Loading...
HomeMy WebLinkAbout17047 REEP Email 201801261 Schmithorst, William L From:John Lopez <jlopez@harthickman.com> Sent:Friday, January 26, 2018 8:00 AM To:Schmithorst, William L Cc:Wahl, Tracy; Hinnant, Lori P.; Michael Cain; Jason Oriol; Matt Bramblett Subject:[External] RE: EMP - REEP-LRC Project 1 - 1900 Continental Blvd - Charlotte Attachments:EMP_REEP-LRC Project 1.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  report.spam@nc.gov.  Bill,    Nice speaking with you yesterday.     Per your email below and our conversation yesterday, we have made the requested edit to the REEP‐LRC Project  EMP.  Please see the last section on pg 11 of the attached EMP Form to review the edit.     If everything looks good to you, please sign and return the EMP and then we will sign on our end.     Thanks,   John Lopez, PG, Senior Project Geologist Hart & Hickman, PC | 2923 South Tryon Street, Suite 100 | Charlotte, NC 28203 Direct 704-887-4628 | Mobile 803-580-4425| Main 704-586-0007 www.harthickman.com     From: Schmithorst, William L [mailto:William.Schmithorst@ncdenr.gov]   Sent: Thursday, January 18, 2018 1:24 PM  To: Matt Bramblett <MBramblett@harthickman.com>  Cc: Wahl, Tracy <tracy.wahl@ncdenr.gov>; Hinnant, Lori P. <Lori.Hinnant@klgates.com>; Michael Cain  <Michael.Cain@foundrycommercial.com>; John Lopez <jlopez@harthickman.com>; Jason Oriol  <Jason.Oriol@foundrycommercial.com>  Subject: Re: [External] Draft EMP Revision 1 ‐ REEP‐LRC Project 1 ‐ 1900 Continental Blvd ‐ Charlotte    Matt, The revised EMP is approved with the following exception: 1) The following statement will be deleted from the EMP: “no vapor intrusion mitigation is warranted for the future warehouse building” 2 Site assessment activities are ongoing. Based on the results from site assessment activities, sub-slab soil gas sampling may be required after construction to validate that mitigation measures will not be necessary. The approved EMP applies to site grading and excavation activities. An amended EMP will be required to address any vapor mitigation measures related to new building construction, if needed. Please forward the revised EMP to me with the requested change above for signature. Let me know if you have any questions. Regards Bill Schmithorst NCDEQ Brownfields Program Ph. 919-707-8159   From: Matt Bramblett <MBramblett@harthickman.com>  Sent: Wednesday, January 3, 2018 1:32 PM  To: Schmithorst, William L  Cc: Wahl, Tracy; Hinnant, Lori P.; Michael Cain; John Lopez; Jason Oriol  Subject: [External] Draft EMP Revision 1 ‐ REEP‐LRC Project 1 ‐ 1900 Continental Blvd ‐ Charlotte      CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  report.spam@nc.gov.    Bill,      Thanks for providing your responses on the EMP for the REEP‐LRC site.  The revised EMP is attached for your  review and approval. Because the EMP template form does not allow for track changes, I will include replies to  each of your comments to the original EMP in a separate email to be sent shortly. In general, the revisions  were made as you requested (denoted as “changes made” in our comment responses). However, please note  that on Pg. 11, while we did add language that indicated additional groundwater sampling would be  conducted to evaluate the potential for TCE in groundwater (per your request), we  elected to retain the  statement “no vapor intrusion mitigation is warranted for the future warehouse building” since previous soil  gas sampling conducted in the footprint of the building (including the southeast corner) confirm and support  this conclusion.   3    Please contact me if you have any questions or would like to discuss these changes further.      Thanks,  Matt     Matt Bramblett, PE, Principal  Hart & Hickman, PC | 2923 South Tryon Street, Suite 100 | Charlotte, NC 28203  Direct 704-887-4620 | Mobile 704-560-8009 | Main 704-586-0007 www.harthickman.com  Hart & Hickman | North Carolina’s Top Environmental ... www.harthickman.com Hart & Hickman PC is an environmental consulting firm serving clients throughout the Southeast US. Our well-trained engineers, geologists, scientists, and regulatory ...              From: Schmithorst, William L [mailto:William.Schmithorst@ncdenr.gov]   Sent: Wednesday, December 20, 2017 9:55 AM  To: Matt Bramblett <MBramblett@harthickman.com>  Cc: Wahl, Tracy <tracy.wahl@ncdenr.gov>; Hinnant, Lori P. <Lori.Hinnant@klgates.com>; Michael Cain  <Michael.Cain@foundrycommercial.com>; John Lopez <jlopez@harthickman.com>; Jason Oriol  <Jason.Oriol@foundrycommercial.com>  Subject: RE: Draft EMP ‐ REEP‐LRC Project 1 ‐ 1900 Continental Blvd ‐ DEQ Comments to Draft     Matt,  The DEQ Brownfields Program has reviewed the Draft EMP REEP‐LRC Project 1 for the site located at 1900  Continental Blvd. in Charlotte submitted by Hart & Hickman on December 6, 2017.  DEQ comments are  provided in the attached EMP. In addition to the attached comments, note that the EMP data summary tables  should also be updated to reflect the revised PSRGs and VISLs.       Please forward the revised EMP to my attention for DEQ approval before starting site grading activities.  Let  me know if you have any questions.     Regards,        Bill Schmithorst, P.G.    Project Manager   4 Division of Waste Management – Brownfields  NC Department of Environmental Quality    (919) 707-8159 - Direct Line & Fax  william.schmithorst@ncdenr.gov    217 W. Jones Street   1646 Mail Service Center  Raleigh, NC 27699-1646           **********************************************************************************    Email correspondence to and from this address is subject to the North Carolina Public Records Law and     may be disclosed to third parties unless the content is exempt by statute or other regulation.                 From: Matt Bramblett [mailto:MBramblett@harthickman.com]   Sent: Wednesday, December 06, 2017 2:46 PM  To: Schmithorst, William L <William.Schmithorst@ncdenr.gov>  Cc: Wahl, Tracy <tracy.wahl@ncdenr.gov>; Hinnant, Lori P. <Lori.Hinnant@klgates.com>; Michael Cain  <Michael.Cain@foundrycommercial.com>; John Lopez <jlopez@harthickman.com>; Jason Oriol  <Jason.Oriol@foundrycommercial.com>  Subject: [External] Draft EMP ‐ REEP‐LRC Project 1 ‐ 1900 Continental Blvd     CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  report.spam@nc.gov.     Bill,     Please find the attached draft Brownfields EMP for the above site your review and approval.  Based on an  email from Tracy Wahl, I understand that you will pick this project up when you return on December 11.  We  have some hard deadlines on this project based on wetlands permits.  Therefore, your prompt review of this  EMP would be super.     If you have any questions or comments, please let me know.     Thanks,  Matt        Matt Bramblett, PE, Principal  Hart & Hickman, PC | 2923 South Tryon Street, Suite 100 | Charlotte, NC 28203  5 Direct 704-887-4620 | Mobile 704-560-8009 | Main 704-586-0007 www.harthickman.com