Hi Carolyn – this is mostly fyi but call me if you think we should discuss. Later this year
Charlotte Water will be upgrading the sewer line along Doby Creek, at back of this site.
They called me to discuss the project. The sewer line is outside the known plume of soil or
groundwater contamination. Charlotte Water has the BFA and reviewed the LUR’s for this
site, and don’t believe they will be in any conflict.
This sewer line is to support continued development (including new Brownfield sites!) in
the northeast part of Charlotte, along the new light rail line.
We spoke about this site last year for a bridge over I-85 project. That project is still in
design.
David Wolfe, P.E., ENV SP
PROGRAM MANAGER
ENVIRONMENTAL SERVICES
ENGINEERING & PROPERTY MANAGEMENT
City of Charlotte, NC
Cell: 704 / 577-8611
We appreciate customer feedback. Please click here to take a short survey.
From: LeBlanc, Ryan Sent: Friday, March 09, 2018 10:11 AMTo: Wolfe, DavidSubject: Doby Gravity Sewer Plans
See attached.
Ryan F. LeBlanc, PE / Engineering Project ManagerCHARLOTTE WATER
5100 Brookshire Blvd. / Charlotte, NC 28216
P:704-391-5151 / C:980-259-9439 / charlottewater.org
CACACACA0
2016 AERIAL PHOTOGRAPHY
100 200
SCALE: 1" = 100'
50100
FES
DCB
DCB
DCB
FES
MH
CB
CB
CB
CB
CB
CB
DI
DI
FES
MH
MHDI
DIDICBCBFESFES RE
MO
VEREMOVE
REMOVE
REMOVEREMOVE
REMOVERETAINRETAINRETAIN
RETAIN RETAINRETAINRETAIN
RETAIN
RETAINRETAIN
RETAINRETAINRETAINRETAINRETAIN RETAINRETAINRETAIN RETAIN
RETAIN
RETAIN
RETAIN
RETAINRE
TAIN
RETAINHW
DIDIDI15" RCP 15" RCP 30" RCP
30" RCP 30" RCP
30" RCP
15" RCP15" RCP15" RCP15" RCP24" RCP 15" RCP18" RCP 18" RCP 15" RCP
30" RCP
15" RCP 15" RCP 15" RCP 15" RCP
18" RCP
18" RCP 15" RCP 15" RCP15" RCP
30" RCP LIMIT OF CONSTRUTION - CUT
LIMIT OF CONSTRUTION - FILL
LEGEND
MONITORING WELL
INTERSTATE
85
ROW
68' DUKE
EXISTING DUKE ENERGY TRANSMISSION LINEEXISTING SANITARY SEWER LINEI-85 NBI-85 SBTO MALLARD CREEK CHURCH RDTO W.T. HARRIS BLVDRETAINING WALL
PROPOSED
RETAINING WALL
PROPOSED
8921 RESEARCH DR
HEWLETT-PACKARD
9014 RESEARCH DR 1000 LOUIS ROSE PL
LOUIS ROSE PL
POLYMERS CENTER OF EXCELLENCE, INC
8900 RESEARCH DR
DOBY CREEK100-YEAR FLOODPLAIN
MALLARD CREEK POLYMERS, INC
8901 RESEARCH DR
TIAA / GO HEALTH
RESEARCH DRTWO BRIDGES CURRENTLY SHOWN.
OVER I-85 AND DOBY CREEK INSTEAD OF THE
LONGER BRIDGE COULD BE CONSTRUCTED
CROSSING DOBY CREEK OR ONE SINGLE
LARGE BOX CULVERT COULD BE CONSTRUCTED
THE DESIGN PROGRESSES. IT IS POSSIBLE A
SOME CHANGES COULD BE INCORPORATED AS
CREENWAY
DOBY CREEK POSSIBLE CONNECTION TO FUTURE
W TERW TERW TERW TERHAZEN AND SAWYER9101 SOUTHERN PINE BLVD, SUITE 250CHARLOTTE, NORTH CAROLINA 28273LICENSE NO. : C-0381NOTES:1. PROVIDE TEMPORARY BYPASS PUMPING AS NEEDED TOCOMPLETE NEW TIE-IN CONNECTIONS AND INSTALLNEW SANITARY SEWER. REFER TO SPECIFICATIONSECTION 02665.2. NEW SANITARY SEWER SHALL BE INSTALLED WITH ATRACER WIRE PER SANITARY SEWER TRACER WIREINSTALLATION DETAIL ON DWG D4 AND INACCORDANCE WITH SPECIFICATION SECTION 15000.68' DUKE ENERGYEASEMENTEXIST GRADE68' DUKE ENERGYEASEMENTPPPPPPPPPPPPPPPPPPPPASPHALT PARKINGEXIST 20'EASEMENTEXIST 15'EASEMENT20' PERMANENT EASEMENTWETLAND W1WETLAND W2WETLAND W5POLYMER CENTER OFEXCELLENCE, INCDEED REF: 21580-923TAX PARCEL NO. 04714103A/BEXIST 20'EASEMENT20' PERMANENTEASEMENT40'35'MONITORINGWELL4PROPOSED 36" DIP
W TERW TERW TERW TERHAZEN AND SAWYER9101 SOUTHERN PINE BLVD, SUITE 250CHARLOTTE, NORTH CAROLINA 28273LICENSE NO. : C-0381NOTES:1. PROVIDE TEMPORARY BYPASS PUMPING AS NEEDED TOCOMPLETE NEW TIE-IN CONNECTIONS AND INSTALLNEW SANITARY SEWER. REFER TO SPECIFICATIONSECTION 02665.2. NEW SANITARY SEWER SHALL BE INSTALLED WITH ATRACER WIRE PER SANITARY SEWER TRACER WIREINSTALLATION DETAIL ON DWG D4 AND INACCORDANCE WITH SPECIFICATION SECTION 15000.3. CONTRACTOR SHALL NOT USE EXISTING CONCRETEBRIDGE FOR ACCESS.EXIST GRADE68' DUK E ENERGY
EASEMENT EXIST 20'EASEMENTPPPPPPPPPPPPASPHALT PARKINGASPHALT DRIVE20' PERMANENT EASEMENT40'POLYMER CENTER OFEXCELLENCE, INCDEED REF: 21580-923TAX PARCEL NO.04714103A/BTHE GC NET LEASE(CHARLOTTE RESEARCH) INVESTORS, LLCC/O GRIFFIN CAPITAL CORPORATIONDEED REF: 29634-996TAX PARCEL NO. 0471410740'EXIST 20'EASEMENT25' PERMANENT EASEMENT15' PERMANENT EASEMENT20' PERMANENTEASEMENTPROPOSED 36" DIP