Loading...
HomeMy WebLinkAbout9226_INSP_20180817FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: WAKE Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9226-CDLF-2001 CDLF X Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: August 17, 2018 Date of Last Inspection: April 12, 2018 FACILITY NAME AND ADDRESS: Shotwell C&D Landfill, Inc. 4714 Smithfield Road Wendell, NC 27591-8651 919-556-1182 919-217-0045 GPS COORDINATES: N: 35.72417 W: -78.4349 FACILITY CONTACT NAME AND PHONE NUMBER: David King 919-427-4104 dking@debrisrp.com FACILITY CONTACT ADDRESS: Mr. David W. King, President Shotwell Landfill, Inc. 424 Warehouse Drive Raleigh, NC 27610 PARTICIPANTS: Liz Patterson, NCDEQ - Solid Waste Section Nelly Basnett – Shotwell Landfill, Inc. STATUS OF PERMIT: PTC, Original Issue, Phase I - January 10, 2001 PTO, Phase I, Cell 1 - April 30, 2001 PTO, Modification - April 12, 2004 PTO, Phase I, additional 1 acre - March 30, 2006 PTC, Phase II - October 16, 2006 PTO, Phase II, Cell 1, 2 acre subcell - November 8, 2006 PTO, Phase II, Cell 1, remaining area - June 19, 2007 PTO, Phase II, Cell 2 - July 18, 2008 PTO, Phase II, Cell 3 - June 12, 2009 PTC, Phase III and PTO (all prior phases/cells) - October 26, 2010 PTC, Phase 3 amended and PTO (Phase 1-3A) - July 25, 2011 PTO, Phase 3, Cell B - June 15, 2012 PTO, Phase 3, Cell C – April 1, 2013 PTC, Phase 4, PTO Phases 1,2,3 - June 12, 2014 PTC – Phase 4B, PTO – Phases 1,2, and 3and 4A – April 24, 2015 PTO, Phases 1,2,3, and 4 – July 9, 2015 PTO, Phases 1,2,3,4 and 5 – July 26, 2018 PTO expires July 25, 2021 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: NONE OBSERVED VIOLATIONS: NONE ADDITIONAL COMMENTS The facility is a construction and demolition (C&D) debris landfill. The Permit to Operate Phases 1, 2, 3, 4, 5 was issued June 26, 2018 and shall expire July 25, 2021. Per Condition #13 in Part III of Attachment 3 of the Permit a permit amendment should be submitted to the SWS no later than January 25, 2021. 1. The facility is permitted to receive C&D waste, inert debris, asphalt, and land-clearing debris generated within Wake and Johnston counties. 2. The facility is approved to accept 91,250 tons per year or approximately 250 tons per day, based on 365 operating days per year, in accordance with the approved franchise granted by Wake County. 3. The facility is fenced and is secured by a locking gate when it is not open for operation. 4. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact information as well as materials accepted at the facility. 5. The facility accepts waste Monday through Friday from 7:30 am until 4:00 pm. Personnel are onsite during operating hours. 6. Cover logs noting the date and time of placement were reviewed and are being maintained properly. 7. The smell of landfill gas consistent with a construction and demolition debris landfill was detected onsite. 8. A perimeter road has been established around the entire footprint of the landfill. The perimeter road is being well maintained. 9. Edge-of-waste markers have been installed and are being maintained around the landfill as required. 10. The working face was appropriately sized for the expected waste. The exposed area was less than ½ acre and appears that it is being covered at least once weekly. Six inches of earthen material should be properly applied once weekly or when the working face reaches ½ acre. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 11. The waste type was reviewed and was construction and demolition waste. 12. Areas of erosion noted during inspection on interior side slopes of the landfill that need attention. Continue to monitor and control erosion in this area and apply additional cover when needed. 13. Windblown waste was being well managed onsite and along Smithfield Road. 14. Digital photos were taken during the inspection Please contact me if you have any questions or concerns regarding this inspection report. Phone: 910-433-3353(O) elizabeth.patterson@ncdenr.gov Liz Patterson Environmental Senior Specialist Regional Representative Sent on: 9-7-2018 X Email Hand delivery US Mail Certified No. [ _] Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section