Loading...
HomeMy WebLinkAbout7603T_RandolphCoTransfer_Comment_LOSApp_DIN28799_201803261 Chao, Ming-tai From:Chao, Ming-tai Sent:Monday, March 26, 2018 12:32 PM To:'Moore, Daniel' Cc:paxton.arthurs@randolphcountync.gov; Patrone, John; Mussler, Ed Subject:Comments on the permit application, Randolph County Transfer Station, 7603T Hi Dan: DIN 28799 The Solid Waste Section (SWS) completes a review of the revised Facility Operations Plan dated February 27, 2018 (DIN 28782) and has one major concern regarding the existing leachate collection system inside the transfer station, specifically the tipping floor area. In the February 27, 2018 letter, you pointed out “…the leachate collection is currently inoperable.” After reviewing the facility historically submittals, the SWS determines that Randolph County (the County) and the Waste Management of Carolinas, Inc. (WM) must complete the following tasks prior to receiving a life-of-site permit approval to operate for the above-referenced transfer station. The existing permit expired on March 10, 2018. 1. Submittal of a work/construction plan to construct a new leachate collection system (piping, trench, etc.) on the existing tipping floor area inside the Transfer Station. The new collection system that is designed by a NC -registered Professional Engineer should connect the existing leachate collection system as described in the Section 4.0 Operational Procedures & Attachment No. 3 of the revised Facility Operations Plan dated February 27, 2018. The info of the new system including, but not limited to, layouts and sizes/dimensions of piping/trench/sump and material must be provided in the plan. The tipping floor may be subject to being regraded to facilitate floor-surface drain to the new system. The drawing(s) and typical details of the required info should be included in the work plan as well. The schedule to complete the construction must be determined and provided in the Work Plan. 2. The Facility Operations Plan should discuss the routine cleaning (including sludge removal), inspection and maintenance requirements of the entire leachate collection system including trench or trench grate/sump grate, pit strainer, pump station, etc. The requirements for the documentation and record- keeping should be also included in the Operations Plan. Upon approving, the SWS will issue the County (Land Owner) and WM (the Operator) a life-of-site Permit Approval to Construct to construct the approved new leachate collection system on the tipping area. A new Permit Approval to Operate that will expire on June 02, 2044 according to NCGS 130A-294 (a)(2) will be issued under the conditional approved status according to Rule 15A NCAC 13B .0203(b). Please contact myself if you have any question of the comments. Thanks and have a wonderful day. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 2 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.