Loading...
HomeMy WebLinkAbout3406_PiedmontLandfill_LFG_Q4Rpt_20151006 2211 West Meadowview Rd. Greensboro, NC 27407 tel: 336/323-0092 fax: 336/323-0093 www.JoyceEngineering.com October 6, 2015 Mr. Al Lacsamana, P.E. Waste Management of the Carolinas, Inc. District Manager – Closed Sites 1000 Parkwood Circle, Suite 700 Atlanta, GA 30339 RE: 2015 FOURTH QUARTER LANDFILL GAS MONITORING PIEDMONT LANDFILL & RECYCLING CENTER JOYCE PROJECT NO. 392.1501.12, TASK 02 Dear Al: Attached to this letter is the landfill gas migration monitoring results for the Fourth Quarterly monitoring Event of 2015 at the Piedmont Landfill in Kernersville, North Carolina. Ten permanent gas probes, eighteen bar-hole probes, and one on-site structure were monitored on October 6, 2015. Gas Probe GP-10 was exempted from the compliance monitoring network in a letter from North Carolina Department of Environment and Natural Resources (DENR) – Solid Waste Section dated January 21, 2014. There was no exceedence of the LEL in the compliance network or on-site structure. The results are presented on the NC DENR format Landfill Gas Monitoring Data Form dated October 6, 2015. The Piedmont Landfill monitoring results were also uploaded to the WM LGMS on October 6 . NC DENR notification is not required at this time based on no detections of methane and no exceedences of the Lower Explosive Limit (LEL) in the compliance monitoring locations during the event. A copy of this report should be kept on file for the facility. If you require anything else please let me know (336) 323-0092, or contact Mousa Maimoun at (704)-837-2005. Sincerely, JOYCE ENGINEERING Gretta Eller Field Consultant Enclosure: NC DENR LFG Monitoring Data Form – October 6, 2015 Cc: Mike Quedens – WM (email only)