Loading...
HomeMy WebLinkAbout9401_INSP_20180315FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF LCID T&P YW Transfer Compost SLAS COUNTY: Washington Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9401-INDUS-2008 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill X DEMO SDTF FILE TYPE: COMPLIANCE Date of Inspection: 15 March 2018 Date of Last Inspection: 11 October 2017 FACILITY NAME AND ADDRESS: Domtar Paper Company Landfill Ken Trowbridge Road Plymouth, North Carolina GPS COORDINATES: N: 35.84238 E: -076.77731 FACILITY CONTACT NAME AND PHONE NUMBER: Arthur J (AJ) Golding 252.793.8843 FACILITY CONTACT ADDRESS: Domtar Paper Company, LLC PO Box 747 Plymouth, NC 27962 Attn: AJ Golding E-mail: arthur.golding@domtar.com PARTICIPANTS: Arthur J (AJ) Golding; Domtar Paper Company-Environmental Engineer Ray Williams; NCDEQ-Solid Waste STATUS OF PERMIT: Active; Permit to Operate (PTO) Landfill 3 Phases 2, 3, and 4 issued 4 October 2013. *This permit expires 22 May 2018. Pursuant to 15A NCAC 13B .0201(g) a complete permit review request including updated facility, operations, and waste screening plans was due on or before 22 November 2017. This application was submitted to the Section and is currently under review. PURPOSE OF SITE VISIT: Partial Facility Compliance Inspection to review corrective measures taken in response to FCIR 9401_INSP_20171011 STATUS OF PAST NOTED VIOLATIONS: None applicable OBSERVED VIOLATIONS: No violations were observed during this Facility Compliance Inspection, please see the ADDITIONAL COMMENTS section below. ADDITIONAL COMMENTS: 1) This facility is permitted to receive solid waste generated by and on the property of Domtar Paper Company, LLC and the Weyerhaeuser Plymouth Lumber Technology Facility located off of Ken Trowbridge Road, Plymouth, North Carolina. 2) This facility is recorded with the Washington County Register of Deeds at: Book 443; Page 595. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 9401_INSP_20180315 Page 2 of 4 3) The Facility access road is of all-weather construction and is being maintained in overall good condition at this time. 4) This Facility is currently landfilling +/-4 tons of waste per day. 5) This landfill is currently operating in Unit III cell 2. Unit II Cell 1 has been closed and covered. 6) Phases 3 and 4 of the Landfill are currently being used for staging, screening, and processing ash from the Domtar plant which is removed from the site for use as an agricultural soil amendment. 7) Highly visible edge-of-liner stakes are being maintained throughout the Facility. 8) The stormwater/sedimentation control basins were clear of excess sedimentation and woody vegetation and appear well maintained at this time. 9) The surface water drainage and collection features are well maintained, in good working order, and appear to be functioning properly at this time. 10) Leachate is collected and treated on-site at the Domtar Paper Company Wastewater Treatment plant. 11) The leachate collection system cleanouts are highly visible, accessible, protected, and well maintained. 12) A cover crop of native warm season grasses has been well established and maintained on the closed areas of the landfill. The Facility cover crop is mowed throughout the growing season as needed. 13) Phase I of the filling and grading project to repair the differential settlement of the landfill has been completed. 14) Differential settlement has caused of standing water along the lift transitions in several areas. These settled areas are scheduled to be addressed in Phase II of the cap/settlement repair project. *Please continue to communicate the progress of the repair project to the Solid Waste Section as Phase II commences and proceeds. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 9401_INSP_20180315 Page 3 of 4 15) The area of leachate seepage noted in the previous inspections as being observed near the toe of the western sideslope of Phase 1 has been repaired. No leachate was observed leaching from the landfill sideslopes during this Facility Compliance Inspection. Some minor erosion and rilling from recent rain events was observed in this area. This area is in need of seeding and mulching to establish a groundcover suitable to prevent erosion of your landfill cap system. *Please closely monitor this area to ensure the effectiveness of the repairs. If further leachate seepage is observed, measures should be taken to prevent the migration of leachate outside the permitted disposal boundary. 16) No off-site erosion was observed during this Facility Compliance Inspection. 17) *Continued corrective measures are required as a result of this Facility Compliance Inspection. Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report. Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative Delivered on: 20 March 2018 by X Electronic delivery US Mail Certified No. cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov Diane Hardison; Environmental Manager/Domtar Paper Company: diane.hardison@domtar.com FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 9401_INSP_20180315 Page 4 of 4 C: \2018\Washington\Facilities\94-01\Inspections\9401_INSP_20180315 NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx   Go Green! Thank you for helping NCDEQ be environmentally responsible.