HomeMy WebLinkAboutSW_F_0901-MSWLF-1981_20180501_I_FAFACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 8
UNIT TYPE:
Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: BLADEN
Closed MSWLF X HHW White goods Incin T&P FIRM PERMIT NO.: 0901-MSWLF-1981
CDLF Tire T&P / Collection
Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: May 1, 2018 Date of Last Inspection: June 1, 2017
FACILITY NAME AND ADDRESS:
Bladen County Landfill
1522 Mercer Mill Road
Elizabethtown, NC 28337
GPS COORDINATES: N: 34.60645° W: 78.61160°
FACILITY CONTACT NAME AND PHONE NUMBER:
Kip McClary, General Services Manager
910-862-6785
kmcclary@bladenco.org
FACILITY CONTACT ADDRESS:
272 Smith Circle
Elizabethtown, NC 28337
PARTICIPANTS:
Kip McClary, Bladen County
Amanda Freeman, NC DEQ – Solid Waste Section
Drew Hammonds, NC DEQ – Solid Waste Section
STATUS OF PERMIT:
Closed
PURPOSE OF SITE VISIT:
Project Closure Inspection
STATUS OF PAST NOTED VIOLATIONS: NA
OBSERVED VIOLATIONS: NA
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 8
ADDITIONAL COMMENTS
1. The purpose of this inspection was to conduct a closure evaluation of the Bladen Co. Closed MSW recapping
project.
2. The site must meet the original conditions of the approved facility closure drawing.
3. If the County would like to make the changes during the project permanent, a final drawing of the site must be
submitted for approval to NC DEQ Solid Waste Section, Ed Mussler, Section Chief by email to
ed.mussler@ncdenr.gov. The drawing shall account for the changes in contours, drainage and erosion control
measures and any other alterations made during the recapping project. Please, call Mr. Mussler at 919-707-
8281 with questions on the submittal.
4. Any waste protruding through the cap must be removed and properly disposed. Cable/wire was observed
protruding from the cap across multiple areas of the landfill.
5. Water was observed ponded within the limits of waste during this inspection. Per 15A NCAC 13B .0505 (5)(b)
Surface water shall not be impounded over or in waste.
6. Per 15A NCAC 13B .0505 (5)(c), Completed areas shall be adequately sloped to allow surface water runoff in a
controlled manner.
7. Large rocks and gravel protruding from the cap must be adequately covered or removed.
8. Erosion was observed across the entire area of the project. Adequate erosion control measures shall be
utilized to correct current erosion, prevent future erosion and prevent to prevent silt from leaving the site.
15A NCAC 13 B .0505 (4)(a) & (b).
9. It was apparent that the cap had been seeded with grass but, large areas of bare soil remain. The cap shall be
reseeded as necessary until stabilization is achieved. 15A NCAC 13B .0505 (6)(a) & (b).
10. Corrective measures are necessary as a result of this inspection and shall be completed within 30 days’ receipt
of this report.
Please contact me if you have any questions or concerns regarding this inspection report.
______________________________________ Phone: 910-433-3350 _
Amanda Freeman
Environmental Senior Specialist
Regional Representative
Sent on: 05/14/18 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor, Solid Waste Section
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 8
Cable/wire to be removed from the cap and properly disposed at an active msw landfill.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 8
Remove rocks or cover with appropriate depth of soil.
Erosion needs to be repaired across all sides of landfill.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 5 of 8
Erosion needs to be repaired across all sides of landfill.
Remove berm along road to prevent ponding water and erosion.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 6 of 8
Fix areas where water ponds over waste. Ponded water over waste.
Water ponded over waste.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 7 of 8
Area of depression and erosion on the north side of the landfill.
Very nice edge of waste markers. Trees must be removed from within the edges of waste.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 8 of 8
Trees need to be removed from within the edges of waste. Erosion needs to be repaired.
What is this and why was it dumped in this location? Needs to be addressed: spread out, and covered or removed.