Loading...
HomeMy WebLinkAbout41S_D&DGradingLCIDLF_CommentsonPermitModApp_FID1254645_201808301 Chao, Ming-tai From:Chao, Ming-tai Sent:Thursday, August 30, 2018 12:40 PM To:'Anthony Lester' Cc:Patrone, John; 'adl@evans-eng.com'; Stanley, Sherri Subject:RE: D & D Grading L.C.I.D 41S - Plan Phase 1A modification Dear Mr. Lester: Per phone conservations on 08/29/2018, the Solid Waste Section (SWS) understood that the request for a permit modification is adjusting the waste fill grades in approved landfill Phases 1 & 1A. This grade modification will change the operating capacity of the Phases 1 & 1A but will not change the approved gross capacity of the landfill of 387,142 cubic yards [the final fill grade at 780 feet amsl as shown on drawing Sheet No. 1 of 5 (DIN 25871)]. You agreed to submit a written request for narrating this permit modification and to revise the operating capacity for each phase (Phase 1 through 6) of the landfill shown on the submitted drawing Sheet No. 2 of 5. After obtaining the info from the phone conservation, the SWS conducted a quick review of the drawing Sheet No. 2 of 5 submitted on 08/29/2018 and other pertinent data in the SWS database/file system. The current permit for the LCIDLF dated April 19, 2016 (DIN 25851) allows Mr. David E. Dick – permit holder to construct and operate Phases 1 & 1A of the LCIDLF, which encompass approximately 3.5 acres. However, the latest Facility Annual Report and the submitted drawing Sheet No. 2 of 5 show the landfill waste disposal footprint is approximately 4.4 acres. It is evident that the permit holder has constructed and operated waste disposal activities at approximately 0.9-acre area which is NOT PERMITTED. Therefore, the SWS strongly recommends that the new permit application shall include the revision of waste footprint for each phase of the LCID landfill. Please noted that the total waste boundary of the landfill is 13.0 acres. The phasing plan including phases 1, 1A, 2 through 6 must be clearly delineated on the revised drawing. Please contact myself if you have any question of the permit application. Thanks and have a wonderful day. Ming Chao From: Anthony Lester [mailto:adl@evans-eng.com] Sent: Wednesday, August 29, 2018 9:09 AM To: Patrone, John <john.patrone@ncdenr.gov> Cc: Chao, Ming-tai <ming.chao@ncdenr.gov> Subject: [External] FW: D & D Grading L.C.I.D 41S - Plan Phase 1A modification Ming-Tai, Chao Environmental Engineer, Solid Waste Section Division of Waste Management North Carolina Department of Environmental Quality 919.707-8251 (Office) Ming.Chao@ncdenr.gov 2 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam. John and Ming Please find attached the proposed modifications to Phase 1 and Phase 1A that we submitted to Christine last October. We never heard back from her. Please review and let me know if there are any questions. Thanks for your help. Anthony From: Anthony Lester Sent: Thursday, October 19, 2017 7:45 AM To: christine.ritter@ncdenr.gov Subject: D & D Grading L.C.I.D Plan Phase 1A modification Good morning Christine Thanks for taking the time a few days ago to speak with me about the D & D LCID site and possibly modifying the configuration of the phase lines. The first attachment above is of the approved plans. The second attachment shows how we would like to modify the fill in Phase 1 and 1A. The volumes are the same, this new configuration would allow for easier access as we progress into the future phases. After you have had a chance to review this, please call me. Thanks for your help. Anthony D. Lester, PE, PLS Vice-President Evans Engineering, Inc. 336-382-4416 Mobile 336-279-7450 Office