Loading...
HomeMy WebLinkAbout7305_DukeMayo_CORR_201901231 Mckee, Shawn From:Witt, Kimberlee <Kimberlee.Witt@duke-energy.com> Sent:Wednesday, January 23, 2019 10:21 PM To:Mckee, Shawn Cc:Jackson, Benjamin H; Wilson, Leanne Subject:[External] RE: Duke Energy - Mayo Steam Electric Plant Landfill (PN 7305-INDUS) Leachate System Observation Scheduled Follow Up Flag:Follow up Due By:Friday, January 25, 2019 10:00 AM Flag Status:Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  report.spam@nc.gov  Shawn‐    The Mayo landfill leachate observation occurred today as planned.  The leachate side slope pumps were shut off around  9am and returned to service around 1pm.  The transducer levels in the two side slope risers normalized between 25‐in  and 35‐in.  The transducer levels returned to normal almost immediately after the pumps were re‐engaged.    If you would like to understand the data in more detail we can discuss when you and Ben are onsite next week.    Let me know if you have any questions or concerns‐  Kim    Kimberlee Witt, PE, ME DUKE ENERGY Sr. Engineer - Environmental Services 2500 Fairfax Road Greensboro, NC 27407 336-215-4576 m 336-632-3750 d   From: Witt, Kimberlee Sent: Tuesday, January 22, 2019 8:45 AM To: Mckee, Shawn Cc: Benjamin Jackson (benjamin.jackson@ncdenr.gov); Wilson, Leanne Subject: Duke Energy - Mayo Steam Electric Plant Landfill (PN 7305-INDUS) Leachate System Observation Scheduled   Shawn‐    As discussed on the phone this morning, Duke will be performing an observation of the leachate collection system at the  Duke Energy Mayo Steam Electric Plant onsite landfill (PN 7305‐INDUS). The observation is being conducted to assist  with calibrating the Leachate Management Tool (LMT) to ensure accuracy of leachate generation forecasts.    The observation will be conducted on January 23, 2019 beginning early morning.  The leachate side slope pumps in the  waste unit will be turned off during the observation.  Transducer levels will be monitored throughout the period of  2 observation with an anticipated end time of no later than 3:00pm.  Once the observation is complete, the leachate  collection system will be returned to automatic operation.    There is a potential to conduct an additional observation in the future during wet weather conditions.  Duke will notify  NCDEQ DWM if future observations are scheduled.    Regards‐  Kim    Kimberlee Witt, PE, ME DUKE ENERGY Sr. Engineer - Environmental Services 2500 Fairfax Road Greensboro, NC 27407 336-215-4576 m 336-632-3750 d