HomeMy WebLinkAbout7906_Duke_DanRiverLF_EnvEventReport_20180802Dan River Landfill - Solid Waste Reporting Page 1 of 4
lows to the Solid Waste Environmental Event
Reporting
Event Title: Dan River Landfill (7906-INDUS) Stormwater Event
Report Date: August 2, 2018
Submitted to: NCDEQ Division of Waste Management (DWM)
Solid Waste Section
Regulatory agency contact: Larry Frost; 828-296-4704
Duke Energy contact: Melonie Martin; 336-669-2994
Duke Energy Facility: Dan River Steam Station
900 South Edgewood Road
Eden, NC 27288
Rockingham County
Permit No.: 7906-INDUS
1. Event Description
a. Date discovered: August 2, 2018
b. Material released?
(Yes/No) Description if yes:
Summary:
c. Field actions:
• After the site received 4.1" of rain (1.9in of rain last night and additional 2.5in since
0700 this morning), an inspection of the landfill was conducted.
• Stormwater containing CCR material day-lighted through the interim cover soil on the
Northeast corner of Cell 2 of the landfill and flowed into the perimeter ditch. This ditch flows into a contact stormwater basin which is routed through the NPDES
permitted outfall.
• No CCR material was out of the landfill system process.
2. Regulatory Contact
a. Date and time of regulatory contact:
August 2, 2018; 13:05
Regulatory agency: NCDEQ Division of Waste Management (DWM)
Contact name/number: Primary - Shawn McKee; 919-707-8284
Secondary - Larry Frost; 828-296-4704
Summary:
Melonie Martin sent an email with pictures to Shawn McKee and Larry Frost to
make them aware of the incident.
b. Date and time of additional regulatory agency contact: N/A
Regulatory agency: ________________________________
Contact name: __________ contacted by _________ (Duke)
Dan River Landfill - Solid Waste Reporting Page 2 of 4
Summary: _______________
3. Regulatory Site Visit
Was a regulatory visit conducted : (Yes/No)
a. Date and time of site visit:
month, day, year arrival time: ______, departure time: ______
b. Regulatory agency: __________
c. Attendees: ___________________
d. Duke Energy escort(s): _________
e. Areas inspected: None
f. Records reviewed: None
g. Issues indicated: None
4. Regulatory Recommendations:
• Submit Environmental Event Report to DWM to document the incident
5. Duke Energy Follow-Up Actions:
• Landfill Operations Contractor will repair the area with dry soil once the weather allows.
6. Photos
• See attached
cc: Ed Mussler - NCDEQ DWM
Larry Frost - NCDEQ DWM
Ed Sullivan - Duke Energy
Jason Jomp - Duke Energy
Jim Malloy - Duke Energy
Eric Kinstler - Duke Energy
Dan River Landfill - Solid Waste Reporting Page 3 of 4
Dan River Landfill - Solid Waste Reporting Page 4 of 4