HomeMy WebLinkAbout67C-LCID-_FAR-FY17-18LCID State ofNorth Carolina
Department of Environmental Quality
Division of Waste Management
LAND CLEARING & INERT DEBRIS
LANDFILL
Facility Annual Report
For the period of July 1, 2017-June 30, 2018
According to G.S. 130A-309.09D(b), completed forms must be returned by August 1, 2018, and a copy of this report must be sent to the
County Manager of each county from which waste was received. If you have questions or require assistance in completing this report, contact
your Regional Environmental Senior Specialist.
Facility Name: Eastern Excavating, Inc. Permit: 67C-LCID
Physical Address Mailing Address
Street 1: 143 Penguin Ln Street 1: 115 Ned Ln
Street 2: Street 2:
City: Jacksonville County: Onslow City: Swansboro
State: North Carolina Zip: 28546 State: North Carolina Zip: 28584
Primary Facility Contact Person Billing Contact Person
Name: Terry Williams or Lisa Pfaff Name: Lisa Pfaff
Phone: (910) 353-9100 Fax: Phone: (910) 353-9100 Fax:
Email: eeiterry@yahoo.com Email: lisaeei@yahoo.com
1. Tipping Fee: $55.00 per single axle
Tipping Fee: $ 65.00 per double axle
Tipping Fee: $75.00 per tractor trailer
D tons 2. Estimate the amount of waste taken in an average week at this facility? 200 0 cubic yards ------------
3. How many weeks did you operate this year? 47
4. What are the hours/days of operation for this facility? Monday-Friday by contract, weekends by appointment or contract
5. What is the acreage of the footprint of the waste on site as of June 30? 5 Acre(s)
6. Did your facility stop receiving waste during this past Fiscal Year? 0Yes IZJNo
If so, please report the date this occurred:
REMINDER: According to G.S. 130A-309.09D(b), this
report must be sent to the Regional Environmental Senior
Specialist for your area and a copy of this report must be
sent to the County Manager of each county from which
waste was received.
Please return your completed report to:
Ray Williams
943 Washington Square Mall
Washington, NC 27889
Tele: 252.948.3955 Email: Ray.Williams@ncdenr.gov
CERTIFICATION: provided is an accurate representation of the activity at this facility.
Signature: Date: 7-10-18
Name: Lisa Pfaff Title: Office Manager
Phone Number: (910) 353-9100 Email: lisaeei@yahoo.com
LCID2018 67C-LCID Page I
NCDEQ
Division of Waste Management -Solid Waste Section Risk Assessment Form
Facility Name: Eastern Excavating, Inc. Permit: 67C-LCID
Address: 143 Penguin Ln
City: Jacksonville State: North Carolina Zip: 28546
Person completing Assessment: Lisa Pfaff Date: 7-10-18
Phone Number: (910) 353-9100 Fax: Email: lisaeei@yahoo.com
Instructions:
Please indicate either Yes or No for each Receptor and Post Closure Maintenance question. Then please
determine the distance or distances for each Receptor from the Edge of Waste (using range finders and/or GIS
maps) and type that information into the form. Please attach additional information including GIS maps, lists of
potable well locations, etc.
Receptors
1. Are there Residential Structures Within 1,500 feet of the Edge of Waste? •Yes ISi No
If Yes, how many? ---------What are the three closest distances from the Edge of Waste? Feet Feet Feet
2. Are there Water Supply Wells Within 1,500 feet of the Edge of Waste? •Yes ISi No
If Yes, how many? ---------What are the three closest distances from the Edge of Waste? Feet Feet Feet
3. Are there Community/Municipal Wells Within 1,500 feet of the Edge of Waste? •Yes ISi No
If Yes, how many? ---------What are the three closest distances from the Edge of Waste? Feet Feet Feet
4. Are there Surface Water Features Within 1,500 feet of the Edge of Waste? ISi Yes •No
If Yes, how many? 1 ---------What are the three closest distances from the Edge of Waste? 254.5 Feet Feet Feet
Please list the names of the water bodies: Poplar Creek -'---------------------------
5. Is Public Water Available Within 1,500 feet of the Edge of Waste?
If Yes, how many of the Residential Structures noted above are connected?
Corrective Measures
6. Is there an active methane extraction system (blower, flare, etc.)?
7. Is there a passive methane extraction system (trench, vents in cap, flare, etc.)?
8. Is there groundwater remediation taking place on site?
If Yes, what is the specific remedial technology used?
•Yes ISi No
-----------
OYes
•Yes
OYes
!El No
ISi No
ISi No
------------------------
Comments
LCID2018 67C-LCID Page2