HomeMy WebLinkAbout5203_INSP_20180507FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Jones
Closed
MSWLF HHW White
goods Incin C&D
T&P FIRM PERMIT NO.: 5203-CDLF-2013
CDLF X Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 7 May 2018
FACILITY NAME AND ADDRESS:
Maysville Construction and Demolition Debris Landfill
11710 NC Highway 17
Maysville, NC 28555
GPS COORDINATES: N: 34.93213 E: -077.24436
FACILITY CONTACT NAME AND PHONE NUMBER:
James E Maides
910.938.5900
FACILITY CONTACT ADDRESS:
Green Recycling Solutions, LLC
166 Center Street
Jacksonville, NC 28546
E-mail: jamesmaides@csbenc.com
PARTICIPANTS:
Kevin Dail; Green Recycling Solutions
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Active: Permit to Construct (PTC) Construction and Demolition (C&D) Landfill, Phase I issued 17 January 2014;
expires 17 January 2019.
PURPOSE OF SITE VISIT:
Pre-operative Facility Compliance Inspection of Phase I Cell 2
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a Construction and Demolition (C&D) waste Landfill.
2) This Facility is permitted to receive C&D waste generated in Carteret, Craven, Duplin, Jones, and Onslow
Counties.
3) This Facility is currently operating in Phase I Cell 1.
4) This Facility is currently only receiving C&D waste from the Maysville C&D Recycling and Recovery
Facility, permit #52-02.
5) This Facility does not accept wastes containing asbestos.
6) The Facility access road is of all-weather construction and is being well-maintained at this time.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20180507
Page 2 of 3
7) Permanent, highly visible, edge-of-liner markers delineating the waste disposal limits are maintained as
required.
8) Construction of Phase I Cell 2 has been completed. Construction appears to have been completed in
compliance with the approved construction plan.
9) The outside slopes are properly graded and have been seeded and mulched, however, areas of erosion were
observed. *Please repair the eroded areas, and re-seed any areas where the cover crop failed to fully
germinate. Continue to monitor the cover crop to ensure that it is established and maintained so that it is
suitable to prevent erosion. Any new areas of erosion will need to be graded, seeded, and mulched promptly.
10) Cell 2 may be put into operation upon issuance of the Permit to Operate.
11) The leachate collection system and storage tanks were reviewed. The system appears to be functioning
properly and is well maintained at this time.
12) Facility monitoring wells were reviewed.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20180507
Page 3 of 3
13) All monitoring wells reviewed were properly labelled and secured with functioning locks.
14) *Corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 15 May 2018 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenro.gov
Kevin Dail; Operations Supervisor/Green Recycling Solutions: kdail.gwr@gmail.com
Franky J Howard; Jones County Manager: fhoward@co.jones.nc.us
C: \2018\Jones\Facilities\52-03\Inspections\5203_INSP_20180507