Loading...
HomeMy WebLinkAbout22065_ATCO Rubber Products_OAR_20150728ECS Carolinas, LLP 4811 Koger Boulevard Greensboro, NC 27407 (336) 856-7150 [Phone] (336) 856-7160 [Fax] M NC Registered Engineering Firm # F-1078 July 28, 2015 JE Capital. LLC 3031 Pleasant Ridge Road Summerfield, NC 27358 ATTN: Mr. Eddie Krusch We are enclosing: X Materials Engineering Division Reports X For your use X As requested ENCL: LETTER OF TRANSMITTAL RE: ATCO Property ECS Job # 09:25395 Permits: Location: 2806 Patterson Street Greensboro, NC Field Report # 1 07/24/2015 Soil Densities Stlott rUd- Do 11 Branch Manager Alan L. Raulston CMT Project Manager This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Carolinas, LLP Ef!e4811 Koger Boulevard Greensboro, NC 27407 (336) 856-7150 [Phone] FIELD REPORT (336) 856-7160 [Fax] Project No. 09:25395 Report No. 1 Project ATCO Property Day & Date Friday 07/24/2015 Location Greensboro, NC Weather 85°/ Sunny Client JE Capital. LLC - Eddie Krusch On -Site Time 2.00 Lab Time 0.25 Travel Time* 0.75 Total 3.00 Remarks Soil Densities Re Obs.Time 0.00 Trip Charges* Tolls/Parking* Mileage* 20 Times of Arrival Departure Chargeable Items 12:30P 12:45P 01:45P 02:15P 03:30P 04:45P * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the placement and compaction of soils for the tank removal area. Utilizing the nuclear test method, ASTM D-2937, to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the standard proctor method. Locations and elevations of all tests are based on stakeout provided by others. The soils observed on this date, while on site, appeared to be placed in accordance with project drawings and specifications with regard to lift thickness and moisture content. By Derek P. Stroud 1700 723862 E ECS CAROLINAS, LLP Field Compaction Summary, ASTM D6938 Project No: 25395 Project Name: ATCO Property Client: JE Capital. LLC Contractor: None Listed Technician: Derek P. Stroud Test Method ASTM D6938 Nuclear Gauge No.2 Make Troxler Density Std 2155 Model 3430 Moisture Std 665 Ser. No. 31470 Page 1 Date: 07/24/15 Sample No. Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MC D4S-1 A-1 Sandrock Standard Proctor 126.80 10.60 Corrected Corrected Test Data Wet Dry Moisture Percent Probe Maximum Optimum O P Test Test Depth Station / Lift / % Dry Moisture Density Density Content Comp. P / F Comments No. Mode (in.) Location Elev Sample No. p Oversize Density Content (pcf) (pcf) (Pcfl (%) 1 DT 6 Backfill old tank area 10' S of N side -4 D4S-1 0.00 126.80 10.60 138.1 125.3 10.2 98.8 P 2 DT 6 5' S of N side -2 D4S-1 0.00 126.80 10.60 137.9 122.8 12.2 96.8 P 3 DT 6 15' S of N side -1 D4S-1 0.00 126.80 10.60 136.4 120.9 12.9 95.3 P 4 DT 6 10' S of N side 0 D4S-1 0.00 126.80 10.60 137.1 122.7 11.7 96.8 P Test Mode: DT = Direct Transmission BS = Back Scatter WO:272337