Loading...
HomeMy WebLinkAbout4501_HendersonCountyMSW_LFG_4thQtrMethaneReport_20171115 Golder Associates NC, Inc. 5B Oak Branch Drive Greensboro, NC. 27407 USA Tel: (336) 852-4903 Fax: (336) 852-4904 www.golder.com Engineering Lic. No. C-2862/Geology Lic. No. C-399 Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation November 15, 2017 083-9650617.202 Ms. Jaclynne Drummond Compliance Hydrogeologist North Carolina Department of Environmental Quality Division of Waste Management – Solid Waste Section 2090 US Highway 70 Swannanoa, NC 28778 828-296-4706 RE: METHANE MONITORING RESULTS – FOURTH QUARTERLY EVENT OF 2017 CLOSED HENDERSON COUNTY LANDFILL, PERMIT NO. 45-01 HENDERSON COUNTY, NORTH CAROLINA Dear Jackie: Attached are the results from the November 13, 2017, fourth quarterly methane monitoring event conducted at the above-referenced facility. As shown on the attached Boundary Gas Probe Monitoring Log, methane was not detected above the lower explosive limit (LEL) in any compliance methane monitoring points during the event. Methane was detected above the LEL at assessment methane monitoring wells TR-2 and TR-3. No methane was detected in the facility structures during this compliance monitoring event. This was the fourth quarterly methane monitoring event since the installation of the landfill gas cut-off trench between MP-4 and the waste unit, which was completed on December 16, 2016, and documented in the January 13, 2017, Landfill Gas Cut-Off Trench Installation Report. Methane was measured from the two vents from the cut-off trench during the quarterly event to confirm that they are producing methane. A monitoring log with the gas vent methane results is attached. If you have any questions or concerns, please contact us at 336-852-4903. Sincerely, GOLDER ASSOCIATES NC, INC. David “Dusty” Y. Reedy II, PG Rachel P. Kirkman, PG Senior Hydrogeologist Associate and Senior Consultant Attachment: Boundary Gas Probe Monitoring Log – November 13, 2017 Cut-off Trench LFG Vent Monitoring Log – November 13, 2017 Methane Monitoring Location Map Calibration Record Cc: Marcus Jones, PE, Director of Engineering, Henderson County, 1 Historic Courthouse Square, Suite 6, Hendersonville, NC 28792. 828-694-6560. majones@hendersoncountync.org Greg Wiggins, Operations Manager, Henderson County, 191 Transfer Station Drive, Hendersonville, North Carolina 28791. 828-694-7982. gwiggins@hendersoncountync.org g:\projects\henderson county\0839650617\phase 202 - 4th qtr lfg 2017\200 deliverables\252 final issued\0839650617.202-001-r-rev0-lfg_rpt_nov_2017.docx Date:11/13/17 Project Name: Project Number: Site Contact: Technician(s): End Temperature: End Barometric Pressure: Monitoring Location Time Time Pumped (sec) % Methane (CH4) % Carbon Dioxide (CO2) % Oxygen (O2) % Balance Gas Initial % LEL Stabalized % LEL Hydrogen Sulfide (H2S, ppm) Monitoring Point Status MP-1 14:14 60 0.0 7.0 13.5 79.5 0 0 --MSW Compliance Well MP-3 14:47 60 0.0 5.6 11.2 83.2 0 0 --MSW Compliance Well MP-4 14:36 60 0.0 6.5 12.5 81.0 0 0 --MSW Compliance Well MP-7 15:14 60 0.0 9.1 9.3 81.6 0 0 --MSW Compliance Well MP-8 15:11 60 0.0 2.9 18.0 79.1 0 0 --MSW Compliance Well MP-9 15:05 60 0.0 2.8 18.2 79.0 0 0 --MSW Compliance Well Activity Building 15:22 200 0.0 0.0 21.6 78.4 0 0 --Structure Animal Shelter 13:45 200 0.0 0.0 20.3 79.7 0 0 --Structure Break House 14:17 200 0.0 0.0 21.0 79.0 0 0 --Structure Bus Garage 13:53 200 0.0 0.0 20.4 79.6 0 0 --Structure Convenience Center 15:40 200 0.0 0.0 21.8 78.2 0 0 0.0 Structure Maintenance Shop 14:10 200 0.0 0.0 20.7 79.3 0 0 --Structure Scalehouse 14:02 200 0.0 0.0 20.5 79.5 0 0 --Structure Trace Barn 14:59 200 0.0 0.0 20.3 79.7 0 0 --Structure MP-6 15:00 60 0.0 0.0 21.3 78.7 0 0 --MSW Assessment Well TR-2 14:55 60 8.4 16.1 8.6 66.9 168 168 --MSW Assessment Well TR-3 14:52 60 31.1 38.9 0.1 29.9 622 622 --MSW Assessment Well LFG-101 15:31 60 0.0 0.2 20.7 79.1 0 0 0.0 C&D Compliance Well LFG-102 15:28 60 0.0 3.1 16.9 80.0 0 0 0.0 C&D Compliance Well LFG-103 15:35 60 0.0 9.3 12.0 78.7 0 0 0.0 C&D Compliance Well Completed by: Monitoring Equipment: GEM 2000 Plus Starting Temperature: 54.0° F 52.0° F Starting Barometric Pressure: 30.28 in Hg 30.27 in Hg BOUNDARY PROBE MONITORING LOG Henderson County Landfill 0839650617.202 Greg Wiggins David Reedy Date:11/13/17 Project Name: Project Number: Site Contact: Technician(s): End Temperature: End Barometric Pressure: Monitoring Location Time Time Pumped (sec) % Methane (CH4) % Carbon Dioxide (CO2) % Oxygen (O2) % Balance Gas Initial % LEL Stabalized % LEL Hydrogen Sulfide (H2S, ppm) Monitoring Point Location Cut-Off Trench Vent 1 14:39 60 0.0 0.0 21.2 78.8 0 0 0.0 Southern Vent Cut-Off Trench Vent 2 14:41 60 3.0 5.2 17.0 74.8 60 60 0.0 Northern Vent Completed by: CUT-OFF TRENCH LFG VENT MONITORING LOG Henderson County Landfill 0839650617.202 Greg Wiggins David Reedy Starting Temperature: 54.0° F 52.0° F Starting Barometric Pressure: 30.28 in Hg 30.27 in Hg Monitoring Equipment: GEM 2000 Plus PRIVATEPROPERTYMW-10MW-13MW-12MW-11MW-9MW-8MW-7MW-6MW-5BR-1BR-2BR-3AMW-1SAMW-1DAMW-2DAMW-2SMP-3MP-6MP-1SW-1MP-5MW-2MW-1OLD MW-1OLD MW-2HENDERSON COUNTYBUS GARAGEMAINTENANCE FACILITYTRANSFERSTATIONCLOSED C&D LANDFILLLOCATED ON MSW AREACLOSED MSWLANDFILLCLOSED WOODWASTE AND WHITEGOODSCLOSEDDEMOLITIONLANDFILL AREACLOSED C&DLANDFILLACTIVITYBUILDINGPOST 1991 AREAHENDERSON COUNTYANIMAL SHELTERCLOSED TVADISPOSAL AREALFG-101LFG-102LFG-103BREAK HOUSETRACEBARNSCALE HOUSECONVENIENCE CENTERTR-2TR-3EW-40EW-4EW-3EW-26EW-27EW-2EW-1EW-29EW-50EW-37EW-31EW-0EW-30EW-33EW-32EW-22EW-49EW-34EW-21EW-23EW-47EW-48EW-38EW-36EW-25EW-28EW-41EW-42EW-17EW-16EW-5EW-6EW-19EW-43EW-45EW-13EW-44EW-46EW-19AEW-20EW-12EW-11EW-10EW-8EW-9EW-712345678EW-X2EW-X5EW-X6EW-X1MP-7MP-8MP-9MP-4CUT-OFF TRENCH VENT 1CUT-OFF TRENCH VENT 2CONSULTANTDESIGNPREPAREDREVIEWAPPROVEDYYYY-MM-DDTITLEPROJECT No.Rev.PROJECTCLIENTPath: \\greensboro\CAD\_2008\08396506 - Henderson\PRODUCTION\_I - 2016 LFG Remediation Plan\ | File Name: 0839650616I004.dwg IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI D01 in0839650616PHASE600DRAWING21 2016-09-12MAKDYRDYRRPKHENDERSON COUNTY CLOSED MSW AND C&D LANDFILLPERMIT # 45-01HENDERSON COUNTYMETHANE MONITORING LOCATION MAPEXISTING 10 FT. CONTOUREXISTING 2 FT. CONTOURPROPERTY LINELIMITS OF WASTESTREAMBUFFERTREELINEEXISTING ROADFENCELFG COLLECTION PIPINGLFG CUT-OFF TRENCHCOMPLIANCE MONITORING WELLNON COMPLIANCE MONITORING WELLSCOMPLIANCE METHANE MONITORING WELLSASSESSMENT METHANE MONITORING WELLSSURFACE WATER MONITORING POINTLFG EXTRACTION WELL CONVERTED TO PASSIVE VENTINGMW-8MP-6BR-1MW-11.TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET2.COORDINATE SYSTEM IS N.C. STATE PLANE GRID.3.TOPOGRAPHIC DIVIDING LINE DIVIDES THE BASE MAP TOPOGRAPHIC CONTOURS FROM LANDSATTOPOGRAPHIC CONTOURS. LANDSAT TOPOGRAPHIC CONTOURS HAVE A 5-CONTOUR INTERVAL.4.RECORDS WERE UNABLE TO BE LOCATED FOR LFG EXTRACTION WELLS EW-X1 THROUGH EW-X7 AND WEREGIVEN IDENTIFICATION NAMES UNTIL SUCH TIME THAT RECORDS ARE FOUND.5.LOCATION OF COMPLIANCE METHANE MONITORING WELL MP-4 IS APPROXIMATE.1.BASE MAP PROVIDED BY CAMP DRESSER & McKEE FROM PREVIOUS WATER QUALITY MONITORING REPORTS.2.WELLS MP-7, MP-8, AND MP-9 WERE SURVEYED BY REGIONAL LAND SURVEYING, INC. ON JUNE 11, 2015.EW-290FEET150 300SCALELEGENDNOTESREFERENCEMP-6SITE LOCATION MAP NOT TO SCALEN SITE LOCATION