Loading...
HomeMy WebLinkAbout7906_Duke_DanRiverLF_EnvironmentalEventReport_20180207Dan River Landfill - Solid Waste Reporting Solid Waste Environmental Event Reporting Event Title: Dan River Leachate Line ARV Release Report Date: February 7, 2018 Submitted to: NCDEQ Division of Waste Management (DWM) Regulatory agency contact: Shawn McKee 919-707-8284 Duke Energy contact: Melonie Martin 336-669-2994 Duke Energy Facility: Dan River Steam Station Landfill 900 South Edgewood Road Eden, NC 27288 Rockingham County Permit No.: 7906-INDUS 1. Event Description a. Date: discovered Monday Feb. 5, 2018 b. Material released (Yes/No). Description if yes: landfill leachate & primary basin dewatering water from the onsite tank c. Summary: • On Friday, Feb. 2, operation of the system to pump from the leachate tank to the City of Eden was started. • On Saturday, Feb. 3 it was noted that there was an excess amount of water in vault 11 (last manhole on force main from tank to city). The water was pumped out of the vault but no leak was noted. • On Monday, Feb. 5 it was noted that the air release valve (ARV) in vault 11 had a small drip leak. No water was released to the environment as all of the water was contained within the vault. d. Field actions: • A replacement ARV was ordered on Monday, Feb. 5. • The ARV vaults were monitored when the system was in operation on Saturday, Monday and Tuesday. • Water was pumped from the vault and placed back into the leachate collection system. • The ARV in Vault 11 was removed on Feb. 6 and a plug has been put in its place. 2. Regulatory Contact a. Date and time of regulatory contact: February 7, 2018, 9:12 am Regulatory agency: NCDEQ Division of Waste Management (DWM) Contact name/number: Primary - Shawn McKee 919-707-8284 Summary: Phone conversation describing discovery of the leachate/basin water release. Dan River Landfill - Solid Waste Reporting 3. Regulatory Site Visit Was a regulatory visit conducted (Yes/No) 4. Regulatory Recommendations • NA 5. Duke Energy Follow-Up Actions: • An evaluation of all of the ARVs onsite is being conducted to determine if the ARVs are needed and if so, what means can be taken to ensure no releases to the environment. 6. Photos: Photo 1 - Vault 11 (last ARV manhole on force main from tank to City of Eden Dan River Landfill - Solid Waste Reporting Photo 2 - Air release valve in Vault 11. Notice the drip from the vent. Photo 3 - Plug in place of ARV in Vault 11. Dan River Landfill - Solid Waste Reporting cc: Ed Mussler - NCDEQ DWM Larry Frost - NCDEQ DWM Elizabeth Werner - NCDEQ DWM Ed Sullivan - Duke Energy Dana Newcomb - Duke Energy Jason Jomp - Duke Energy Jeff Gateley - Duke Energy Eric Kinsler - Duke Energy