Loading...
HomeMy WebLinkAbout3506_BrantleyCompost_Inspection_20150812+ -Arias NCDENR NOR CAROLINA DEPARTMENT OF ENVIRONMENT AND Na uR. REs RQE FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer Compost SLAS COUNTY: FRANKLIN MSWLF PERMIT NO.: SWS-3506-COMPOST Closed HHW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF Tire T&P / Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: August 12, 2015 Date of Last Inspection: June 29, 2015 FACILITY NAME AND ADDRESS: David Brantley & Sons, Inc. 37 Pine Ridge Road Zebulon, NC 27597 GPS COORDINATES: N: 35.92656 E: 078.25294 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Shane Brantley, Owner/Operator Telephone: 888-817-1904 Email address: davidbrantleyandsonskyahoo.com dbsons@gmail.com Fax: 252-478-4644 FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Mary Whaley, NCDENR, Solid Waste Shane Brantley, owner, operator STATUS OF PERMIT: The permit was issued on March 22, 2012. It is a Small type 3 compost facility. The permit will expire on March 22, 2017. PURPOSE OF SITE VISIT: Partial inspection STATUS OF PAST NOTED VIOLATIONS: NA OBSERVED VIOLATIONS: NA The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 ADDITIONAL COMMENTS: 1. This inspection was done to check on the `comments and concerns' stated in the June 29, 2015 inspection.. 2. The pile of what appeared to be construction debris past the composted material was removed. 3. The amount of unacceptable wastes in the mulch pile and grease trap waste was less than previously observed, but there still was some observed. Remember to remove waste on a frequent basis and dispose of properly. 4. The Ops Plan states, "The immediate down slope area from the windrows are protected by an earth berm." The berm was observed, as the grass in the area had been mowed in order to facilitate the inspection. 5. It is recommended that the soil on either side of the concrete pad, where the leachate has flowed, be incorporated into the active windrow on a more frequent basis. These dates should be included with the daily log. 6. Easily visible permanent markers must be established to show the boundaries of the compost area. 7. Insure that a minimum of 25 feet, for emergency vehicle access is maintained around the site. 8. The access road was in good condition. 9. Insure that there is a 100 foot buffer between all parts of the compost site and any property line. Please contact me if you have any questions or concerns regarding this inspection report. A"-� Phone: 919-693-5023 Environmental Senior Specialist Regional Representative Sent on: Au ust 18, 2015 X Email Hand delivery US Mail Certified No. f j Copies: Dennis Shackelford, Eastern District Supervisor Tony Gallagher, Composting and Land Application Jessica Montie, Compliance Officer