HomeMy WebLinkAbout4501_Henderson_MSWLF_LFG_FID1280882_20190218GOLDER
February 18, 2019
Ms. Jaclynne Drummond, Hydrogeologist
North Carolina Department of Environmental Quality
Division of Waste Management - Solid Waste Section
2090 US Highway 70
Swannanoa, North Carolina 28778
828-296-4706
METHANE MONITORING RESULTS — FIRST QUARTERLY EVENT OF 2019
CLOSED HENDERSON COUNTY LANDFILL, PERMIT NO. 45-01
HENDERSON COUNTY, NORTH CAROLINA
Dear Jackie,
Project No. 0839650618.203
Attached are the results from the February 11, 2019, first quarterly methane monitoring event conducted at
the above -referenced facility. As shown on the attached Boundary Gas Probe Monitoring Log, methane was
not detected above the lower explosive limit (LEL) in any compliance methane monitoring points during the
event. Methane was detected above the LEL at assessment methane monitoring well TR-2.
No methane was detected in the facility structures during this compliance monitoring event. If you have any
questions or concerns, please contact us at 336-852-4903.
Sincerely,
Golder Associates NC, Inc.
a;;�// 0
4
David "Dusty" Y. Reedy II, PG
Senior Hydrogeologist
Golder Associates NC, Inc.
5B Oak Branch Drive, Greensboro, North Carolina, USA 27407
Engineering Lic. No. C-2862/Geology Lic. No. C-399
Rachel P. Kirkman, PG
Associate and Senior Consultant
T: +1 336 852-4903 F: +1 336 852-4904
Golder Associates NC, Inc. is a licensed user of the Golder trademark, and an associated operating entity.
Golder and the G logo are trademarks of Golder Associates Corporation.
golder.com
Ms. Jaclynne Drummond, Hydrogeologist
North Carolina Department of Environmental Quality
Project No. 0839650618.203
February 18, 2019
CC: Marcus Jones, PE, Director of Engineering, Henderson County, 1 Historic
Courthouse Square, Suite 6, Hendersonville, NC 28792. 828-694-6560.
majones@hendersoncountync.org
Greg Wiggins, Operations Manager, Henderson County, 191 Transfer
Station Drive, Hendersonville, North Carolina 28791. 828-694-7982.
gwiggins@hendersoncountync.org
Attachments: Boundary Gas Probe Monitoring Log —February 11, 2019
Cut-off Trench LFG Vent Monitoring Log — February 11, 2019
Methane Monitoring Location Map
Calibration Record
gAprojectslhenderson county\0839650618\phase 203 - 1st qtr Ifg 2019MID deliverables\252 final issued\0839650618.202-001-r-rev0-
Ifg_rpt_nov_2018. docx
4 GOLDER
BOUNDARY PROBE MONITORING LOG
Project Name: Henderson County Landfill
Site Contact: Greg Wiggins
Starting Temperature: 59° F
Starting Barometric Pressure: 30.11 in Hg
Monitoring Equipment: GEM 2000 Plus
Date: 02/11 /19
Project Number:
0839650618.203
Technician(s):
Erik Vasko
End Temperature:
65° F
End Barometric Pressure: 30.02 in
Monitoring
Location
Time
Time Pumped
sec
(sec)
%Methane
CH
( a)
Carbon
Dioxide
(CO2)
%Oxygen
(02)
%Balance
Gas
Initial
°
/° LEL
Stabalized
°
/° LEL
Hydrogen
Sulfide
(HZS, ppm)
Monitoring Point Status
g
MP-1
13:23
60
0.0
4.7
16.0
79.3
0
0
0.0
MSW Compliance Well
MP-3
13:36
60
0.0
4.5
11.9
83.6
0
0
0.0
MSW Compliance Well
MP-4
13:40
60
0.0
3.5
15.3
81.2
0
0
0.0
MSW Compliance Well
MP-7
14:27
60
0.0
7.4
9.4
83.2
0
0
0.0
MSW Compliance Well
MP-8
14:14
60
0.0
2.8
16.6
80.6
0
0
0.0
MSW Compliance Well
MP-9
14:09
60
0.0
2.7
17.5
79.8
0
0
0.0
MSW Compliance Well
Activity Building
12:27
200
0.0
0.0
20.2
79.8
0
0
0.0
Structure
Animal Shelter
12:39
200
0.0
0.0
20.1
79.9
0
0
0.0
Structure
Break House
14:41
200
0.0
0.0
20.9
79.1
0
0
0.0
Structure
Bus Garage
12:00
200
0.0
0.0
20.3
79.7
0
0
0.0
Structure
Convenience Center
12:45
200
0.0
0.0
20.1
79.9
0
0
0.0
Structure
Maintenance Shop
12:21
200
0.0
0.0
20.0
80.0
0
0
0.0
Structure
Scalehouse
12:13
200
0.0
0.0
20.1
79.9
0
0
0.0
Structure
Trace Barn
14:04
200
0.0
0.0
20.6
79.4
0
0
0.0
Structure
MP-6
14:34
60
0.0
0.0
20.8
79.2
0
0
0.0
MSW Assessment Well
TR-2
14:22
60
5.3
8.5
14.8
71.4
106
106
0.0
MSW Assessment Well
TR-3
13:57
60
0.0
0.0
20.6
79.4
0
0
1.0
MSW Assessment Well
LFG-101
13:00
60
0.0
0.3
19.9
79.8
0
0
0.0
C&D Compliance Well
LFG-102
12:57
60
0.0
1.9
16.5
81.6
0
0
0.0
C&D Compliance,L:�Well
LFG-103
12:51
60
0.0
5.1
15.4
79.5
0
0
0.0
C&D Compliance Well
Completed by:
GOLDER
CUT-OFF TRENCH LFG VENT MONITORING LOG
Project Name: Henderson County Landfill
Site Contact: Greg Wiggins
Starting Temperature: 66° F
Starting Barometric Pressure: 30.03 in Hg
Monitoring Equipment: GEM 2000 Plus
Project Number: 0839650618.203
Technician(s): Erik Vasko
End Temperature: 66° F
End Barometric Pressure: 30.03 in Ho
Date: 02/11 /19
Monitoring Location
Time
Time Pumped
(sec)
%Methane
(CHa)
Carbon
Dioxide
(CO2)
%Oxygen
(02)
°
/° Balance
Gas
Initial
%LEL
Stabalized
%LEL
Hydrogen
Sulfide
(HZS, ppm)
MonitoringPoint
Location
Cut -Off Trench Vent 1
13:44
60
0.3
0.0
19.8
79.9
6
6
0.0
Southern Vent
Cut -Off Trench Vent 2
13:47
60
1.8
0.2
19.5
78.5
36
36
1.0
Northern Vent
Completed by:
4 GOLDER
r
TRACE
BARN
EW 2 EW�EW
a Q 1 ❑
Ci1T-OFF TRENCH VENT 2 -
PA \ [
Alf 6 28
❑2
W. ❑
5 � u� V
I 7 1 CLOT
CUT-OFF TRENCH VENT 1 E Ew- 7 t E - , gEMOLI
LANDFILL,
CLO VI
ATEMP
1 L DOSED C6 f 4 ' AST Hi E f
o i
�3 Ew - ,
❑ to 1 r
I LOSE
e EANON ,
E / o
MP-3 -45 W-
w'
P j
❑EW-I9 , ti dd❑
199t
r
4
PRIVAT
ROPE
LEGEND
EXISTING 10 FT, CONTOUR
EXISTING 2 FT. CONTOUR
— - - — PROPERTY LINE
— — — LIMITS OF WASTE
STREAM
BUFFER
•'^^^^'^+ 7REELINE
EXISTING ROAD
FENCE -----,------
LFG COLLECTION PIPING
.........
LFG CUT-OFF TRENCH
Mw•8 COMPLIANCE MONITORING WELL
s mw-1 NON COMPLIANCE MONITORING WELLS
. MP-6 COMPLIANCE METHANE MONITORING WELLS
A MP8 ASSESSMENT METHANE MONITORING WELLS
❑ BRA SURFACE WATER MONITORING POINT
Q EVV-29 LFG EXTRACTION WELL CONVERTED TO PASSIVE VENTING
NOTES
1. TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET
2. COORDINATE SYSTEM IS N.C. STATE PLANE GRID.
3. TOPOGRAPHIC DIVIDING LINE DIVIDES THE SASE MAP TOPOGRAPHIC CONTOURS FROM LANDSAT
TOPOGRAPHIC CONTOURS. LANDSATTOPOGRAPHICCONTOLRSHAVCASCONTOUR INTERVAL.
4. RECORDS WERE UNABLE TO BE LDCATED FOR LFG EXTRACTION WELLS EW-XI THROUGH EW-Xi AND WERE
GIVEN IDENTIFICATION NAMES UNTIL SUCH TIME THAT RECORDS ARE FOUND.
5. LOCATION OF CCMFLIANCE METHANE MONITORING WELL MP-4 ISAPPROXIMATE.
REFERENCE
I. BASE MAP PROVIOEO BY CAMP DRESSER & MCKEE FROM PREVIOUS wATER QUALITY MONITORING REPORTS.
2. WELLS MP-?, MPS, AND MP-R WERE SURVEYED BY REGIONAL LAND SURVEYING. INC. ON JUNE 1 T. 2C T5.
L
SITELOCATIONAP
N TO S
D 150 300
SCALE FEET
PRCJECT
HENDERSON COUNTY
HENDERSON COUNTY CLOSED MSVV AND C&D LANDFILL
����CLIENT
���::::::PERMIT#45-01
�_ONSULTANTPG C-399
YYYY-MM•DD
2G16.09.12
717— _
METHANE MONITORING LOCATION MAP
�v
PREPARED
MAK
s
G a L D E R
DESIGN
DYR
REVIEW
DYR
PROJECT No. DRAVUk-
GOLDER ASSOCIATES NC, INC.
APPROVED
RPK
08396506 1
INSTRUMENT CALIBRATION REPORT
Pine Environmental Services LLC
92 North Main St, Building 20
Windsor, NJ 08561
Toll -free: (800) 301-9663
Pine Environmental Services, Inc.
Instrument ID 6296
Description Gem 2000+
Calibrated 6/15/2018 9:18:54AM
Manufacturer CES Landtec
State Certified
Model Number GEM2000+
Status Pass
Serial Number./ Lot GM07960/05
Temp °C 24
Number
Location New Jersey
Humidity % 59
Department
Calibration Specifications
Group # 1
Range Ace %
0.0000
Group Name Methane
Reading Ace %
3.0000
Stated Accy Pet of Reading
Plus/Minus
0.0
Nom In Val / In Val In Type Out Val
Out Type
Fnd As
Lft As
Dev%
Pass/Fail
50.0 / 50.0 %Volume 50.0
%Volume
49.4
50.0
0.00%
Pass
Group # 2
Range Ace %
0.0000
Group Name Carbon Dioxide
Reading Ace %
3.0000
Stated Accy Pet of Reading
Plus/Minus
0.0
Nom In Val / In Val In Type Out Val
Out Type
Fnd As
Lft As
Dev%
Pass/Fail
35.0/35.0 %Volume 35.0
%Volume
36.1
35.0
0.00%
Pass
Group # 3
Range Ace %
0.0000
Group Name Oxygen
Reading Ace %
3.0000
Stated Accy Pct of Reading
Plus/Minus
0.0
Nom In Val / In Val In Type Out Val
Out Tvpe
Fnd As
Lft As
Dev%
Pass/Fail
20.9/20.9 %Volume 20.9
%Volume
20.4
20.9
0.00%
Pass
Group # 4
Range Ace %
0.0000
Group Name Carbon Monoxide
Reading Ace %
3.0000
Stated Accy Pct of Reading
Plus/Minus
0
Nom In Val / In Val In Type Out Val
Out Type
Fnd As
Lft As
Dev%
Pass/Fail
50150 PPM 50
PPM
51
50
0.00%
Pass
Group # 5
Range Ace %
0.0000
Group Name Hydrogen Sulfide
Reading Ace %
3.0000
Stated Accy Pct of Reading
Plus/Minus
0.00
Nom In Val / In Val In Type Out Val
Out Type
Fnd As
Lft As
Dev%
Pass/Fail
25.00 / 25.00 PPM 25.00
PPM
25.00
25.00
0.00%
Pass
Pine Environmental Services LLC Windsor Industrial Park, 92 North Main Street, Bldg 20, Windsor, NJ 08561, 800-301-9663
www.pine-environmental.com
INSTRUMENT CALIBRATION REPORT
Pine Environmental Services LLC
Pine Environmental Services, Inc.
Instrument ID 6296
Description Gem 2000+
Calibrated 6/15/2018 9:18:54AM
Test Instruments Used During the Calibration
Test Standard ID Description Manufacturer Model Number
NC 4 GAS 20.9 NC 4 GAS 20.9 Gasco 32211
FBH-412-6 EX FBH-412-6 EX 5/19
5/19
NC 50 CH4/35 NC 50 CH4/35 CO2 Gasco GP 12115 --
0O2--MAP-399- 31803
51-20-
Notes about this calibration
Calibration Result Calibration Successful
Who Calibrated Jonathan P. Smith
92 North Main St, Building 20
Windsor, NJ 08561
Toll -free: (800) 301-9663
As Of Cal Entry Date
Serial Number / Next Cal Date /
Lot Number Last Cal Date/ Expiration Date
Opened Date
FBH-412-6 5/19/2019
MAP-3 99-5 1 /20/2 020
A]I instruments are calibrated by Pine Environmental Services LLC according to the manufacturer's
specifications, but it is the customer's responsibility to calibrate and maintain this unit in accordance with the
manufacturer's specifications and/or the customer's own specific needs.
Notify Pine Environmental Services LLC of any defect within 24 hours of receipt of equipment
Please call 800-301-9663 for Technical Assistance
Pine Environmental Services LLC Windsor Industrial Park, 92 North Main Street, Bldg 20, Windsor, NJ 08561, 800-301-9663
www.pine-environmental.com