HomeMy WebLinkAbout9229_INSP_20180202FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 4
UNIT TYPE:
Lined
MSWLF LCID YW Transfer X Compost SLAS COUNTY: WAKE
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 9229T-TRANSFER-2009
CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: January 24, 2018, February 2, 2018 Date of Last Inspection: August 3, 2017
FACILITY NAME AND ADDRESS:
Shotwell Transfer Station II, Inc.
1506½ North Salem Street
Apex, North Carolina 27502
GPS COORDINATES: N: 35.7476 W: -78.8527
FACILITY CONTACT NAME AND PHONE NUMBER:
David King, 919-427-4104, dking@debrisrp.com
Hunter King, 919-876-8485, hking@debrisrp.com
Katie Kessing, 919-876-8485, kkessing@debrisrp.com
Facility Office – 919-303-4723
FACILITY CONTACT ADDRESS:
LANDOWNER OPERATOR
Booth Properties, LLC Shotwell Transfer Station II, Inc.
William J. Booth, Jr., Registered Agent David W. King, Jr., Registered Agent
P.O. Box 156 3061 Berks Way, Suite 201
Apex, NC 27502 Raleigh, NC 27614
Phone: 919-876-8485 Office: 919-876-8485
Fax: 919-363-3303 dking@debrisrp.com
PARTICIPANTS:
Liz Patterson, NCDEQ-Solid Waste Section
Hunter King, Shotwell Transfer Station II, Inc.
Steve Tyson, Shotwell Transfer Station II, Inc.
STATUS OF PERMIT:
Original Issue-PTC, PCM Transfer Station: January 18, 2002
Permit to Operate, PCM Transfer Station: February 1, 2002
Modification PTC, PCM Transfer Station: May 19, 2003
Modification PTO, PCM Transfer Station: September 16, 2005
PTO, (New permit operator and new facility name): March 25, 2009
Modification PTO, Shotwell Transfer Station II: April 24, 2015
Permit expires March 25, 2024
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 4
OBSERVED VIOLATIONS:
None
ADDITIONAL COMMENTS
The facility is a reclamation and transfer facility for construction and demolition (C&D) debris. The Permit is on
file at the facility and was reviewed. The permit has been recorded with the Wake County Register of Deeds in
book 013466, beginning on page 01523, as required by the Permit in Attachment 1, Part IV, Condition #3. The
facility PTO expires March 25, 2024.
1. The facility is in operation Monday through Friday, 7:00 am – 4:00 pm. When not in operation, the facility is
secured by a locked gate. The facility has proper signage.
2. The facility permit and operation plan were readily available and reviewed with the operator.
3. The facility is permitted to receive “Construction or demolition debris”, inert debris, used asphalt, and land-
clearing debris from Durham, Chatham, Franklin, Granville, Harnett, Johnston, Nash, Orange, and Wake
counties. All C&D waste that is not recycled must be transported for disposal to the Shotwell Landfill located
in Wendell, Permit Number 92-26; the Red Rock Disposal C&D Landfill in Holly Springs, Permit Number 92-
28; or the Material Recovery C&D Landfill in Raleigh, Permit Number 92-31
4. The following are facility certified personnel:
Steve Tyson – Transfer Station Operations Specialist, TS-2016047, expires May 25, 2019
Katie K. Webb – Transfer Station Operations Specialist, TS-2015092, expires November 5, 2018
Jose C. Mira – Transfer Station Operations Specialist, TS-2017043, expires April 11, 2020
5. Waste screening reports were verified for January 11, 2017 through February 1, 2018. Waste screening records
were well organized. Facility was reminded that the Solid Waste Section recommends that 1% of incoming
waste be screened by the random screening program. Current waste screening meets or exceeds that target.
6. As part of the normal operations, the staff undergoes regular training which occurs approximately every 6
weeks and covers rotating topics.
7. The permit currently limits the amount of waste and recyclable material on-site to 1,800 tons. Please ensure
that the total of all waste and recyclable material on-site does not exceed 1,800 tons at any given time. Wood
was segregated from the incoming waste and stored adjacent to the trailer loading area. Wood is sent offsite
for grinding
8. Concrete is stored until it is crushed periodically onsite. Painted block, concrete and asphalt delivered to the
facility must be checked for lead paint prior to acceptance. Painted block, brick and asphalt at the facility must
be removed and properly disposed of.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 4
9. Snow and rain events in January created a drainage problem alongside the scale at the facility. The
facility must be operated in accordance with the approved operations plan, permit, and site plan.
Changes or modifications to the design or operations of the facility must be submitted to the permitting
branch for approval before making changes. An updated site plan will be required to show changes.
Drainage issue alongside scale
10. All waste staged for transport and operational areas where waste may be piled up for processing must be
managed on an impervious surface that will not allow leachate to come in contact ground or surface waters.
One area of tipping pad in the northeastern corner appears to be slightly depressed and holding water.
Depressions in the working area should be filled and leveled as noticed to reduce onsite ponding during
and after storm events.
Northeastern corner of tipping pad
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 4
11. Except for inert debris, all recyclables must be sorted and stored in containers by the end of each operating day.
Containers must be covered at the end of each operating day, and during precipitation events. All non-
recyclables in the sorting area must be placed in transfer trailers for disposal by the end of each operating day.
Tipping area
12. Tires are removed from incoming waste and are sent to a permitted tire facility. Tires are being stored in a
container until they are sent offsite.
13. Windblown waste at the site well controlled.
14. Corrective measures are necessary at this facility. Measures to bring the facility into compliance must be
completed within 30 days receipt of this report. The SWS will conduct a follow-up inspection in 30 days to
ensure issues noted in this inspection report have been addressed.
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 910-433-3353(O)
Liz Patterson
Environmental Senior Specialist
Regional Representative
Sent on: 2-14-2018 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section