567,951 579,932 589,422 602,078 622,346 639,916 659,042 681,952 704,799 704,799 711,206 714,473 715,113 167,472 GALLONS ZONE 2 513,761 533,441 545,056 554,429 566,768 587,066 604,428 623,165 645,249 667,410 667,410 673,741 676,910 677,531 163,770 GALLONS ZONE 3 534,813 555,483 567,883 576,226 589,314 610,946 629,528 648,619 670,970 692,461 692,461 698,503 701,576 702,178 167,365 GALLONS ZONE 525,054 543,451 554,500 563,191 574,465 592,553 608,671 625,693 645,317 664,704 664,704 669,144 671,916 672,459 147,405 GALLONS ZONE 5 565,108 585,004 597,294 607,028 619,147 640,044 658,193 677,564 700,203 722,350 722,350 727,594 730,761 731,381 166,273 GALLONS ZONE 6 563,410 583,449 595,226 605,974 617,497 638,989 657,616 676,970 700,448 723,086 723,086 728,533 731,770 732,404 168,994 GALLONS ZONE 7 546,701 567,938 579,520 589,236 602,636 624,207 641,794 662,290 684,600 707,365 707,365 713,382 716,637 717,275 170,574 GALLONS ZONE 8 578,222 599,256 611,049 621,238 635,450 657,047 675,335 696,667 720,529 744,218 744,218 750,565 753,953 754,616 176,394 GALLONS ZONE 9 557,001 578,195 589,744 599,723 612,889 634,401 652,870 673,670 696,749 720,386 720,386 725,840 729,220 729,882 172,881 GALLONS ZONE 10 591,590 613,331 625,497 635,938 649,480 671,844 691,170 712,917 735,441 759,790 759,790 766,411 769,893 770,575 178,985 GALLONS ZONE 11 224,524 233,848 239,951 245,298 250,579 260,323 269,372 279,060 290,446 302,341 302,341 305,488 307,189 307,522 82,998 GALLONS ZONE 12 459,442 479,868 491,343 500,841 513,577 534,129 552,110 571,985 594,359 616,484 616,484 622,704 625,868 626,487 167,045 IGALLONS ZONE 13 387,845 407,923 415,011 424,212 436,097 453,590 464,904 477,081 490,976 505,747 505,747 508,981 511,093 511,507 123,662 GALLONS ZONE 14 502,770 520,080 531,012 539,689 551,162 551,162 551,162 551,162 551,162 563,320 563,320 567,499 569,238 569,578 66,808 GALLONS ZONE 15 283,514 283,514 290,735 290,735 290,735 290,735 290,735 290,735 290,735 290,735 290,735 291,675 291,675 291,675 8,161 GALLONS DAILYAVERAGE Average Units AVERAGE RUNTIME 78% 47% 42% 55% 70% 67% 75% 91% 96% 0% 19% 14% 3% 51% % AVERAGE FLOW (GPM) 28.6 16.7 13.4 18.1 27.1 22.7 24.6 28.6 30.1 0.0 8.2 4.3 0.8 17.2 GPM EFF. DISCH. (GALLONS) 41,126 24,060 19,358 26,000 38,981 32,700 35,482 41,237 43,274 11,866 6,188 1,212 24,729 GPD TOTAL INFLUENT (GALLONS) 40,715 24,209 18,794 26,054 38,478 32,668 35,533 39,869 42,703 11,607 6,107 1,196 24,456 GPD INF. LEACHATE (GALLONS) 18,470 11,531 7,701 12,796 18,128 16,186 18,588 15,866 20,475 6,039 2,928 573 11,483 GPD INF. LS1-RWs (GALLONS) 5,617 3,291 2,529 4,089 4,299 3,926 601 4,145 1,909 1,414 273 53 2,473 GPD INF. PWDR) (GALLONS) 14,351 8,211 8,038 8,629 13,285 10,453 14,062 16,326 16,895 3,349 2,416 473 8,961 GPD INF. SIS-RWs(GALLONS) 2,277 1,176 526 540 2,765 2,104 2,282 3,532 3,423 805 490 96 1,540 GPD WEEKLY RUNTIME (DAYS) 5.5 3.3 2.9 3.9 4.9 4.7 5.2 6.3 6.7 1.4 1.0 0.2 3.5 DAYS/WK LSl COMP RUN (HOURS) 18.6 12.9 10.0 14.3 17.1 14.3 18.6 21.4 24.3 3.5 0.7 12.0 HRS/DAY LSl COMP LOAD (HOURS) 4.4 2.6 1.4 2.3 3.6 2.4 2.0 2.6 4.1 0.6 0.1 2.0 HRS/DAY LS2 COMP RUN (HOURS) 17.1 10.0 7.1 12.9 14.3 11.4 10.0 20.0 21.4 4.3 3.1 0.6 10.2 HRS/DAY LS2 COMP LOAD (HOURS) 1.1 0.6 0.4 0.3 1.4 1.1 1.0 1.9 2.0 0.4 0.3 0.1 0.8 HRS/DAY ELECTRICITY(kW-Hr) 4.6 4.4 5.4 8.3 9.1 9.4 12.1 12.9 12.6 11.2 11.2 1.8 0.4 8.0 kW-HR/DAY CITY WATER (GALLONS) 50.6 34.3 5.4 6.1 30 11 28 16 36 31 31 5 1 22 GPD BACKWASH PUMP (GAL.) 261.3 130.3 131 130 130 130 19 4 72 GPD EFFLUENT LABS Fe (mg/L) 0.93 0.63 5.26 1.07 0.45 1.42 2.76 2.05 1.8 1.7 1.59 1.9 mg/L pH 6.5 6.45 6.49 7.1 6.96 6.75 6.72 7.01 6.9 6.53 7.07 6.8 m/L ORP 179 60 174 125 57 67 49 104 55 63 78 83 mV COND 1,109 1,142 1162 1288 1251 1114 1220 1,177 1,061 1,122 1,262 1,180 us/cm TDS (mg/L) 771.2 789.6 815.6 913.6 883.6 780.7 861.2 832 745 788 895 830 mg/L TSS (mg/L) 11 6 16 0 0 6 23 7 14 7.2 mg/L COD (mg/L) 68 78 78 90 79 69 107 85 68 79 116 85 mg/L WELL LEVELS Average Change OWDR-4 682.16 676.19 678.91 677.20 677.54 678.38 680.83 676.64 677.34 677.12 678.27 677.8 (7.08) OWDR-2 681.90 675.83 678.51 676.92 677.21 678.08 680.56 676.28 677.01 676.77 678.04 677.5 (9.25) PWDR-1 689.23 658.87 658.72 662.72 662.57 661.72 669.02 657.79 659.28 658.98 660.83 661.1 (33.70) OWDR-3 681.80 681.67 682.02 681.72 682.70 682.83 682.83 683.30 682.4 (0.54) PW-6D (696.79) 680.37 #DIV/Ol OWLFS-2 680.00 #DIV/Ol PW-16D 680.52 678.86 680.67 679.8 (3.69) PW-15D 683.12 681.80 683.62 682.7 ESTIMATED LAKE LEVEL 682.3 682.3 682.3 682.3 682.3 682.7 685.0 682.4 682.4 682.3 682.4 683.0 682.50 682.55 682.6 SOURCE WATER PWDR-1 YES YES YES YES YES YES YES YES YES YES no YES YES no LEACHATE(LCHT) YES YES YES YES YES YES YES YES YES YES no YES YES no LS-1 RECOVERY WELLS YES YESI YESI YES YESI YESI YESI YES YES YES no YES YES no SIS RECOVERY WELLS YES YES YES YES YES YES YES YES YES YES no YES YESI no 50000 45000 40000 35000 z 0 Q 30000 O 25000 LL Q o W c7 20000 W G 15000 10000 5000 0 SEABOARD Q4 2018 8 7 6 5 —■ INF. LEACHATE (GALLONS) 4 —4 INF. LS1-RWs (GALLONS) INF. PWDR1 (GALLONS) --)*--INF. SIS-RWs (GALLONS) 3 EFF. DISCH. (GALLONS) WEEKLY RUNTIME (DAYS) 1 0 All EL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WEEK 695.00 685.00 680.00 J W W J J J W 3: 675.00 670.00 665.00 SEABOARD Q4 2018 0 1 2 3 4 5 6 7 8 9 10 11 12 13 WEEK tOWDR-4 fOWDR-2 PWDR-1 -+(-OWDR-3 -I- PW-6D (696.79) -40--OWLFS-2 PW-16D PW-15D ESTIMATED LAKE LEVEL 25 20 5 I SEABOARD Q4 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 WEEK 1,400 1,200 1,000 O—Fe (mg/L) 800 U o pH p TSS (mg/L) Z U ORP 600 a --)K--COND tTDS (mg/L) COD (mg/L) 400 w 25.0 kn 20.0 W a c� W a 0 15.0 cr O Ln IA W a all SEABOARD Q4 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 WEEK 14.0 12.0 10.0 U7 a W a J 8.0 0 LS1 COMP RUN (HOURS) z O LS1 COMP LOAD (HOURS) i= a LS2 COMP RUN (HOURS) 6.0 N z --X— LS2 COMP LOAD (HOURS) oc --)K- ELECTRICITY (kW-Hr) W 4.0 a PAII, Water Treatment System Dioxane Chlorinated ethenes Chlorinated ethanes Other organics Total Mass kg kg kg kg k Step 1 Influent 5.9 15.3 7.7 8.8 37.7 Mechanical Effluent 6.7 0.23 0.12 0.31 7.36 Treatment System % Contaminant Removal < 98.5 98.4 96.5 80.5 Irrigation water 9 9 9 9 9 6,700 230 120 310 7,360 Drainage water* 410 ND ND ND 410 Lys 2 (vol. scaling factor, 232) Lys 7 (vol. scaling factor, 244) 685 ND ND ND 685 Step 2 Lys 8 (vol. scaling factor, 332) 37 ND ND ND 37 Phyto ation Lys 10 (vol. scalingfactor,306) 498 ND ND ND 498 Syystemstem Lys 11B (vol. scaling factor, 675) 2,303 ND ND ND 2,303 Lys 12 (vol. scaling factor, 155) 651 ND ND ND 651 Lys 13 (vol. scaling factor, 242) 2,929 ND ND 15.2 2,944 Averse (n=7) 1,073 ND ND 2.2 1,075 Step 2 % Contaminant Removal 84.0% 100% 100% 99.3% 85.3% Overall Percent Contaminant Removal 81.8% 100% 100% 99.97% 97.1%