Loading...
HomeMy WebLinkAboutDuke_Mayo_7305_LeachateLineUpdate_201805241 Mckee, Shawn From:Witt, Kimberlee <Kimberlee.Witt@duke-energy.com> Sent:Tuesday, May 22, 2018 5:08 PM To:Mckee, Shawn Cc:Werner, Elizabeth; Aufman, Shannon E; Sullivan, Ed M Subject:[External] Mayo Leachate Forcemain Update (PN 7305-INDUS) Attachments:2018-05-22 Mayo - FM.jpg CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  Report Spam.  Shawn‐    This email serves as a brief update on the investigation associated with the leachate force main at the Mayo Steam  Electric Plant Monofill (PN 7305‐INDUS).    Provisions were made on the Monofill force main line to video the condition.  Near Station 32+45 (~55’ upstream of  cleanout 3 located at Station 33+00 – see figure below), separation of a weld on the inner 6” HDPE pipe was  discovered.  Attached you can see an image from the camera inspection where the dual containment spacer is  visible.  At this time there is no apparent integrity issue with the outer 10” HDPE pipe.  The area will be excavated in  order to visually inspect the outer pipe and ultimately repair the primary pipe.   Hydro excavation of the area will begin  as soon as weather permits.    If you and your team would like, I can set up a conference call to brief you on the information in this email in addition to  any work that occurs between now and a conference call.   You mentioned that Friday might be preferred, just let me  know a suggested time and I will set up a call.    Should any condition change, or additional pertinent information become available prior to us potentially talking on  Friday, I will reach out to you immediately.    Regards‐  Kim  2     Kimberlee Witt, PE DUKE ENERGY Sr. Engineer - Environmental Services 3191 Pine Hall Rd. Walnut Cove, NC 27009 336-215-4576