Loading...
HomeMy WebLinkAbout6301_Moore_CDLF_MSWLF_WellAbandonment_FID1284993_20190220G GOLDER February 20, 2019 Jaclynne Drummond, Hydrogeologist Solid Waste Section, Division of Waste Management North Carolina Department of Environmental Quality 2090 US Highway 70 Swannanoa, NC 28778 REQUEST TO DECOMMISION MONITORING WELLS MW-16S AND MW-16D MOORE COUNTY LANDFILL, NC SWP#63-01 Dear Jackie, 0739615018 On behalf of Moore County, NC (the County), Golder Associates NC, Inc. (Golder) has prepared this request to abandon monitoring wells MW-16S and MW-16D, which are currently part of the compliance monitoring network at the Moore County Landfill in Aberdeen, NC. The monitoring well pair MW-16S/D is located within the footprint of the next proposed horizontal expansion of the construction and demolition (C&D) landfill as shown on the attached Figure 1 and was last sampled in December 2018 as part of the routine monitoring at the facility. As previously discussed with NC Department of Environmental Quality (NC DEQ), Golder is currently preparing an application for permit to construct the next horizontal expansion (Cell VI). As part of this process the County has already installed a replacement for this well pair (i.e., MW-17S and MW-17D) outside of the proposed Cell VI limits of waste. The County is currently using the area surrounding the monitoring well pair MW-16S/D as a borrow area. As the County removes more soils from this area, there is a concern that the monitoring well integrity will be compromised potentially creating a pathway for surficial impacts during construction to reach the water table. Due to these site activities the County would like to request permission to properly decommission the monitoring well pair MW-16S/D and replace them within the compliance monitoring network with the recently installed MW-17S/D during future monitoring events. If you have any questions regarding this request, please contact the undersigned at (336) 852-4903. Golder Associates NC, Inc. 5B Oak Branch Drive Greensboro, North Carolina, USA 27407 T: +1 336 852-4903 +1 336 852-4904 Golder and the G logo are trademarks of Golder Associates Corporation golder.com Jaclynne Drummond, Hydrogeologist 0739615018 Solid Waste Section, Division of Waste Management February 20, 2019 Sincerely, Golder Associates NC, Inc. Benjamin S. Draper, PG, PMP Senior Project Geologist BSD/RPK/bsd - aec�� 0� Rachel P. Kirkman, PG Associate and Senior Consultant CC: Chad Beane, Solid Waste and Recycling Division Manager, Moore County Attachments: Figure 1 — Groundwater Surface Contour Map — June 20, 2018 g:lprojecWmoore county\0739615018 - moore -env services1p300 -general consultingVequest to abandon mw-16s-d\2019-02-19 abandonment requesl.docx 4 GOLDER 2 LEGEND DENSE VECETATI N U 8. 3 DEN96 VEC ATION DENSE VEGETATION pp DENSE VEGETATION M / Q j ENSE VE' 7.. 113W-2 1 , ' % POND / usE VEGETATIONSB � � ,,, � W. 403,6 i �\ � \ t EOSTATIO \ \ \\ IE V STATION SB-3_0o _ — G �•Wj MW-15 l� D _ \ v O MW-11SR s° j ° MW-15R � r 71. 22 I i--=�G / 7398.38 ._„ WOW GROUND OBSCURED — _ �� 0000 2 26 SEE ACCURACY NOTE \ ieu /MW-11S 000 � J r-\MW- 0 10 � � 4 3 2 1 ,-_ �- \ � :o 00 v c� s/ o 1 MW-11 D� t� / �/ OO 'r°°' / I .xis ` O 000 : , A 0 \\ \ . n.o 0 // A /j 1 O 0 I O 0 000 —� GP- - "`3 a 1 \ \ 18 1 2 2 2�, 24 A1^y1 490 SW-4 GP-15 as � � •ifs I ` \ 361 01 % I MW-14 CLOSED � ,S.TB 1 ' o0383.92' ` \ ,o U i GP-15R � � V � ACTIVE o �mSw -PZ-1 C8 �� °° LANDFILL O 37267.72 �� 0 ,.L ANDFIkL � , a� cr;Jeni +sw� I p GROUND OBSCURED SEE ACCURACY NOTE — STREAM, POND, AND WETLAND LIMITS EXISTING 10 FT GROUND SURFACE CONTOUR EXISTING 2 FT GROUND SURFACE CONTOUR PROPERTY LINE APPROXIMATE LIMITS OF WASTE EXISTING ROAD POTENTIOMETRIC GROUNDWATER CONTOURS (5 FT. INTERVAL) _ GROUNDWATER FLOW SEGMENTS MW-1 0 382.91385 MONITORING WELL AND IDENTIFICATION GP-100- METHANE PROBE AND IDENTIFICATION ❑ SW-1 SURFACE WATER MONITORING POINT AND IDENTIFICATION LANDFILL GAS TRENCH VENTS AND IDENTIFICATION \ PASSIVE LANDFILL GAS VENTS 0 PW-1 PRIVATE WELL LOCATION AND IDENTIFICATION +l% WETLAND AREA SB-2 SOIL SAMPLE LOCATIONS PZ-2 PIEZOMETERS NOTES MW-16S\ - —_ MW-7 368.10\ _,3 V3$6.741 F = �,D 1p � 'I",, z I � ` / - 0 1 ` 1 1. TOPOGRAPHIC CONTOUR INTERVAL 2 FEET MW-17S� A� 363.95 M ,- -1 ;D �367.96 \ ` 40 13 o ly 2. GROUNDWATER SURFACE CONTOUR INTERVAL = 5 FEET MW-17D \ iavz P-141 C I ` o o 3. GROUNDWATER ELEVATIONS MEASURED ON NOVEMBER 27, 2018. GP-14R_, �� 0 0 00 \ \ 4. GROUNDWATER CONTOURS BASED ON LINEAR INTERPOLATION BETWEEN AND -0-PZ-2 \ ` i' 7 vIW-1 8 © EXTRAPOLATION FROM KNOWN DATA, TOPOGRAPHIC CONTOURS, AND KNOWN FIELD 367.36,— NW-1 GROUNDWATER CONTOURS MAY NOT REFLECT ACTUAL 4jr74.82J ./ '���\� _ �� 0 0 ° CONDITIONS. THEREFORE �. CONDITIONS. v s 3B° / -- FS \ 5. GROUNDWATER CONTOUR LINES SHOW THE WATER TABLE SHAPE AND ELEVATION. THESE 1 P� "0 PZ73 � 368.---\ O CONTOURS ARE INFERRED LINES FOLLOWING THE GROUNDWATER SURFACE AT A GP-13R �� \ MW_g ` CONSTANT ELEVATION ABOVE SEA LEVEL. THE GROUNDWATER FLOW DIRECTION IS ^! � ,F • \384.29 "" GENERALLY PERPENDICULAR TO THE GROUNDWATER SURFACE CONTOURS, SIMILAR TO THE / ` RELATIONSHIP BETWEEN SURFACE WATER FLOW AND TOPOGRAPHIC CONTOURS. MW-18 — ^) / 353.59 y'cN3E V. 6 PROPERTY BOUNDARY SURVEY BY JAMES L. S RELATIVE TO TOPOGRAPHY APPROXIMATE BY IDATEDGHT HDR ENGINNOVEMBER 1984. ITS LOCATION ENGINEERING, NC. 7 EXISTING TOPOGRAPHY WITHIN ACTIVE AND PROPOSED LANDFILL PROVIDED BY MATTHEWS e SITE LOCATION MAP NOT TO SCALE ,o _ ` \ 10 ` _ — _ �/ \ �� \ _ c— LAND SURVEYING & MAPPING, PLLC DATED APRIL 17, 2015 AND JUNE 2018. • 3 � \� y � GP-12 DENSE VSO— —.. \� DEG � w ❑ S W-3 i (a68. 8_ l ® � sA B-2�1 8. MONITORING WELLS MW-1 THROUGH MW-5 SURVEYED JUNE 1987 BY S&ME, INC. MONITORING +o . / \ c WELLS MW-6 THROUGH MW-16 SURVEYED APRIL 1995, SEPTEMBER 1996, AND APRIL 2003 BY �03 3.75 % \ HDR ENGINEERING INC./ ED BUCKNER RLS APRIL 17, 2015. 9. THE LOCATIONS OF LANDFILL GAS TRENCH VENTS ARE APPROXIMATE. I 10. GROUNDWATER WELLS MW-11 D, MW-13D, AND MW-16D ARE NOT SCREENED IN THE SHALLOW AQUIFER AND ELEVATION DATA WERE NOT USED IN THE CONSTRUCTION OF GROUNDWATER c CONTOURS. 11. A STREAM DETERMINATION WAS CONDUCTED ON APRIL 17, 2013 BY A GOLDER ASSOCIATES NC, INC. REPRESENTATIVE. THE STREAM DETERMINATION WAS CONDUCTED USING NCDWQ'S 382.91,/� ENEE V— O "METHODOLOGY FOR IDENTIFICATION OF INTERMITTENT AND PERENNIAL STREAMS AND L THEIR ORIGINGS, VERSION 4.11ul ". \ /6 1Sw 1 Ej� Ul A4, / DEN V ATIONClo o CLIENT MOORE COUNTY 0 200 400 SCALE FEET PROJECT MOORE COUNTY LANDFILL PERMIT NO. 63-01 ABERDEEN, NORTH CAROLINA CONSULTANT YYYY-MM-DD 2019-02-14 TITLE PG C-399 GROUNDWATER SURFACE CONTOUR MAP PREPARED KFL NOVEMBER 27, 2018 GO L D E R DESIGN ALM REVIEW BSD PROJECT Rev. GOLDER ASSOCIATES NC, INC. APPROVED RPK 0739615018 200 0 DRAWING 1 0