Loading...
HomeMy WebLinkAbout7906_Duke_DanRiver_EnvEventReport_20180717Dan River Landfill - Solid Waste Reporting Page 1 of 3 Solid Waste Environmental Event Reporting Event Title: Dan River Material Delivery to Incorrect Landfill Report Date: July 17, 2018 Submitted to: NCDEQ Division of Waste Management (DWM) Solid Waste Section Regulatory agency contact: Shawn McKee; 919-707-8284 Duke Energy contact: Melonie Martin; 336-669-2994 Duke Energy Facility: Dan River Steam Station 900 South Edgewood Road Eden, NC 27288 Rockingham County Permit No.: 7906-INDUS 1. Event Description a. Date discovered: July 16, 2018 b. Material released? (Yes/No) Description if yes: Summary: c. Field actions: • Landfill operations contractor loaded trucks with CCR contaminated crane and truck mats to be disposed of in an offsite landfill (Republic Upper Piedmont Landfill in Rougemont, NC). • Truck drivers were given the wrong manifests and told to deliver material to Piney Hill Acres LCID Landfill in Kernersville, NC. • Two trucks delivered and dumped CCR contaminated wood material in LCID. 2. Regulatory Contact a. Date and time of regulatory contact: July 17, 2018 09:21 Regulatory agency: NCDEQ Division of Waste Management (DWM) Contact name/number: Primary - Shawn McKee; 919-707-8284 Summary: Melonie Martin contacted Shawn McKee by phone to inform her of the incident. A follow-up conference call was held at 15:00 to include Jason Jomp, site CCP Environmental Field Support. b. Date and time of additional regulatory agency contact: N/A Regulatory agency: ________________________________ Contact name: __________ contacted by _________ (Duke) Summary: _______________ 3. Regulatory Site Visit Dan River Landfill - Solid Waste Reporting Page 2 of 3 Was a regulatory visit conducted : (Yes/No) a. Date and time of site visit: month, day, year arrival time: ______, departure time: ______ b. Regulatory agency: __________ c. Attendees: ___________________ d. Duke Energy escort(s): _________ e. Areas inspected: None f. Records reviewed: None g. Issues indicated: None 4. Regulatory Recommendations: • Submit Environmental Event Report to DWM to document the incident 5. Duke Energy Follow-Up Actions: • Landfill Operations Contractor went to LCID Landfill to oversee excavation of the CCR contaminated material from the fill. • Trucks were sent back to the Dan River facility for verification before being routed to the correct landfill (Upper Piedmont). • Moving forward, only one individual from the Landfill Operations Contractor company will oversee offsite transport and disposal activities. That person will work directly with Duke CCP Environmental Field Support to ensure the correct manifests are used to dispose of the material in the correct facitlity. 6. Photos • See attached cc: Ed Mussler - NCDEQ DWM Larry Frost - NCDEQ DWM Ed Sullivan - Duke Energy Jason Jomp - Duke Energy Jim Malloy - Duke Energy Eric Kinstler - Duke Energy Dan River Landfill - Solid Waste Reporting Page 3 of 3 Truck #3104 Truck #3102