HomeMy WebLinkAbout05016_Southern Mfg Tank Pit Fill Letter 20070911Charlotte Division
6636 East W.T. Harris Boulevard
Suite E
Charlotte, NC 28215
Phone: (704) 531-5232
Fax: (704) 531-7594 Morlando-Holden
Construction, Inc.
General Contractor
September 11, 2007
Ms. Carolyn Minnich
1314 Mallard Ridge Dr.
Tega Cay, SC 29708
Fax: (803) 547-1018
RE: NC Music Factory-3 Outdoor Projects
Dear Ms. Minnich,
Morlando-Holden Construction, Inc. would like to make you aware of the intentions of Fiber
Mills,lLC, East Coast Abatement, and Morlando-Holden Construction, Inc. as it pertains to the North
Carolina Music Factory. As directed by East Coast Abatement, Morlando-Holden Construction, Inc.
will remove any contaminated soil using an enclosed piece of equipment and put the contaminated
soil~ in a stockpile. Once the contaminated soils are stockpiled, East Coast will cover material per
State and local guidelines.
Once we have closure on the tank "pit" we are proposing to put contaminated soils in the bottom of
pit and then put geogrid on top of contaminated soils. Once the contaminated soils are identified for
any future digging by using that geogrid, we will then proceed to backfill the remainder of "pit" with
not less than 12" of clean fill.
In conclusion, we thank you for your help in this matter and please contact East Coast Abatement or
Morlando-Holden Construction, Inc. with any questions or concerns
Sincerely,
Dan Holden
Project Manager
Morlando-Holden Construction, Inc.
Cc: Doug Hardaway
Wilbur Holden
Dominic Morlando
Scott Cornell
Noah Lazes
File
An Equal Opportun/fyEmployeT .. MemberofThe Associated G8Tl81'l11 ConlTaetofS ofAmerica .. Member ofBetI9r Business Bureau