Date of Site Inspection: June 15, 2017 Date of Last Inspection: June 21, 2016
FACILITY NAME AND ADDRESS:
Rogers CCP Landfill
James E Rogers Energy Complex (Formerly Cliffside Steam Station)
573 Duke Power Road
Mooresboro, N.C. 28114
(828) 657-6314
GPS COORDINATES: N: 35.20534 W: -81.76547
FACILITY CONTACT NAME AND PHONE NUMBER:
Jessica Snyder, 309-824-1904, Jessica.Snyder@duke-energy.com
Ryan Czop, 980-373-2779, Ryan.Czop@duke-energy.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Shawn McKee – NCDEQ, Solid Waste Section
Elizabeth Werner - NCDEQ, Solid Waste Section
Larry Frost - NCDEQ, Solid Waste Section
Jessica Snyder - Duke Energy
Ryan Czop - Duke Energy
Scott Nordgren - Duke Energy
Moe Brothers - Duke Energy
Brian Kemp - Duke Energy
Steve Hodges - Duke Energy
Scott Saunders - Duke Energy
STATUS OF PERMIT:
Permit to Construct, Phase I, issued 6/4/2009
Permit to Operate, Phase I, issued 9/7/2012
Permit to Construct, Phase II, issued 9/17/2012
Permit to Construct, Phase II modification, issued 3/19/2014
The Permit to Operate, Phase II, Modification issued June 13, 2016 shall expire September 7, 2020
PURPOSE OF SITE VISIT:
Comprehensive Site Inspection and Pre-Operations meeting for Phase II.
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 2
ADDITIONAL COMMENTS
The facility is an industrial landfill permitted to receive "Coal combustion residuals" including (but not limited to) fly
ash, bottom ash, boiler slag, mill rejects, and flue gas desulfurization residue produced by a coal-fired generating unit
destined for disposal generated by any Duke Energy Corporation facilities, as well as geotextiles used in the
management of coal combustion products, and vacuum truck waste. The Permit to Operate shall expire September 7,
2020.
1) The facility permit, site plan, and operations plan were discussed during the inspection. Routine operations
occur during daylight hours.
2) The facility is operated by Charah, Inc. which is responsible for hauling materials to the landfill, daily
operations of the landfill, and conducting other associated activities. Charah, Inc. personnel are responsible for
daily landfill operations; certified staff are always present when the landfill is in operation. Annual Landfill
Operation Plan Training occurred on May 2, 2017.
The following Charah personnel are NC Certified Landfill Managers:
Walter Fox, NC Manager of Landfill Operations, 13-02M-00092, expires 9/20/19
Chris Emory, NC Manager of Landfill Operations, 13-02M-00079, expires 7/24/19
Virgil Toms, NC Certified Landfill Manager, 15-02M-000153, expires 12/3/18
Daniel Reese, NC Certified Landfill Manager, 14-02M-0013, expires 7/23/17
Camron Smith, NC Certified Landfill Manager, 16-02M-00197, expires 10/14/19
3) Leachate is collected and is discharged to the leachate basin located outside the (SE) corner of the landfill. The
leachate is then pumped to the on-site NPDES permitted ash basin. The facility appeared to be maintaining
sufficient freeboard in the basin at the time of the inspection.
4) A weekly system check is performed on the leak detection alarm system. Logs from the leachate system were
reviewed during the inspection. Records were well organized and appear complete
Records indicated that he Phase 1 flow meter was not operational and had been out of service for 10 months.
Pump hours were still totalizing, thus gallons could be calculated. The facility reported that the flow meter was
returned to service on June 21, 2017.
5) Weekly logs of rainfall events and landfill inspections for erosion & sediment problems were reviewed during
the inspection. Permits are up-to-date.
6) Camera inspection and clean out of the leachate collection lines was conducted on September 15, 2016 by
Bio-Nomic Services.
7) Dust control records were reviewed during the inspection. They were well organized and appeared to be
complete.
8) The facility has an active stormwater permit which expires on 7/31/2018. Self-inspections are up to date.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and
any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
9) Monthly density records were reviewed during the inspection. They were well organized and appeared to be
complete.
10) Vacuum Truck records were reviewed during the inspection. They were well organized and appeared to be
complete.
11) Between January 1, 2017 and May 31, 2017, a total of 155,921.25 tons were landfilled in Phase I, and
94,496.71 tons were landfilled in Phase II. A combined total of 9,889.62 tons of ash were landfilled from June
1, 2017 to June 14, 2017.
12) No ash was being received from other facilities at the time of the inspection.
13) Samples from groundwater monitoring wells MW-1S, MW-1D, MW-2S, MW-2D, MW-3S, MW-3D, TW-1S,
TW-1D and TW-2 are collected semi-annually and analyzed for the Appendix I constituent list. Surface water
samples are collected from two locations (SW-1 and SW-2) from Suck Creek which is south of the landfill.
Sampling was last performed on October 12, 2016 and April 6, 2016.
14) The edge of waste is identified with permanent markers which are yellow and are being well maintained. The
edge of liner markers on the outside perimeter of the landfill are on the top of the perimeter berm, 6.5-ft. outside
of the actual edge of waste. Edge of waste markers are placed on top of the interior berms that separate each of
the cells.
15) Cells 3, 4 and 5 of Phase I are currently in use. Phase II is also active and in use. Bottom ash is being placed
around chimney drains to promote drainage and help reduce fines infiltrating into the leachate collection system.
Active waste placement in Phase II. Bottom ash berms surrounding chimney drain.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 4
16) Dust is being well controlled in the active areas of the landfill. Water trucks were in use at the time of the
inspection.
17) The access roads for the landfill are well maintained.
18) Trucks leaving the landfill wash exit through a wheel wash manned by staff using powerwashers to remove ash
from the sides of the trucks.
19) The perimeter stormwater ditches are free of exceisive sediments and are well maintained.
20) There was no evidence observed during the inspection of any leachate seeps or breakouts on the landfill.
Vegetation on the side slopes of the landfill was well established and was being well maintained.
21) There was no evidence of ponded water on the landfill. Grading in all active areas appeared to be sloped
towards the chimney drains and into the leachate collection system.
Please contact me if you have any questions or concerns regarding this inspection report.
_ Phone: 919-707-8284
Shawn McKee
Environmental Senior Specialist
Regional Representative
Sent on: June 29, 2017 Email:
X
Hand delivery US Mail Certified No. [ _]
Copies: Ellen Lorscheider, Section Chief, Solid Waste Section
Ed Mussler, Permitting Branch Head, Solid Waste Section
Jason Watkins, Field Operations Branch Head, Solid Waste Section
Elizabeth Werner, Permitting Hydrogeologist, Solid Waste Section
Larry Frost, Engineering Project Manager, Solid Waste Section