Loading...
HomeMy WebLinkAbout9229_INSP_20180607FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: WAKE Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9229T-TRANSFER-2009 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: May 30; June 7, 2018 Date of Last Inspection: May 10, 2018 FACILITY NAME AND ADDRESS: Shotwell Transfer Station II, Inc. 1506½ North Salem Street Apex, North Carolina 27502 GPS COORDINATES: N: 35.7476 W: -78.8527 FACILITY CONTACT NAME AND PHONE NUMBER: David King, 919-427-4104, dking@debrisrp.com Hunter King, 919-876-8485, hking@debrisrp.com Katie Kessing, 919-876-8485, kkessing@debrisrp.com Facility Office – 919-303-4723 FACILITY CONTACT ADDRESS: LANDOWNER OPERATOR Booth Properties, LLC Shotwell Transfer Station II, Inc. William J. Booth, Jr., Registered Agent David W. King, Jr., Registered Agent P.O. Box 156 424 Warehouse Drive Apex, NC 27502 Raleigh, NC 27610 Phone: 919-876-8485 Office: 919-876-8485 Fax: 919-363-3303 dking@debrisrp.com PARTICIPANTS: Liz Patterson, NCDEQ - Solid Waste Section Steve Tyson, Shotwell Transfer Station II, Inc. Angel Bentancourt, Shotwell Transfer Station II, Inc. STATUS OF PERMIT: Original Issue-PTC, PCM Transfer Station: January 18, 2002 Permit to Operate, PCM Transfer Station: February 1, 2002 Modification PTC, PCM Transfer Station: May 19, 2003 Modification PTO, PCM Transfer Station: September 16, 2005 PTO, (New permit operator and new facility name): March 25, 2009 Modification PTO, Shotwell Transfer Station II: April 24, 2015 Permit expires March 25, 2024 PURPOSE OF SITE VISIT: Follow-up Inspection FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 STATUS OF PAST NOTED VIOLATIONS: 15A NCAC 13B .0203(d) states: “By receiving solid waste at a permitted facility, the permittee(s) shall be considered to have accepted the conditions of the permit and shall comply with the conditions of the permit.” - RESOLVED General Permit Condition Number 5 states: “By initiating construction or receiving waste at this facility the permittee shall be considered to have accepted the terms and conditions of this permit.” - RESOLVED 15A NCAC 13B .0203(d) states: “By receiving solid waste at a permitted facility, the permittee(s) shall be considered to have accepted the conditions of the permit and shall comply with the conditions of the permit.” - RESOLVED Attachment 3, Conditions of Permit to Operate, Part VI: Transfer Station/ Treatment and Processing Unit, Item 11 states: “All water that comes in contact with solid waste, including vehicle wash down water, is leachate and must be captured and properly treated before release to the environment. a. The leachate control system, such as floor drains, leachate collection devices, sanitary sewer connections and leachate storage tanks, must be operational during facility operations. b. The tipping floor must drain away from the building entrance and into the leachate collection system.” - RESOLVED 15A NCAC 13B .0402(3) states: “Water that comes into contact with solid waste will be contained on site or properly treated prior to discharge from the site. An NPDES permit may be required prior to discharge to surface waters.” - RESOLVED 15A NCAC 13B .0402(7) states: “Appropriate method shall be provided to confine material subject to be blown by the wind within the area. At the conclusion of each day of operation, all windblown material resulting from the operation shall be collected and returned to the area by the owner or operator.” – RESOLVED Waste removed from pond and wetland area to waste was observed in the pond and wetland area to the south of the scale house. Fencing put up to better confine windblown. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 OBSERVED VIOLATIONS: NONE ADDITIONAL COMMENTS The facility is a reclamation and transfer facility for construction and demolition (C&D) debris. The facility PTO expires March 25, 2024. 1. Normal operation hours are 7:00am to 4:00pm. Per sign posted in scale house window facility is currently in operation Monday through Friday, 7:00am – 6:00pm and Saturday 7:00am – 2pm. 2. When not in operation, the facility is secured by a locked gate. The facility has proper signage. 3. Records not reviewed at this inspection. 4. The facility is permitted to receive “Construction or demolition debris”, inert debris, used asphalt, and land- clearing debris from Durham, Chatham, Franklin, Granville, Harnett, Johnston, Nash, Orange, and Wake counties. All C&D waste that is not recycled must be transported for disposal to the Shotwell Landfill located in Wendell, Permit Number 92-26; the Red Rock Disposal C&D Landfill in Holly Springs, Permit Number 92- 28; or the Material Recovery C&D Landfill in Raleigh, Permit Number 92-3. 5. The permit currently limits the amount of waste and recyclable material on-site to 1,800 tons. Please ensure that the total of all waste and recyclable material on-site does not exceed 1,800 tons at any given time. Wood was segregated from the incoming waste and stored adjacent to the trailer loading area. Wood is sent offsite for grinding Tipping pad on June 7, 2018 6. Concrete is stored until it is crushed periodically onsite. Painted block, concrete and asphalt delivered to the facility must be checked for lead paint prior to acceptance. Painted block, brick and asphalt at the facility must be The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 removed and properly disposed of facility must be removed and properly disposed of. 7. Except for inert debris, all recyclables must be sorted and stored in containers by the end of each operating day. Containers must be covered at the end of each operating day, and during precipitation events. All non-recyclables in the sorting area must be placed in transfer trailers for disposal by the end of each operating day. 8. Tires are removed from incoming waste and are sent to a permitted tire facility. Tires are being stored in a container until they are sent offsite. 9. Windblown waste at site well controlled. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 910-433-3353(O) elizabeth.patterson@ncdenr.gov Liz Patterson Environmental Senior Specialist Regional Representative Sent on: 6-12-2018 X Email Hand delivery US Mail Certified No. [ _] Copies: Jason Watkins, Field Operations Branch Head – Solid Waste Section Drew Hammonds, Eastern District Supervisor - Solid Waste Section Jessica Montie, Environmental Program Consultant - Solid Waste Section