HomeMy WebLinkAbout05016 Southern Mfg Soil Cap workFrom:RLazes@aol.com
To:cminnich@ci.charlotte.nc.us
Subject:No Subject
Date:Wednesday, April 30, 2003 12:11:06 PM
Carolyn,
The rest of the dirt has been placed on the site. The entire area has been seeded and mulched.
I have called Tony to do a new topo survey and I'll get you the results as soon as they're complete.
Glad you had a good time at the fesitval. Sorry we didn't get a chance to meet in person. I'll give you a call the next
time I'm in Charlotte.
One small favor I'd like to ask you for. Can you send me a letter saying that we have agreed to a Bronwsfield's
agreement with NCDENR and that we have completed all of the remediation necessary to comply with that
agreement? I understand that the process is not complete until the comment period has expired but I have been asked
by the previous owner to send him a letter to show him that we have complied with the requirements of the
Brownsfield agreement.
Thanks and have nice day.
Rick Lazes
From:RLazes@aol.com
To:cminnich@ci.charlotte.nc.us
Subject:No Subject
Date:Wednesday, May 07, 2003 3:58:14 PM
Fiber Mills, LLC
Dear Ms. Minnich,
I am writing inregards to the Brownsfields Agreement on the Former Southern Manufacturing Site, 1000 Seaboard
Street, Charlotte, North Carolina.
During the month of April 2003, We installed the geotextile membrane and covered the asbestos contaminated areas
with a minimum of six inches of compacted non-asbestos-containing material and we have seeded the area to
prevent exposure of the asbestos containing waste as required under our Brownsfields Agreement for that property.
I would appreciate your issuing me a letter confirming that this work has been done in compliance with our
obligations under our Brownsfields Agreement.
Thank you.
Best regards,
Richard Lazes, president
From:Minnich, Carolyn
To:" (RLazes@aol.com)"
Cc:Bruce Nicholson (E-mail); "mac@arcspecialevents.com"
Subject:Southern Manufacturing Soil Cap
Date:Monday, May 19, 2003 4:26:19 PM
Hi Rick:
I met with Mac Goodwin this morning and walked the former Southern Manufacturing Site. The soil capping looks
good and we discussed that one area remains to be covered near the corner of Seaboard and Hamilton Street. After
reviewing the historical reports and analytical data, the coverage by the stream and near the electrical substation is
adequate. No additional coverage is needed in these areas.
One outstanding issue is the installation of measuring devices for future inspections. We need some type of rod or
pole in the ground to determine if and when erosion occurs over time in the covered areas. These rods should be
place in various locations across the site. The rods will be used as a gauge to ensure that the site is adequately
covered and maintained in years to come.
Upon completion, please send a letter report of the sites activities including the initial and final topographic surveys.
The summary letter should include when the site activities occurred and who completed them. I will review the
documents and send a letter of approval from the DENR Brownfields Program. At this time, the Responsible Party
(Southern Manufacturing) may petition the IHSB Section for removal on the DENR Inactive Hazardous Site
Inventory. This section may require additional certification or other activities. Please note, the activities you have
completed are in accordance with the DENR Brownfields Program.
Per our previous discussion, we agreed to update the plat to reflect actual covered areas. Please forward this plat to
my attention prior to the end of public comment for signing the second week in June (assuming no public comments
are received). This will ensure the plat reflects field conditions. The plat should also include the locations of the
rods for future reference and updates.
Thank You.
Carolyn Minnich
Brownfields Project Manager
NC Division of Waste Management
c/o City of Charlotte
Neighborhood Development Key Business
600 East Trade Street
Charlotte, NC 28202
Office: 704/336-3499
Fax: 704/336-2527
Mobile: 704/661-0330
From:bshoaf@eastcoastwrecking.com
To:Carolyn.Minnich@ncmail.net
Subject:NC Music Factory
Date:Thursday, July 26, 2007 12:10:03 PM
Attachments:NC MUSIC FACTORY PDF.pdf
brownfield3.jpg
IMAGE_007.jpg
IMAGE_016.jpg
Carolyn,
I have attached a pdf and pictures showing our plan for containment
and removal of contaminated material. All doors leading from building
into site will be locked and signed from inside. All water used for
truck wash and decon station will have sub-micron filtration attached.
As additional precaution, filters will also be placed on all possible
drainage pipes near work site. If you have any further questions, feel
free to contact me anytime.
Thank-you,
Brandon Shoaf
VP of Operations
East Coast Wrecking, LLC.
704-845-1614
704-408-5825 Mobile
www.eastcoastwrecking.com
Work Site
Truck Wash
Decon Station
ENTRANCE / EXIT
6ft. Secure Chain Link Fence
6ft. Secure Chain Link Fence
PAGE 01
3610 Red Oak Court. New Orleans, La. 70131
OFC. (504) 36.1.4321. FAX (504) 361-4323
)3 NO. OF PAGES:DATE:
COMPANY:NC Division of Waste ManagementTO;
FAX NO.:704-336-2527
SUBJECT:Borwnsfields Remediation
Carolyn Milmich
Brownsfields Project Manager
Dear Carolyn:
This letter will serve to notify you that we have successfully completed all of the remediation work
required under our Brownsfields Agreement at 1000 Seaboard Street, Charlotte, North Carolina. I
have sent you two topographical surveys, one prior to completing the remediation work and one
after it was comleted. These maps show all of the areas on the property that were known to have
buried asbestos and identify those same areas areas that we have covered with geotextile material
and a minimum of six inches of non contaminated soil. In addition we have complied with all of the
other aspects of our Brownsfields Agreement.
Please send me a letter confinning that this work has been satisfactorily completed in compliance
with the tenns of oW' Brownsfields Agreement.
ThankyOU for your continued assistance with this project
Best regards,
""'~...c.J'\.a_.I\ D c~.~~.~
Richard Lazes, president
From:Nelson Richard
To:carolyn.minnich@ncmail.net
Cc:Greco Chuck
Subject:1000 Seaboard Street
Date:Friday, July 20, 2007 1:39:40 PM
Attachments:1000 Seaboard St 072007.pdf
Carolyn,
The information that I promised you is attached. I have spoken to Scott Cornell and provided your phone
number to him. He will very likely call you to see what is necessary for him to resume work at the site.
Please keep me informed regarding any developments, and if you meet with the involved parties on the
site next week, I'd like to be included to meet you, learn something about the brownfield program and
agreement for the site (could we get a copy?), and conclude our involvement.
Thank you!
Richard