Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout8003_RowanCountyMethaneResults1stQTR_GWMR_20170130Date:01/18/17
Project Name: Project Number:
Site Contact: Technician:Michael Giggard
End Temperature:
End Barometric Pressure:
GEM 2000+
Monitoring Location Time Time Pumped
(sec)
% Methane
(CH4)
% Carbon
Dioxide
(CO2)
% Oxygen
(O2)
% Balance
Gas
Initial
% LEL
Stabilized
% LEL
Hydrogen
Sulfide
(H2S, ppm)
Static Pressure
(inches of H2O)
MMW-1 14:42 90 0.0 1.1 19.4 79.5 0.0 0.0 0.0 --
MMW-2A 14:50 90 0.0 1.6 17.6 80.8 0.0 0.0 0.0 --
MMW-3 14:56 90 2.4 12.6 8.7 76.3 48.0 48.0 0.0 --
MMW-4 15:00 90 0.0 3.2 13.9 82.9 0.0 0.0 0.0 --
MMW-5A 15:03 90 0.0 2.3 17.8 79.9 0.0 0.0 0.0 --
MMW-6A 15:06 90 0.0 1.8 13.9 84.3 0.0 0.0 0.0 --
MMW-7 15:11 90 0.0 3.6 14.6 81.8 0.0 0.0 0.0 --
MMW-CD 14:37 90 0.0 0.7 19.8 79.5 0.0 0.0 0.0 --
Maintenance Building 14:30 300 0.0 0.0 20.4 79.6 0.0 0.0 0.0 NA
Scalehouse 14:25 300 0.0 0.0 20.4 79.6 0.0 0.0 0.0 NA
MMW-2 (Assessment - Not Compliance)14:45 90 2.5 11.3 8.5 77.7 50.0 50.0 0.0 --
MMW-5 (Assessment - Not Compliance)15:15 90 10.0 7.7 11.5 70.8 200.0 200.0 0.0 --
MMW-6 (Assessment - Not Compliance)15:08 90 7.5 14.0 8.3 70.2 150.0 150.0 0.0 --
MMW-8 (Assessment - Not Compliance)15:20 90 13.1 11.8 8.1 67.0 262.0 262.0 0.0 --
Completed by:
Starting Temperature: 68.9 ° F
Rowan County Landfills
Michael Giggard
Starting Barometric Pressure:
Monitoring Equipment: GEM 2000
BOUNDARY PROBE MONITORING LOG
29.99 in Hg
0636572016.300
69.4 ° F
29.99 in Hg
Jeff Boyd
G:\PROJECTS\Rowan\0636572016\200 DRAFT Reports\208 DRAFT 2017 1st Quarterly Methane Report\2017-1-18 Working\2017-1-17 Landfill Gas Probe Log (Rev).xls
i2
i3
i1
660650670
680
690
700
700
690
680
670
660
650
640640
OLD
LANDFILL
ENTRANCE
SCALE
HOUSE
PROPERTY
LINE
100-YEAR
FLOODPLAIN
EXISTING
SEDIMENT
BASIN
EXISTING
SEDIMENT
BASIN
EXISTING
SEDIMENT
BASIN
FUTURE
MSW LANDFILL
(PHASES IV &V)
FRENCH DRAIN
SAMPLE POINT
TO SW-1
(SEE NOTE 6)
MMW-6A
MMW-2A
MMW-3MMW-4
MMW-CD
MMW-5A
710
710
MMW-1
EXISTING
SEDIMENT
BASIN
EXISTING
SEDIMENT
BASINMMW-7
MMW-6
706.42MW-9
705.69MW-16
684.64
MW-13
677.59
MW-12
SW-4
664.13MW-23
664.14MW-23A
683.40MW-20
694.65MW-1
681.00MW-24R
658.96MW-6
SW-3
645.84
MW-7
641.47MW-18R
641.50MW-19
706.57MW-17
SW-5
SW-2
MW-25
MW-26
MW-27A
MW-28
654.57654.76
658.12
661.42 MW-27
672.03
MMW-5
MMW-2
MMW-8
674.31MW-11
CONSULTANT
DESIGN
PREPARED
REVIEW
APPROVED
YYYY-MM-DD TITLE
PROJECT No.Rev.
PROJECTCLIENT
Path: \\greensboro\CAD\_2006\0636572 - Rowan Co\PRODUCTION\_E - GW 2016\ | File Name: 0636572015E002.dwgIF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI D01 in0636572016
PHASE
100
DRAWING
10
2016-09-29
BSD
BSD
DYR
RPK
ROWAN COUNTY ACTIVE LANDFILLS
PERMIT NO.80-03
ROWAN COUNTY, NORTH CAROLINA
ROWAN COUNTY
GROUNDWATER CONTOUR MAP
AUGUST 1, 2016
0
FEET
250 500
SCALE
EXISTING TOPOGRAPHIC CONTOUR
FACILITY BOUNDARY
APPROXIMATE LIMITS OF WASTE
GROUNDWATER SURFACE CONTOURS
APPROXIMATE GROUNDWATER FLOW SEGMENT USED TO CALCULATE GRADIENT
EXISTING GROUNDWATER MONITORING WELL WITH GROUNDWATER ELEVATION
PROPOSED GROUNDWATER MONITORING WELL
SURFACE WATER MONITORING POINT
COMPLIANCE METHANE MONITORING POINT
ASSESSMENT METHANE MONITORING POINT
NOT AVAILABLE
FRENCH DRAIN MONITORING POINT
LEGEND
NOTES
REFERENCES
i1i1
1. TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET.
2. GROUNDWATER SURFACE CONTOUR INTERVAL = 10 FEET.
3. GROUNDWATER ELEVATIONS MEASURED ON AUGUST 1, 2016.
4. GROUNDWATER CONTOURS ARE BASED ON LINEAR INTERPOLATION BETWEEN AND
EXTRAPOLATION FROM KNOWN DATA, TOPOGRAPHIC CONTOURS, AND KNOWN FIELD CONDITIONS.
THEREFORE, GROUNDWATER CONTOURS MAY NOT REFLECT ACTUAL GROUNDWATER
CONDITIONS.
5. GROUNDWATER CONTOUR LINES SHOW THE WATER TABLE SHAPE AND ELEVATION. THESE
CONTOURS ARE INFERRED LINES FOLLOWING THE GROUNDWATER SURFACE AT A CONSTANT
ELEVATION ABOVE SEA LEVEL. THE GROUNDWATER FLOW DIRECTION IS GENERALLY
PERPENDICULAR TO THE GROUNDWATER SURFACE CONTOURS, SIMILAR TO THE RELATIONSHIP
BETWEEN SURFACE WATER FLOW AND TOPOGRAPHIC CONTOURS.
6. SURFACE WATER MONITORING POINT SW-1 IS APPROXIMATELY 550 FEET OFF THE MAPPING LIMITS
SHOWN AND IS COLLECTED FROM SECOND CREEK.
7. MONITORING WELL MW-27A IS UTILIZED FOR WATER LEVEL MONITORING ONLY.
8. THE LOCATION OF THE FRENCH DRAIN MONITORING POINT IS APPROXIMATE.
650
1. OVERALL SITE BASE TOPOGRAPHY PROVIDED BY S&ME ENGINEERING, INC.
MW-25
NA
SW-4
MW-7645.84
SITE LOCATION MAP
1" = 10,000'
SITE LOCATION
PE C-2862
PG C-399
GOLDER ASSOCIATES NC, INC.