HomeMy WebLinkAbout9226_INSP_20180817FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: WAKE
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 9226-CDLF-2001
CDLF X Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: August 17, 2018 Date of Last Inspection: April 12, 2018
FACILITY NAME AND ADDRESS:
Shotwell C&D Landfill, Inc.
4714 Smithfield Road
Wendell, NC 27591-8651
919-556-1182
919-217-0045
GPS COORDINATES: N: 35.72417 W: -78.4349
FACILITY CONTACT NAME AND PHONE NUMBER:
David King 919-427-4104 dking@debrisrp.com
FACILITY CONTACT ADDRESS:
Mr. David W. King, President
Shotwell Landfill, Inc.
424 Warehouse Drive
Raleigh, NC 27610
PARTICIPANTS:
Liz Patterson, NCDEQ - Solid Waste Section
Nelly Basnett – Shotwell Landfill, Inc.
STATUS OF PERMIT:
PTC, Original Issue, Phase I - January 10, 2001
PTO, Phase I, Cell 1 - April 30, 2001
PTO, Modification - April 12, 2004
PTO, Phase I, additional 1 acre - March 30, 2006
PTC, Phase II - October 16, 2006
PTO, Phase II, Cell 1, 2 acre subcell - November 8, 2006
PTO, Phase II, Cell 1, remaining area - June 19, 2007
PTO, Phase II, Cell 2 - July 18, 2008
PTO, Phase II, Cell 3 - June 12, 2009
PTC, Phase III and PTO (all prior phases/cells) - October 26, 2010
PTC, Phase 3 amended and PTO (Phase 1-3A) - July 25, 2011
PTO, Phase 3, Cell B - June 15, 2012
PTO, Phase 3, Cell C – April 1, 2013
PTC, Phase 4, PTO Phases 1,2,3 - June 12, 2014
PTC – Phase 4B, PTO – Phases 1,2, and 3and 4A – April 24, 2015
PTO, Phases 1,2,3, and 4 – July 9, 2015
PTO, Phases 1,2,3,4 and 5 – July 26, 2018
PTO expires July 25, 2021
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
PURPOSE OF SITE VISIT:
Partial Inspection
STATUS OF PAST NOTED VIOLATIONS:
NONE
OBSERVED VIOLATIONS:
NONE
ADDITIONAL COMMENTS
The facility is a construction and demolition (C&D) debris landfill. The Permit to Operate Phases 1, 2, 3, 4, 5 was
issued June 26, 2018 and shall expire July 25, 2021. Per Condition #13 in Part III of Attachment 3 of the Permit a
permit amendment should be submitted to the SWS no later than January 25, 2021.
1. The facility is permitted to receive C&D waste, inert debris, asphalt, and land-clearing debris generated within
Wake and Johnston counties.
2. The facility is approved to accept 91,250 tons per year or approximately 250 tons per day, based on 365 operating
days per year, in accordance with the approved franchise granted by Wake County.
3. The facility is fenced and is secured by a locking gate when it is not open for operation.
4. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency
contact information as well as materials accepted at the facility.
5. The facility accepts waste Monday through Friday from 7:30 am until 4:00 pm. Personnel are onsite during
operating hours.
6. Cover logs noting the date and time of placement were reviewed and are being maintained properly.
7. The smell of landfill gas consistent with a construction and demolition debris landfill was detected onsite.
8. A perimeter road has been established around the entire footprint of the landfill. The perimeter road is being
well maintained.
9. Edge-of-waste markers have been installed and are being maintained around the landfill as required.
10. The working face was appropriately sized for the expected waste. The exposed area was less than ½ acre and
appears that it is being covered at least once weekly. Six inches of earthen material should be properly applied
once weekly or when the working face reaches ½ acre.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
11. The waste type was reviewed and was construction and demolition waste.
12. Areas of erosion noted during inspection on interior side slopes of the landfill that need attention.
Continue to monitor and control erosion in this area and apply additional cover when needed.
13. Windblown waste was being well managed onsite and along Smithfield Road.
14. Digital photos were taken during the inspection
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 910-433-3353(O)
elizabeth.patterson@ncdenr.gov
Liz Patterson
Environmental Senior Specialist
Regional Representative
Sent on: 9-7-2018 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section