Loading...
HomeMy WebLinkAbout9229_INSP_20180202FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: WAKE Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9229T-TRANSFER-2009 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: January 24, 2018, February 2, 2018 Date of Last Inspection: August 3, 2017 FACILITY NAME AND ADDRESS: Shotwell Transfer Station II, Inc. 1506½ North Salem Street Apex, North Carolina 27502 GPS COORDINATES: N: 35.7476 W: -78.8527 FACILITY CONTACT NAME AND PHONE NUMBER: David King, 919-427-4104, dking@debrisrp.com Hunter King, 919-876-8485, hking@debrisrp.com Katie Kessing, 919-876-8485, kkessing@debrisrp.com Facility Office – 919-303-4723 FACILITY CONTACT ADDRESS: LANDOWNER OPERATOR Booth Properties, LLC Shotwell Transfer Station II, Inc. William J. Booth, Jr., Registered Agent David W. King, Jr., Registered Agent P.O. Box 156 3061 Berks Way, Suite 201 Apex, NC 27502 Raleigh, NC 27614 Phone: 919-876-8485 Office: 919-876-8485 Fax: 919-363-3303 dking@debrisrp.com PARTICIPANTS: Liz Patterson, NCDEQ-Solid Waste Section Hunter King, Shotwell Transfer Station II, Inc. Steve Tyson, Shotwell Transfer Station II, Inc. STATUS OF PERMIT: Original Issue-PTC, PCM Transfer Station: January 18, 2002 Permit to Operate, PCM Transfer Station: February 1, 2002 Modification PTC, PCM Transfer Station: May 19, 2003 Modification PTO, PCM Transfer Station: September 16, 2005 PTO, (New permit operator and new facility name): March 25, 2009 Modification PTO, Shotwell Transfer Station II: April 24, 2015 Permit expires March 25, 2024 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 OBSERVED VIOLATIONS: None ADDITIONAL COMMENTS The facility is a reclamation and transfer facility for construction and demolition (C&D) debris. The Permit is on file at the facility and was reviewed. The permit has been recorded with the Wake County Register of Deeds in book 013466, beginning on page 01523, as required by the Permit in Attachment 1, Part IV, Condition #3. The facility PTO expires March 25, 2024. 1. The facility is in operation Monday through Friday, 7:00 am – 4:00 pm. When not in operation, the facility is secured by a locked gate. The facility has proper signage. 2. The facility permit and operation plan were readily available and reviewed with the operator. 3. The facility is permitted to receive “Construction or demolition debris”, inert debris, used asphalt, and land- clearing debris from Durham, Chatham, Franklin, Granville, Harnett, Johnston, Nash, Orange, and Wake counties. All C&D waste that is not recycled must be transported for disposal to the Shotwell Landfill located in Wendell, Permit Number 92-26; the Red Rock Disposal C&D Landfill in Holly Springs, Permit Number 92- 28; or the Material Recovery C&D Landfill in Raleigh, Permit Number 92-31 4. The following are facility certified personnel: Steve Tyson – Transfer Station Operations Specialist, TS-2016047, expires May 25, 2019 Katie K. Webb – Transfer Station Operations Specialist, TS-2015092, expires November 5, 2018 Jose C. Mira – Transfer Station Operations Specialist, TS-2017043, expires April 11, 2020 5. Waste screening reports were verified for January 11, 2017 through February 1, 2018. Waste screening records were well organized. Facility was reminded that the Solid Waste Section recommends that 1% of incoming waste be screened by the random screening program. Current waste screening meets or exceeds that target. 6. As part of the normal operations, the staff undergoes regular training which occurs approximately every 6 weeks and covers rotating topics. 7. The permit currently limits the amount of waste and recyclable material on-site to 1,800 tons. Please ensure that the total of all waste and recyclable material on-site does not exceed 1,800 tons at any given time. Wood was segregated from the incoming waste and stored adjacent to the trailer loading area. Wood is sent offsite for grinding 8. Concrete is stored until it is crushed periodically onsite. Painted block, concrete and asphalt delivered to the facility must be checked for lead paint prior to acceptance. Painted block, brick and asphalt at the facility must be removed and properly disposed of. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 9. Snow and rain events in January created a drainage problem alongside the scale at the facility. The facility must be operated in accordance with the approved operations plan, permit, and site plan. Changes or modifications to the design or operations of the facility must be submitted to the permitting branch for approval before making changes. An updated site plan will be required to show changes. Drainage issue alongside scale 10. All waste staged for transport and operational areas where waste may be piled up for processing must be managed on an impervious surface that will not allow leachate to come in contact ground or surface waters. One area of tipping pad in the northeastern corner appears to be slightly depressed and holding water. Depressions in the working area should be filled and leveled as noticed to reduce onsite ponding during and after storm events. Northeastern corner of tipping pad FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 11. Except for inert debris, all recyclables must be sorted and stored in containers by the end of each operating day. Containers must be covered at the end of each operating day, and during precipitation events. All non- recyclables in the sorting area must be placed in transfer trailers for disposal by the end of each operating day. Tipping area 12. Tires are removed from incoming waste and are sent to a permitted tire facility. Tires are being stored in a container until they are sent offsite. 13. Windblown waste at the site well controlled. 14. Corrective measures are necessary at this facility. Measures to bring the facility into compliance must be completed within 30 days receipt of this report. The SWS will conduct a follow-up inspection in 30 days to ensure issues noted in this inspection report have been addressed. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 910-433-3353(O) Liz Patterson Environmental Senior Specialist Regional Representative Sent on: 2-14-2018 X Email Hand delivery US Mail Certified No. [ _] Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section