HomeMy WebLinkAbout28001YWN_INSP_20180730FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined MSWLF LCID YW Notified X Transfer Compost SLAS COUNTY: Dare
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO: YWN-28001
CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: July 30, 2018 Date of Last Inspection: February 08, 2017
FACILITY NAME AND ADDRESS:
Town of Kill Devil Hills Yard Debris Storage & Mulching Facility
Off Veteran’s Dr., Rt. at circle, at end of gravel road
GPS COORDINATES: N:36.001576 E: -77.402508
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Lynn Lindsey – Solid Waste Management Supervisor
Telephone: 252-480-4041
Email address: lynnearl@kdhnc.com
FACILITY CONTACT ADDRESS:
Solid Waste Management Supervisor
P.O. Box 1719
Kill Devil Hills, NC 27948
PARTICIPANTS:
John College – NCDEQ-DWM-SWS
STATUS OF PERMIT:
Notified site – No permit required
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS: None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS; 01 – This Partial Facility Compliance was un-announced.
02 – Security is provided by a locking gate. Need to put a sign with contact information in the event of an emergency.
03 – Site is not open to the public. Only the Town of Kill Devil Hills has access to use this site. 04 – During this inspection it was noted that there are painted pallets, and a plastic bag in the unground
material. Please remove the non-conforming waste from piles before grinding.
05 – For the most part, the road is made of all-weather materials. 06 – All ground material is placed in windrows.
07 – No records were reviewed during this inspection. 08 – Please refer to the Yard Waste Notification Facility Guidance document that was given to Lynn Lindsey on the last inspection to see the un-accepted materials.
09 – Overall site appears to be managed well. 10 – Digital pictures taken during this facility inspection. Some attached to this report.
Please contact me if you have any questions or concerns regarding this inspection report.
________________________________________ Phone: 919-268-1524 _ Email: john.college@ncdenr.gov
Environmental Senior Specialist Regional Representative
Sent on: July 31, 2018 X Email Hand delivery US Mail Certified No. [ _]
Copies: * Andrew Hammonds, Eastern District Supervisor - Solid Waste Section
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
• 2 Painted Pallets. No painted, treated or processed wood allowed.
• Plastic bags are also not allowed. Compost that is in windrows.