Loading...
HomeMy WebLinkAbout9703_INSP_20180621FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Wilkes Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 97-03 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill X DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: June 21, 2018 Date of Last Inspection: May 11, 2017 FACILITY NAME AND ADDRESS: Louisiana Pacific Corporation 1151 ABTCO Road North Wilkesboro, North Carolina 28659 GPS COORDINATES: N: 36.20102 W: 81.04109 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Sharon Wetzel, Environmental Manager Telephone: (336) 696-3464 (o) or (336) 466-2692 Email address: sharon.wetzel@lpcorp.com FACILITY CONTACT ADDRESS: Post Office Box 98 Roaring River, North Carolina 28669 PARTICIPANTS: Sharon Wetzel, Environmental Manager – Louisiana Pacific James Bowles, Land Application ORC – Louisiana Pacific George Stroud, Woodyard Supervisor – Louisiana Pacific Charles Gerstell, NCDEQ – Solid Waste Section STATUS OF PERMIT: A Permit to Operate Existing Landfill Unit & Horizontal Expansion Unit was issued to Louisiana-Pacific Corporation on February 4, 2016. This permit shall expire on December 28, 2019. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1.) The Louisiana-Pacific Corporation manufactures hardboard (construction) siding and operates a wood ash landfill located adjacent to the manufacturing facility. 2.) The landfill is permitted to accept wood ash generated from the wood-fired boilers and zinc borate sludge from the facility’s wastewater treatment plant. 3.) The permit and operations plan were verified. Both documents were current and available upon request. 4.) The facility is required to maintain a record of the amount of solid waste received at the landfill unit, compiled on a monthly basis. Disposal records for May 2017 to May 2018 were verified. The facility received a total of 10,781.15 tons of waste during this time. 5.) Groundwater monitoring was being performed semiannually as required. Facility staff take samples which are sent to Meritech, Inc. Environmental Laboratory for testing. Second semiannual sampling for 2017 (performed August 16, 2017) and first semiannual sampling for 2018 (performed February 20, 2018) were verified. 6.) Ms. Wetzel explained that contractors had been on site prior to the inspection to perform geotechnical work in relation to the future permit renewal application. Operations Inspection of the Landfill Unit: 7.) Waste was being placed in Phase 3B at the time of inspection. 8.) Inactive portions of the landfill were stable with native vegetation. The landfill had recent been mowed allowing for a thorough view of the entire landfill footprint. 9.) Multiple fire boxes equipped with hydrants and fire hoses were provided on top of the landfill to aid in fire control. 10.) The working face was well controlled at the time of inspection. 11.) The facility is approved to mix zinc borate sludge with ash for disposal within the landfill. The sludge to ash ratio is required to be an average of 2:1. 12.) No ponding or significant settling was observed on the landfill. 13.) The rock check dam located at the inlet to the culvert leading under the access road was in place and maintained at the time of inspection. However, Mr. Stroud explained that the culvert had been filled with concrete. 14.) Vegetation had begun to take root in the impoundment area of the riser basin located on site. It is recommended that all vegetation be removed from the basin during the next time the basin is dipped out to ensure proper storage within the device. 15.) A small area bare of vegetation was observed at the toe of the top lift and above the wooden posts provided for mowing purposes. This area was approximately 20-feet in length. Please take steps to stabilize this area with a groundcover sufficient to restrain erosion. No significant erosion of this area was observed at the time of inspection, but stabilization is needed. 16.) All groundwater monitoring wells were observed during the inspection. All wells were locked and labeled. 17.) Edge of waste markers were in place. 18.) The facility is secured by a gate and access must be granted via scale house personnel. 19.) All access roads were of all-weather construction and well maintained. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: (704) 235-2144 Charles T. Gerstell Environmental Senior Specialist Regional Representative Sent on: 6/29/18 X Email Hand delivery US Mail Certified No. [ _] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Digitally signed by Charles T. Gerstell DN: cn=Charles T. Gerstell, o=Divsion of Waste Management, ou=Solid Waste Section, email=charles.gerstell@ncdenr.gov, c=US Date: 2018.06.29 11:52:23 -04'00'