HomeMy WebLinkAbout76005YWN_INSP_20180829FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID YW X Transfer Compost SLAS COUNTY: Randolph
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 76-005 YWN
CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: August 29, 2018 Date of Last Inspection: November 22, 2016
FACILITY NAME AND ADDRESS:
City of Asheboro Leaf Transfer Station
630 Transfer Station Place
Asheboro, NC 27203
GPS COORDINATES:
N: 35.72117 W: -79.79577
FACILITY CONTACT NAME AND PHONE NUMBER:
David Hutchins, Director – City of Asheboro Division of Public Works
w. 336-626-1234 x. 2202
dhutchins@ci.asheboro.nc.us
FACILITY CONTACT ADDRESS:
City of Asheboro Division of Public Works
David Hutchins, Director
1312 N. Fayetteville Street
Asheboro, NC 27203
PO Box 1106
Asheboro, NC 27204-1106
PARTICIPANTS:
John Patrone, Environmental Specialist II - Solid Waste Section (SWS)
David Hutchins, Director – City of Asheboro Division of Public Works
Rusty Turner, Assistant Superintendent – City of Asheboro Sanitation Department
Dwain Maness, Superintendent – City of Asheboro Street Department
Barry Hamilton, Assistant Superintendent – City of Asheboro Street Department
STATUS OF PERMIT:
Yard Waste Notification application received by the SWS
Yard Waste Notification annual renewal due by June 1st
PURPOSE OF SITE VISIT:
Comprehensive Inspection (to ensure that the Yard Waste Notification is in compliance with 15A North Carolina
Administrative Code (NCAC) 13B .1404(a)(1)-(10), 13B .1406, and the requirements as stated on the Yard Waste
Notification application and in the Yard Waste Notification approval letter)
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS
On August 29, 2018, John Patrone met with David Hutchins, Rusty Turner, Dwain Maness, and Barry Hamilton to conduct
a comprehensive inspection of the City of Asheboro Leaf Transfer Station on Transfer Station Place in Asheboro,
Randolph County.
1. The facility is a yard waste notification (YWN) owned by the City of Asheboro.
2. The YWN is located adjacent to the City of Asheboro Transfer Station (76-05), at the rear of the property.
3. The YWN site is not open to the public. It is used by City of Asheboro Public Works Division vehicles/personnel.
4. Material is received from Randolph County.
5. The City of Asheboro collects leaves annually from October through February. Although, yard waste is collected
year-round.
6. Ensure processed and unprocessed material on site is less than 6000 yd3 quarterly.
7. At the time of the inspection, there were five windrows on site.
8. Leaf windrows should be turned often-enough to ensure temperatures do not exceed 160 °F. The windrow
material should not remain clumpy.
9. Turning leaf windrows will accelerate the decomposition process and create uniform compost.
10. Temperature records shall be maintained for each windrow during active composting demonstrating 3 days at
> 131°F, aerated to maintain elevated temperatures.
11. The facility maintains leaf windrow temperature records. Records for two windrows were observed, indicating
compliance. The remaining three will have temperatures recorded in the fall.
12. Temperature probe calibration records should be maintained.
13. The facility stores logs on the property available for employees to cut for firewood.
14. The area adjacent to the YWN is used as a beneficial fill site for inert materials. The City is extending the level
area available for operations and storage.
15. The City of Asheboro Fire Department can be contacted to address an emergency at the facility.
16. The facility is secured by a locked gate.
17. Access roads are of all-weather construction.
18. The YWN shall be renewed annually, by June 1st.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 336.776.9673 or email: john.patrone@ncdenr.gov
John Patrone
Environmental Specialist II
Regional Representative
Sent on: August 31, 2018 X Email Hand delivery US Mail Certified No. [ _]
Copies: Deb Aja, Western District Supervisor – SWS
Adam Ulishney, Environmental Compliance Branch Head - SWS
Dylan Friedenberg, Environmental Specialist - SWS
Rusty Turner, Assistant Superintendent – City of Asheboro Sanitation Department (w. 336-626-1234 x.
2221, rturner@ci.asheboro.nc.us)
Dwain Maness, Superintendent - City of Asheboro Street Department (w. 336-626-1234 x. 2206,
dmaness@ci.asheboro.nc.us)
Barry Hamilton, Assistant Superintendent – City of Asheboro Street Department (w. 336-626-1234 x.
2242, bhamilton@ci.asheboro.nc.us)