HomeMy WebLinkAbout9401_INSP_20180315FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Washington
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 9401-INDUS-2008
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill X DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 15 March 2018 Date of Last Inspection: 11 October 2017
FACILITY NAME AND ADDRESS:
Domtar Paper Company Landfill
Ken Trowbridge Road
Plymouth, North Carolina
GPS COORDINATES: N: 35.84238 E: -076.77731
FACILITY CONTACT NAME AND PHONE NUMBER:
Arthur J (AJ) Golding
252.793.8843
FACILITY CONTACT ADDRESS:
Domtar Paper Company, LLC
PO Box 747
Plymouth, NC 27962
Attn: AJ Golding
E-mail: arthur.golding@domtar.com
PARTICIPANTS:
Arthur J (AJ) Golding; Domtar Paper Company-Environmental Engineer
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Active; Permit to Operate (PTO) Landfill 3 Phases 2, 3, and 4 issued 4 October 2013. *This permit expires 22 May
2018. Pursuant to 15A NCAC 13B .0201(g) a complete permit review request including updated facility, operations,
and waste screening plans was due on or before 22 November 2017. This application was submitted to the Section and
is currently under review.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection to review corrective measures taken in response to FCIR
9401_INSP_20171011
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection, please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This facility is permitted to receive solid waste generated by and on the property of Domtar Paper Company,
LLC and the Weyerhaeuser Plymouth Lumber Technology Facility located off of Ken Trowbridge Road,
Plymouth, North Carolina.
2) This facility is recorded with the Washington County Register of Deeds at: Book 443; Page 595.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
9401_INSP_20180315
Page 2 of 4
3) The Facility access road is of all-weather construction and is being maintained in overall good condition at
this time.
4) This Facility is currently landfilling +/-4 tons of waste per day.
5) This landfill is currently operating in Unit III cell 2. Unit II Cell 1 has been closed and covered.
6) Phases 3 and 4 of the Landfill are currently being used for staging, screening, and processing ash from the
Domtar plant which is removed from the site for use as an agricultural soil amendment.
7) Highly visible edge-of-liner stakes are being maintained throughout the Facility.
8) The stormwater/sedimentation control basins were clear of excess sedimentation and woody vegetation and
appear well maintained at this time.
9) The surface water drainage and collection features are well maintained, in good working order, and appear to
be functioning properly at this time.
10) Leachate is collected and treated on-site at the Domtar Paper Company Wastewater Treatment plant.
11) The leachate collection system cleanouts are highly visible, accessible, protected, and well maintained.
12) A cover crop of native warm season grasses has been well established and maintained on the closed areas of
the landfill. The Facility cover crop is mowed throughout the growing season as needed.
13) Phase I of the filling and grading project to repair the differential settlement of the landfill has been
completed.
14) Differential settlement has caused of standing water along the lift transitions in several areas. These settled
areas are scheduled to be addressed in Phase II of the cap/settlement repair project. *Please continue to
communicate the progress of the repair project to the Solid Waste Section as Phase II commences and
proceeds.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
9401_INSP_20180315
Page 3 of 4
15) The area of leachate seepage noted in the previous inspections as being observed near the toe of the western
sideslope of Phase 1 has been repaired. No leachate was observed leaching from the landfill sideslopes during
this Facility Compliance Inspection. Some minor erosion and rilling from recent rain events was observed in
this area. This area is in need of seeding and mulching to establish a groundcover suitable to prevent erosion
of your landfill cap system. *Please closely monitor this area to ensure the effectiveness of the repairs. If
further leachate seepage is observed, measures should be taken to prevent the migration of leachate outside
the permitted disposal boundary.
16) No off-site erosion was observed during this Facility Compliance Inspection.
17) *Continued corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 20 March 2018 by X Electronic delivery US Mail Certified No.
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Diane Hardison; Environmental Manager/Domtar Paper Company: diane.hardison@domtar.com
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
9401_INSP_20180315
Page 4 of 4
C: \2018\Washington\Facilities\94-01\Inspections\9401_INSP_20180315